首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 140 毫秒
1.
Traditionally, using a control chart to monitor a process assumes that process observations are normally and independently distributed. In fact, for many processes, products are either connected or autocorrelated and, consequently, obtained observations are autocorrelative rather than independent. In this scenario, applying an independence assumption instead of autocorrelation for process monitoring is unsuitable. This study examines a generally weighted moving average (GWMA) with a time-varying control chart for monitoring the mean of a process based on autocorrelated observations from a first-order autoregressive process (AR(1)) with random error. Simulation is utilized to evaluate the average run length (ARL) of exponentially weighted moving average (EWMA) and GWMA control charts. Numerous comparisons of ARLs indicate that the GWMA control chart requires less time to detect various shifts at low levels of autocorrelation than those at high levels of autocorrelation. The GWMA control chart is more sensitive than the EWMA control chart for detecting small shifts in a process mean.  相似文献   

2.
The memory-type control charts are widely used in the process and service industries for monitoring the production processes. The reason is their sensitivity to quickly react against the small process disturbances. Recently, a new cumulative sum (CUSUM) chart has been proposed that uses the exponentially weighted moving average (EWMA) statistic, called the EWMA–CUSUM chart. Similarly, in order to further enhance the sensitivity of the EWMA–CUSUM chart, we propose a new CUSUM chart using the generally weighted moving average (GWMA) statistic, called the GWMA–CUSUM chart, for efficiently monitoring the process mean. The GWMA–CUSUM chart encompasses the existing CUSUM and EWMA–CUSUM charts. Extensive Monte Carlo simulations are used to explore the run length profiles of the GWMA–CUSUM chart. Based on comprehensive run length comparisons, it turns out that the GWMA–CUSUM chart performs substantially better than the CUSUM, EWMA, GWMA, and EWMA–CUSUM charts when detecting small shifts in the process mean. An illustrative example is also presented to explain the implementation and working of the EWMA–CUSUM and GWMA–CUSUM charts.  相似文献   

3.
Two methods that are often used to evaluate the run length distribution of quality control charts are the Markov chain and integral equation approaches. Both methods have been used to evaluate the cumulative sum (CUSUM) charts and the exponentially weighted moving average (EWMA) control charts. The Markov chain approach involves "discretiz-ing" the possible values which can be plotted. Using properties of finite Markov chains, expressions for the distribution of the run length, and for the average run length (ARL), can be obtained. For the CUSUM and EWMA charts there exist integral equations whose solution gives the ARL. Approximate methods can then be used to solve the integral equation. In this article we show that if the product midpoint rule is used to approximate the integral in the integral equation, then both approaches yield the same approximations for the ARL. In addition we show that the recursive expressions for the probability functions are the same for the two approaches. These results establish the integral equation approach as preferable whenever an integral equation can be found  相似文献   

4.
CUSUM control schemes for Gaussian processes   总被引:1,自引:1,他引:0  
A CUSUM control scheme for detecting a change point in a Gaussian process is derived. An upper and a lower bound for the distribution of the run length and for its moments is given. In a Monte Carlo study the average run length (ARL) of this chart is compared with the ARL of two other CUSUM procedures which are based on approximations to the sequential probability ratio, and, moreover, with EWMA schemes for autocorrelated data. Results on the optimal choice of the reference value are presented. Furthermore it is investigated how these charts behave if the model parameters are estimated.  相似文献   

5.
The adaptive memory-type control charts, including the adaptive exponentially weighted moving average (EWMA) and cumulative sum (CUSUM) charts, have gained considerable attention because of their excellent speed in providing overall good detection over a range of mean shift sizes. In this paper, we propose a new adaptive EWMA (AEWMA) chart using the auxiliary information for efficiently monitoring the infrequent changes in the process mean. The idea is to first estimate the unknown process mean shift using an auxiliary information based mean estimator, and then adaptively update the smoothing constant of the EWMA chart. Using extensive Monte Carlo simulations, the run length profiles of the AEWMA chart are computed and explored. The AEWMA chart is compared with the existing control charts, including the classical EWMA, CUSUM, synthetic EWMA and synthetic CUSUM charts, in terms of the run length characteristics. It turns out that the AEWMA chart performs uniformly better than these control charts when detecting a range of mean shift sizes. An illustrative example is also presented to demonstrate the working and implementation of the proposed and existing control charts.  相似文献   

