首页 | 本学科首页   官方微博 | 高级检索  
     


An integrated production and inventory model for a whole manufacturing supply chain involving reverse logistics with finite horizon period
Authors:Jonrinaldi  D.Z. Zhang
Affiliation:1. Exeter Manufacturing Enterprise Centre (XMEC), College of Engineering, Mathematics and Physical Sciences, University of Exeter, Harrison Building, North Park Road, Exeter, EX4 4QF, United Kingdom;2. Department of Industrial Engineering, Andalas University, Kampus Limau Manih, Padang 25163, Indonesia;3. State Key Laboratory on Mechanical Transmission, Chongqing University, Chongqing, PR China
Abstract:This paper proposes a model and solution method for coordinating integrated production and inventory cycles in a whole manufacturing supply chain involving reverse logistics for multiple items with finite horizon period. A whole manufacturing supply chain involving reverse logistic consists of tier-2 suppliers supplying raw materials to tier-1 suppliers, tier-1 suppliers producing parts, a manufacturer which manufactures and assembles parts from tier-1 suppliers into finished products, distributors distributing finished products to retailers, retailers selling products to end customers and a third party which collects the used finished products from end customers, dissembles collected products into parts, and feed the parts back to the supply chain. In this system, we consider a finite horizon period. A mathematical model for representing the behaviors of the system is developed. Solution methods based on decentralized and a combination of decentralized and centralized decision making process, referred to as the semi-centralized decision making process, are proposed to solve the model while the centralized decision making process is solved by a mixed integer nonlinear programming method. A numerical example is used to demonstrate the model and the solutions based on the three types of the coordination.
Keywords:Manufacturing supply chain   Production   Inventory   Integrated   Multiple items   Finite horizon period
本文献已被 ScienceDirect 等数据库收录!
正在获取相似文献,请稍候...
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号