首页 | 本学科首页   官方微博 | 高级检索  
     


MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY
Authors:D. Clay Whybark  J. Gregg Williams
Abstract:
This paper presents a framework for characterizing and studying the uncertainty which can affect inventory investment and service level performance in a material requirements planning (MRP) system. It also presents the results of a simulation experiment which compared two techniques (safety stock and safety lead time) for building inventory to protect against uncertainty. The simulation results disclose consistent differences between the techniques in protecting a representative part against timing and quantity uncertainty in both demand and supply for the part. The paper not only provides some initial insights into the behavior of MRP systems under uncertainty, but also establishes some guidelines for choosing between safety stock and safety lead time.
Keywords:
正在获取相似文献,请稍候...
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号