Abstract: | Two issues are examined concerning the evaluation of job-shop schedules. First, machine and labor cost/utilization are suggested as alternatives to physical utilization criteria. Secondly, an exploration is made of the use of Kiviat Charts as a means of integrating multidimensional criteria for the overall evaluation of the quality of job shop schedules. |