首页 | 本学科首页   官方微博 | 高级检索  
     


The influence of parameter estimation on the ARL of Shewhart type charts for time series
Authors:Holger Kramer  Wolfgang Schmid
Affiliation:1. Institut für Statistik, Europa-Universit?t Viadrina, Gro?e Scharmstra?e 59, 15230, Frankfurt/Oder, Germany
Abstract:
In this paper we discuss the behavior of the Shewhart residual chart and the modified Shewhart chart if the parameters of the underlying process are unknown and thus have to be estimated. We focus on the estimation of the variance. For AR models we also consider the estimation of the AR coefficients. The average run length (ARL) of the control chart with estimated parameters is compared with the ARL of the scheme for known parameters and with the ARL for independent variables. Additionally, we give recommendations on the choice of the estimators in the context of Shewhart control schemes.
Keywords:Statistical process control  average run length  control schemes  Shewhart charts  residual charts  modified control charts  time series
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号