首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   4篇
  免费   0篇
管理学   1篇
统计学   3篇
  2021年   1篇
  2020年   1篇
  2017年   2篇
排序方式: 共有4条查询结果,搜索用时 437 毫秒
1
1.
Public Organization Review - The COVID-19 pandemic cast doubts on governments' traditional crisis responses and sparked a surge in citizen-led, participatory, bottom-up responses. Iran's...  相似文献   
2.
In this article, a new economical acceptance sampling model is proposed based on Taguchi loss function. The objective function of the model consists of inspection cost, scrap cost, and Taguchi loss function including producer loss and consumer loss. The expected total cost includes the loss for an inspected item plus the loss for an accepted item which has not been inspected. Decision-making is based on conforming run length. It is assumed that the quality characteristics follow normal distribution. A numerical example is solved for illustrating application of this model. Sensitivity analysis is proposed for illustrating the effect of some important parameters on the objective function. Finally, we compared the results of the proposed method with classical Dodge–Romig sampling plans tables based on average outgoing quality limit. The results confirmed the superiority of proposed model.  相似文献   
3.
Abstract

Profile monitoring is applied when the quality of a product or a process can be determined by the relationship between a response variable and one or more independent variables. In most Phase II monitoring approaches, it is assumed that the process parameters are known. However, it is obvious that this assumption is not valid in many real-world applications. In fact, the process parameters should be estimated based on the in-control Phase I samples. In this study, the effect of parameter estimation on the performance of four Phase II control charts for monitoring multivariate multiple linear profiles is evaluated. In addition, since the accuracy of the parameter estimation has a significant impact on the performance of Phase II control charts, a new cluster-based approach is developed to address this effect. Moreover, we evaluate and compare the performance of the proposed approach with a previous approach in terms of two metrics, average of average run length and its standard deviation, which are used for considering practitioner-to-practitioner variability. In this approach, it is not necessary to know the distribution of the chart statistic. Therefore, in addition to ease of use, the proposed approach can be applied to other type of profiles. The superior performance of the proposed method compared to the competing one is shown in terms of all metrics. Based on the results obtained, our method yields less bias with small-variance Phase I estimates compared to the competing approach.  相似文献   
4.
In this research, a new sampling system is introduced based on the concept of count of cumulative conforming control charts (CCC-charts). The proposed method is based on Markov modeling and negative binomial distribution. The proposed sampling system is compared with traditional sampling methods like Dodge–Romig single sampling plan based on lot tolerance percent defective (LTPD) and Dodge–Romig single sampling plan based on average outgoing quality limit (AOQL) and its superiority for larger values of lot sizes and process average is denoted using a comparison study.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号