6.
An accurate numerical procedure is presented for computing the average run length (ARL) of an exponentially weighted moving average (EWMA) chart under a linear drift in the process mean. The performance of an EWMA chart is then evaluated under a linear drift in the mean. In processes where gradual linear drifts rather than abrupt changes in the mean model the shifts in the mean more accurately, an evaluation of the performance of an EWMA chart under a linear drift is more appropriate. Tables of optimal smoothing parameters and control chart limits are given which make the design of EWMA charts easy.  相似文献   

7.
Some properties of control procedures with variable sampling intervals (VSI) have been investigated in recent years by Amin, Renolds et al, and others. Such procedures have been shown to be more efficient when compared to the corresponding fixed sampling interval (FSI) charts with respect to the Average Time to Signal (ATS) when the Average Run Length (ARL) values for both types of procedures are held equal. Frequent switching between the different sampling intervals can be a complicating factor in the application of control charts with variable sampling intervals (VSI). This problem is being addressed in this article, and improved switching rules are presented and evaluated for Shewhart, CUSUM, and EWMA control procedures. The proposed rules considerably reduce the average number of switches between the sampling intervals and also improve the ATS properties of the control procedures when compared to the conventional variable sampling interval procedures  相似文献   

8.
Control chart is an important statistical technique that is used to monitor the quality of a process. Shewhart control charts are used to detect larger disturbances in the process parameters, whereas cumulative sum (CUSUM) and exponential weighted moving average (EWMA) are meant for smaller and moderate changes. In this study, we enhanced mixed EWMA–CUSUM control charts with varying fast initial response (FIR) features and also with a runs rule of two out of three successive points that fall above the upper control limit. We investigate their run-length properties. The proposed control charting schemes are compared with the existing counterparts including classical CUSUM, classical EWMA, FIR CUSUM, FIR EWMA, mixed EWMA–CUSUM, 2/3 modified EWMA, and 2/3 CUSUM control charting schemes. A case study is presented for practical considerations using a real data set.  相似文献   

9.
Grouped data exponentially weighted moving average control charts   总被引:2,自引:0,他引:2  
In the manufacture of metal fasteners in a progressive die operation, and other industrial situations, important quality dimensions cannot be measured on a continuous scale, and manufactured parts are classified into groups by using a step gauge. This paper proposes a version of exponentially weighted moving average (EWMA) control charts that are applicable to monitoring the grouped data for process shifts. The run length properties of this new grouped data EWMA chart are compared with similar results previously obtained for EWMA charts for variables data and with those for cumulative sum (CUSUM) schemes based on grouped data. Grouped data EWMA charts are shown to be nearly as efficient as variables-based EWMA charts and are thus an attractive alternative when the collection of variables data is not feasible. In addition, grouped data EWMA charts are less affected by the discreteness that is inherent in grouped data than are grouped data CUSUM charts. In the metal fasteners application, grouped data EWMA charts were simple to implement and allowed the rapid detection of undesirable process shifts.  相似文献   

10.
The Weibull distribution is one of the most popular distributions for lifetime modeling. However, there has not been much research on control charts for a Weibull distribution. Shewhart control is known to be inefficient to detect a small shift in the process, while exponentially weighted moving average (EWMA) and cumulative sum control chart (CUSUM) charts have the ability to detect small changes in the process. To enhance the performance of a control chart for a Weibull distribution, we introduce a new control chart based on hybrid EWMA and CUSUM statistic, called the HEWMA-CUSUM chart. The performance of the proposed chart is compared with the existing chart in terms of the average run length (ARL). The proposed chart is found to be more sensitive than the existing chart in ARL. A simulation study is provided for illustration purposes. A real data is also applied to the proposed chart for practical use.  相似文献   

