首页 | 本学科首页   官方微博 | 高级检索  
     


Flow shop scheduling with deteriorating jobs under dominating machines
Authors:Ji-Bo Wang  Zun-Quan Xia
Affiliation:1. Department of Science, Shenyang Institute of Aeronautical Engineering, Shenyang 110034, PR China;2. Department of Applied Mathematics, Dalian University of Technology, Dalian 116024, PR China
Abstract:This paper addresses no-wait or no-idle flow shop scheduling problems with deteriorating jobs, i.e., jobs whose processing times are an increasing function of their starting time. A simple linear deterioration function is assumed and some dominating relationships between machines can be satisfied. It is shown that for the problems to minimize makespan or weighted sum of completion time, polynomial algorithms still exist, although these problems are more complicated than the classical ones. When the objective is to minimize maximum lateness or maximum tardiness, the solutions of a classical version may not hold.
Keywords:Scheduling   Flow shop   Simple linear deterioration   Dominating machines
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号