首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
管理学   1篇
  2013年   1篇
排序方式: 共有1条查询结果,搜索用时 31 毫秒
1
1.
This paper proposes a model and solution method for coordinating integrated production and inventory cycles in a whole manufacturing supply chain involving reverse logistics for multiple items with finite horizon period. A whole manufacturing supply chain involving reverse logistic consists of tier-2 suppliers supplying raw materials to tier-1 suppliers, tier-1 suppliers producing parts, a manufacturer which manufactures and assembles parts from tier-1 suppliers into finished products, distributors distributing finished products to retailers, retailers selling products to end customers and a third party which collects the used finished products from end customers, dissembles collected products into parts, and feed the parts back to the supply chain. In this system, we consider a finite horizon period. A mathematical model for representing the behaviors of the system is developed. Solution methods based on decentralized and a combination of decentralized and centralized decision making process, referred to as the semi-centralized decision making process, are proposed to solve the model while the centralized decision making process is solved by a mixed integer nonlinear programming method. A numerical example is used to demonstrate the model and the solutions based on the three types of the coordination.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号