11.
A statistical quality control chart is an important tool of the statistical process control, which is widely used to control and monitor a production process. The CUSUM chart is designed to detect a specific shift, provided that the shift size is known in advance. In practice, however, shift sizes are rarely known. It is then customary to use an adaptive CUSUM chart, which can effectively detect a range of shift sizes. In this paper, we enhance the sensitivities of the improved adaptive CUSUM mean charts using an auxiliary-information-based (AIB) mean estimator. The run length performances of the proposed charts are compared with those of the AIB adaptive and non-adaptive CUSUM charts in terms of the average run length (ARL), extra quadratic loss, and integral relative ARL. These run length comparisons reveal that the proposed charts are more sensitive than the existing charts when detecting different kinds of shift in the process mean. An example is given to demonstrate the implementation of existing and proposed charts.  相似文献   

12.
In this article, we propose an exponentially weighted moving average (EWMA) control chart for the shape parameter β of Weibull processes. The chart is based on a moving range when a single measurement is taken per sampling period. We consider both one-sided (lower-sided and upper-sided) and two-sided control charts. We perform simulations to estimate control limits that achieve a specified average run length (ARL) when the process is in control. The control limits we derive are ARL unbiased in that they result in ARL that is shorter than the stable-process ARL when β has shifted. We also perform simulations to determine Phase I sample size requirements if control limits are based on an estimate of β. We compare the ARL performance of the proposed chart to that of the moving range chart proposed in the literature.  相似文献   

13.
The memory-type adaptive and non-adaptive control charts are among the best control charts for detecting small-to-moderate changes in the process parameter(s). In this paper, we propose the Crosier CUSUM (CCUSUM), EWMA, adaptive CCUSUM (ACCUSUM) and adaptive EWMA (AEWMA) charts for efficiently monitoring the changes in the covariance matrix of a multivariate normal process without subgrouping. Using extensive Monte Carlo simulations, the length characteristics of these control charts are computed. It turns out that the ACCUSUM and AEWMA charts perform uniformly and substantially better than the CCUSUM and EWMA charts when detecting a range of shift sizes in the covariance matrix. Moreover, the AEWMA chart outperforms the ACCUSUM chart. A real dataset is used to explain the implementation of the proposed control charts.  相似文献   

14.
ABSTRACT

Runs rules are usually used with Shewhart-type charts to enhance the charts' sensitivities toward small and moderate shifts. Abbas et al. in 2011 took it a step further by proposing two runs rules schemes, applied to the exponentially weighted moving average (EWMA) chart and evaluated their average run length (ARL) performances using simulation. They showed that the proposed schemes are superior to the classical EWMA chart and other schemes being investigated. Besides pointing out some erroneous ARL and standard deviation of the run length (SDRL) computations in Abbas et al., this paper presents a Markov chain approach for computing the ARL, percentiles of the run length (RL) distribution and SDRL, for the two runs rules schemes of Abbas et al. Using Markov chain, we also propose two combined runs rules EWMA schemes to quicken the two schemes of Abbas et al. in responding to large shifts. The runs rules (basic and combined rules) EWMA schemes will be compared with some existing control charting methods, where the former charts are shown to prevail.  相似文献   

15.
In practice, different practitioners will use different Phase I samples to estimate the process parameters, which will lead to different Phase II control chart's performance. Researches refer to this variability as between-practitioners-variability of control charts. Since between-practitioners-variability is important in the design of the CUSUM median chart with estimated process parameters, the standard deviation of average run length (SDARL) will be used to study its properties. It is shown that the CUSUM median chart requires a larger amount of Phase I samples to sufficiently reduce the variation in the in-control ARL of the CUSUM median chart. Considering the limitation of the amount of the Phase I samples, a bootstrap approach is also used here to adjust the control limits of the CUSUM median chart. Comparisons are made for the CUSUM and Shewhart median charts with estimated parameters when using the adjusted- and unadjusted control limits and some conclusions are made.  相似文献   

