首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Minimizing tardiness on a single processor with sequence-dependent setup times: a simulated annealing approach
Authors:KC Tan  R Narasimhan
Institution:Mesa State College, Grand Junction, CO, USA;Michigan State University, East Lansing, MI, USA
Abstract:In today's fast-paced Just-In-Time and mass customization manufacturing in a sequence-dependent setup environment, the challenge of making production schedules to meet due-date requirements is becoming a more complex problem. Unfortunately, much of the research on operations scheduling problems has either ignored setup times or assumed that setup times on each machine are independent of the job sequence. This paper considers the problem of minimizing tardiness, a common measure of due-date performance, in a sequence-dependent setup environment. Simulated annealing was used to solve the sequencing problem, and its performance was compared with random search. Our experimental results show that the algorithm can find a good solution fairly quickly, and thus can rework schedules frequently to react to variations in the schedule. The algorithm is invaluable for ‘on-line’ production scheduling and ‘last-minute’ changes to production schedule. The results of this research also suggest ways in which more complex and realistic job shop environments, such as multiple machines with a higher number of jobs in the sequence, and other scheduling objectives can be modeled. This research also investigates computational aspects of simulated annealing in solving complex scheduling problems.
Keywords:scheduling  sequence-dependent setup times  simulated annealing  tardiness
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号