PC矮塔斜拉桥施工过程主梁内力测试与分析 |
| |
引用本文: | 张运波,王东森.PC矮塔斜拉桥施工过程主梁内力测试与分析[J].石家庄铁道学院学报(社会科学版),2011(2):10-14,27. |
| |
作者姓名: | 张运波 王东森 |
| |
作者单位: | 石家庄铁道大学 土木工程学院;石家庄铁道大学 土木工程学院 |
| |
摘 要: | 根据矮塔斜拉桥的受力特点,介绍了梁体关键受力部位测点的布置方案。通过对实测应力值同设计理论值进行的对比分析,研究了该桥施工过程中的主梁受力规律。同时对该桥主梁应力横向分布规律和日照温差对主梁应力的影响规律进行了研究分析。
|
关 键 词: | PC矮塔斜拉桥 内力测试 内力分析 |
收稿时间: | 2011/3/7 0:00:00 |
Test and Analysis of Construction Beam Stress for Wide width PC Extradosed Cable stayed Bridge |
| |
Authors: | Zhang Yunbo and Wang Dongsen |
| |
Institution: | School of Civil Engineering, Shijiazhuang Tiedao University;School of Civil Engineering, Shijiazhuang Tiedao University |
| |
Abstract: | In this dissertation, according to the stress characteristics of cable stayed bridge, the test point arranging scheme for the targeted key section of the beam is introduced. By comparing and researching the measured and theoretical value of beam stress, the rule of beam stress during the whole construction is analyzed. The regularity of transverse beam stress distribution and the influence of temperature changing on the beam stress are also analyzed. |
| |
Keywords: | PC extradosed cable stayed bridge beam stress test beam stress analysis |
|
| 点击此处可从《石家庄铁道学院学报(社会科学版)》浏览原始摘要信息 |
| 点击此处可从《石家庄铁道学院学报(社会科学版)》下载免费的PDF全文 |