16.
Shewhart, cumulative sum (CUSUM), and exponentially weighted moving average (EWMA) control procedures with variable sampling intervals (VSI) have been investigated in recent years for detecting shifts in the process mean. Such procedures have been shown to be more efficient when compared with the corresponding fixed sampling interval (FSI) charts with respect to the average time to signal (ATS) when the average run length (ARL) values of both types of procedures are held equal. Frequent switching between the different sampling intervals can be a complicating factor in the application of control charts with variable sampling intervals. In this article, we propose using a double exponentially weighted moving average control procedure with variable sampling intervals (VSI-DEWMA) for detecting shifts in the process mean. It is shown that the proposed VSI-DEWMA control procedure is more efficient when compared with the corresponding fixed sampling interval FSI-DEWMA chart with respect to the average time to signal (ATS) when the average run length (ARL) values of both types of procedures are held equal. It is also shown that the VSI-DEWMA procedure reduces the average number of switches between the sampling intervals and has similar ATS properties as compared to the VSI-EMTMA control procedure  相似文献   

17.
In this article, we introduce a new multivariate cumulative sum chart, where the target mean shift is assumed to be a weighted sum of principal directions of the population covariance matrix. This chart provides an attractive performance in terms of average run length (ARL) for large-dimensional data and it also compares favorably to existing multivariate charts including Crosier's benchmark chart with updated values of the upper control limit and the associated ARL function. In addition, Monte Carlo simulations are conducted to assess the accuracy of the well-known Siegmund's approximation of the average ARL function when observations are normal distributed. As a byproduct of the article, we provide updated values of upper control limits and the associated ARL function for Crosier's multivariate CUSUM chart.  相似文献   

18.
The CUSUM chart is good enough to detect small-to-moderate shifts in the process parameter(s) as it can be optimally designed to detect a particular shift size. The adaptive CUSUM (ACUSUM) chart provides good detection over a range of shift sizes because of its ability to update the reference parameter using the estimated process shift. In this paper, we propose auxiliary-information-based (AIB) optimal CUSUM (OCUSUM) and ACUSUM charts, named AIB-OCUSUM and AIB-ACUSUM charts, using a difference estimator of the process mean. The performance comparisons between existing and proposed charts are made in terms of the average run length (ARL), extra quadratic loss and integral relative ARL measures. It is found that the AIB-OCUSUM and AIB-ACUSUM charts are more sensitive than the AIB-CUSUM and ACUSUM charts, respectively. Moreover, the AIB-ACUSUM chart surpasses the AIB-OCUSUM chart when detecting a range of mean shift sizes. Illustrative examples are given to support the theory.  相似文献   

19.
This article extends the generally weighted moving average (GWMA) technique for detecting changes in process variance. The proposed chart is called the generally weighted moving average variance (GWMAV) chart. Simulation is employed to evaluate the average run length (ARL) characteristics of the GWMAV and EWMA control charts. An extensive comparison of these control charts reveals that the GWMAV chart is more sensitive than the EWMA control charts for detecting small shifts in the variance of a process when the shifts are below 1.35 standard deviations. Additionally, the GWMAV control chart performs little better when the variance shifts are between 1.35 and 1.5 standard deviation, and the 2 charts performs similar when the variance shifts are above 1.5 standard deviation. The design of the GWMAV chart is also discussed.  相似文献   

20.
Some control charts have been proposed to monitor the mean of a Weibull process with type-I censoring. One type of control charts is to monitor changes in the scale parameter because it indicates changes in the mean. With this approach, we compare different control charts such as Shewhart-type and exponentially weighted moving average (EWMA) charts based on conditional expected value (CEV) and cumulative sum (CUSUM) chart based on likelihood-ratio. A simulation approach is employed to compute control limits and average run lengths. The results show that the CUSUM chart has the best performance. However, the EWMA-CEV chart is recommendable for practitioners with its competitive performance and ease of use advantage. An illustrative example is also provided.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号