首页 | 本学科首页   官方微博 | 高级检索  
     


MANAGING A FLOW LINE WITH SINGLE‐KANBAN,DUAL‐KANBAN OR CONWIP
Authors:KUM KHIONG YANG
Abstract:To control the production of different parts on a single flow line, managers can choose between the Single‐kanban, Dual‐kanban, and Conwip. This paper therefore compares the three different systems. The results show that Conwip consistently produces the shortest mean customer wait time and lowest total work‐in‐process. Our results also contradict the finding of a previous study, which showed that Dual‐kanban performed better than Single‐kanban. The different findings can, however, be attributed to the use of a material transfer policy, which favors the Dual‐kanban modeled in the previous study. Our study shows that transferring replenished containers immediately to downstream stations, increasing the number of cards, and reducing the withdrawal cycle reduce the mean customer wait time significantly.
Keywords:PRODUCTION CONTROL SYSTEMS  SINGLE‐KANBAN  DUAL‐KANBAN  CONWIP  SIMULATION
相似文献(共20条):
[1]、HOUMIN YAN,KE LIU,ARTHUR HSU.OPTIMAL ORDERING IN A DUAL‐SUPPLIER SYSTEM WITH DEMAND FORECAST UPDATES[J].Production and Operations Management,2003,12(1):30-45.
[2]、THOMAS W. SLOAN,J. GEORGE SHANTHIKUMAR.COMBINED PRODUCTION AND MAINTENANCE SCHEDULING FOR A MULTIPLE‐PRODUCT,SINGLE‐ MACHINE PRODUCTION SYSTEM[J].Production and Operations Management,2000,9(4):379-399.
[3]、GREGORY DOBSON,CANDACE ARAI YANO.PRODUCT OFFERING,PRICING, AND MAKE‐TO‐STOCK/MAKE‐TO‐ORDER DECISIONS WITH SHARED CAPACITY[J].Production and Operations Management,2002,11(3):293-312.
[4]、Franz-Josef Krmer,Mohsen El Hafsi,Sherman X. Bai.PRODUCTION FLOW CONTROL FOR A MANUFACTURING SYSTEM WITH FLEXIBLE ROUTINGS[J].Production and Operations Management,1997,6(1):37-56.
[5]、T. C. EDWIN CHENG,CHELLIAH SRISKANDARAJAH,GUOQING WANG.TWO‐ AND THREE‐STAGE FLOWSHOP SCHEDULING WITH NO‐WAIT IN PROCESS[J].Production and Operations Management,2000,9(4):367-378.
[6]、Albert Saiz,Uri Simonsohn.PROXYING FOR UNOBSERVABLE VARIABLES WITH INTERNET DOCUMENT‐FREQUENCY[J].Journal of the European Economic Association,2013,11(1):137-165.
[7]、HORST TEMPELMEIER.A SIMPLE HEURISTIC FOR DYNAMIC ORDER SIZING AND SUPPLIER SELECTION WITH TIME‐VARYING DATA[J].Production and Operations Management,2002,11(4):499-515.
[8]、STEVEN J. ERLEBACHER.OPTIMAL AND HEURISTIC SOLUTIONS FOR THE MULTI‐ITEM NEWSVENDOR PROBLEM WITH A SINGLE CAPACITY CONSTRAINT[J].Production and Operations Management,2000,9(3):303-318.
[9]、HUAN NENG CHIU,HSIN MIN CHEN,LI CHING WENG.DETERMINISTIC TIME‐VARYING DEMAND LOT‐SIZING MODELS WITH LEARNING AND FORGETTING IN SETUPS AND PRODUCTION[J].Production and Operations Management,2003,12(1):120-127.
[10]、PRAKASH MIRCHANDANI,AJAY K. MISHRA.COMPONENT COMMONALITY: MODELS WITH PRODUCT‐SPECIFIC SERVICE CONSTRAINTS*[J].Production and Operations Management,2002,11(2):199-215.
[11]、CHIEN‐YU CHEN,ZHENYING ZHAO,MICHAEL O. BALL.A MODEL FOR BATCH ADVANCED AVAILABLE‐TO‐PROMISE[J].Production and Operations Management,2002,11(4):424-440.
[12]、KWEI TANG,JEN TANG.TIME‐BASED PRICING AND LEADTIME POLICIES FOR A BUILD‐TO‐ORDER MANUFACTURER[J].Production and Operations Management,2002,11(3):374-392.
[13]、MARK GOH,MOOSA SHARAFALI.PRICE‐DEPENDENT INVENTORY MODELS WITH DISCOUNT OFFERS AT RANDOM TIMES*[J].Production and Operations Management,2002,11(2):139-156.
[14]、Risk Conundrums: Solving Unsolvable Problems. Roger Kasperson,editor. New York: Earthscan/Routledge, 2017, 269 pp. + index. ISBN‐978‐1‐138‐95607‐0, paper, $40.00+/‐[J].Risk analysis
[15]、Michael Greenberg.Improving Risk Analysis,Edited by Louis Anthony Cox,Jr. New York,Springer 2013, xxxi +386 pp. ISBN 978‐1‐4614‐6057‐2, $179.00.[J].Risk analysis,2015,35(3):553-554.
[16]、Patrick Lee O\'Halloran.Gender Differences in Formal On‐the‐Job Training: Incidence,Duration, and Intensity[J].LABOUR,2008,22(4):629-659.
[17]、Review of Achieving Regulatory Excellence,Cary Coglianese (Ed.), Brookings Institution Press, 2017, 322 pp. $35.00 ISBN: 978‐0‐8157‐2842‐9[J].Risk analysis
[18]、DW Daniel.The politic,philosophy and practice of OR—A personal view of the issues[J].Omega,1985,13(2):89-94.
[19]、Eric Maskin.JEAN‐JACQUES LAFFONT: A LOOK BACK[J].Journal of the European Economic Association,2004,2(5):913-923.
[20]、Cliff Bowman,Nardine Collier.A contingency approach to resource‐creation processes[J].国际管理评论杂志,2006,8(4):191-211.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号