相似文献(共20条): | [1]、 | HOUMIN YAN,KE LIU,ARTHUR HSU.OPTIMAL ORDERING IN A DUAL‐SUPPLIER SYSTEM WITH DEMAND FORECAST UPDATES[J].Production and Operations Management,2003,12(1):30-45. | [2]、 | THOMAS W. SLOAN,J. GEORGE SHANTHIKUMAR.COMBINED PRODUCTION AND MAINTENANCE SCHEDULING FOR A MULTIPLE‐PRODUCT,SINGLE‐ MACHINE PRODUCTION SYSTEM[J].Production and Operations Management,2000,9(4):379-399. | [3]、 | GREGORY DOBSON,CANDACE ARAI YANO.PRODUCT OFFERING,PRICING, AND MAKE‐TO‐STOCK/MAKE‐TO‐ORDER DECISIONS WITH SHARED CAPACITY[J].Production and Operations Management,2002,11(3):293-312. | [4]、 | Franz-Josef Krmer,Mohsen El Hafsi,Sherman X. Bai.PRODUCTION FLOW CONTROL FOR A MANUFACTURING SYSTEM WITH FLEXIBLE ROUTINGS[J].Production and Operations Management,1997,6(1):37-56. | [5]、 | T. C. EDWIN CHENG,CHELLIAH SRISKANDARAJAH,GUOQING WANG.TWO‐ AND THREE‐STAGE FLOWSHOP SCHEDULING WITH NO‐WAIT IN PROCESS[J].Production and Operations Management,2000,9(4):367-378. | [6]、 | Albert Saiz,Uri Simonsohn.PROXYING FOR UNOBSERVABLE VARIABLES WITH INTERNET DOCUMENT‐FREQUENCY[J].Journal of the European Economic Association,2013,11(1):137-165. | [7]、 | HORST TEMPELMEIER.A SIMPLE HEURISTIC FOR DYNAMIC ORDER SIZING AND SUPPLIER SELECTION WITH TIME‐VARYING DATA[J].Production and Operations Management,2002,11(4):499-515. | [8]、 | STEVEN J. ERLEBACHER.OPTIMAL AND HEURISTIC SOLUTIONS FOR THE MULTI‐ITEM NEWSVENDOR PROBLEM WITH A SINGLE CAPACITY CONSTRAINT[J].Production and Operations Management,2000,9(3):303-318. | [9]、 | HUAN NENG CHIU,HSIN MIN CHEN,LI CHING WENG.DETERMINISTIC TIME‐VARYING DEMAND LOT‐SIZING MODELS WITH LEARNING AND FORGETTING IN SETUPS AND PRODUCTION[J].Production and Operations Management,2003,12(1):120-127. | [10]、 | PRAKASH MIRCHANDANI,AJAY K. MISHRA.COMPONENT COMMONALITY: MODELS WITH PRODUCT‐SPECIFIC SERVICE CONSTRAINTS*[J].Production and Operations Management,2002,11(2):199-215. | [11]、 | CHIEN‐YU CHEN,ZHENYING ZHAO,MICHAEL O. BALL.A MODEL FOR BATCH ADVANCED AVAILABLE‐TO‐PROMISE[J].Production and Operations Management,2002,11(4):424-440. | [12]、 | KWEI TANG,JEN TANG.TIME‐BASED PRICING AND LEADTIME POLICIES FOR A BUILD‐TO‐ORDER MANUFACTURER[J].Production and Operations Management,2002,11(3):374-392. | [13]、 | MARK GOH,MOOSA SHARAFALI.PRICE‐DEPENDENT INVENTORY MODELS WITH DISCOUNT OFFERS AT RANDOM TIMES*[J].Production and Operations Management,2002,11(2):139-156. | [14]、 | Risk Conundrums: Solving Unsolvable Problems. Roger Kasperson,editor. New York: Earthscan/Routledge, 2017, 269 pp. + index. ISBN‐978‐1‐138‐95607‐0, paper, $40.00+/‐[J].Risk analysis | [15]、 | Michael Greenberg.Improving Risk Analysis,Edited by Louis Anthony Cox,Jr. New York,Springer 2013, xxxi +386 pp. ISBN 978‐1‐4614‐6057‐2, $179.00.[J].Risk analysis,2015,35(3):553-554. | [16]、 | Patrick Lee O\'Halloran.Gender Differences in Formal On‐the‐Job Training: Incidence,Duration, and Intensity[J].LABOUR,2008,22(4):629-659. | [17]、 | Review of Achieving Regulatory Excellence,Cary Coglianese (Ed.), Brookings Institution Press, 2017, 322 pp. $35.00 ISBN: 978‐0‐8157‐2842‐9[J].Risk analysis | [18]、 | DW Daniel.The politic,philosophy and practice of OR—A personal view of the issues[J].Omega,1985,13(2):89-94. | [19]、 | Eric Maskin.JEAN‐JACQUES LAFFONT: A LOOK BACK[J].Journal of the European Economic Association,2004,2(5):913-923. | [20]、 | Cliff Bowman,Nardine Collier.A contingency approach to resource‐creation processes[J].国际管理评论杂志,2006,8(4):191-211. |
|