首页 | 本学科首页   官方微博 | 高级检索  
     


Semi-online scheduling with “end of sequence” information
Authors:Leah Epstein  Deshi Ye
Affiliation:(1) Department of Mathematics, University of Haifa, 31905 Haifa, Israel;(2) College of Computer Science, Zhejiang University, Hangzhou, 310027, China
Abstract:
We study a variant of classical scheduling, which is called scheduling with “end of sequence” information. It is known in advance that the last job has the longest processing time. Moreover, the last job is marked, and thus it is known for every new job whether it is the final job of the sequence. We explore this model on two uniformly related machines, that is, two machines with possibly different speeds. Two objectives are considered, maximizing the minimum completion time and minimizing the maximum completion time (makespan). Let s be the speed ratio between the two machines, we consider the competitive ratios which are possible to achieve for the two problems as functions of s. We present algorithms for different values of s and lower bounds on the competitive ratio. The proposed algorithms are best possible for a wide range of values of s. For the overall competitive ratio, we show tight bounds of ϕ + 1 ≈ 2.618 for the first problem, and upper and lower bounds of 1.5 and 1.46557 for the second problem. The authors would like to dedicate this paper to the memory of our colleague and friend Yong He who passed away in August 2005 after struggling with illness. D. Ye: Research was supported in part by NSFC (10601048).
Keywords:Online algorithms  Machine scheduling  Competitive analysis  Uniformly related machines
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号