Abstract: | The critical path in a PERT/CPM network is determined in various textbooks by finding the path with associated minimal slack for the network arcs or by finding the path with associated minimal slack for the network nodes. This paper points out that the use of nodes can result in a network path being incorrectly identified as a path of maximum length. |