首页 | 本学科首页   官方微博 | 高级检索  
     检索      

地震灾后重建绩效测量——以汶川、玉树、芦山地震为例
引用本文:陈升,唐元杰.地震灾后重建绩效测量——以汶川、玉树、芦山地震为例[J].重庆大学学报(社会科学版),2018,24(6):22-32.
作者姓名:陈升  唐元杰
作者单位:重庆大学 公共管理学院, 重庆 400044;清华大学 公共管理学院, 北京 100084,重庆大学 公共管理学院, 重庆 400044
基金项目:国家自然科学基金项目"高效减灾与重建:灾害冲击与灾后重建绩效的影响因素及其作用机制研究——基于灾害周期的视角"(71473022);国家社会科学基金重点项目"我国中长期规划决策机制及方法论研究"(15AZD016);中央高校基本科研业务费(CDJKXB13003)
摘    要:灾后重建是保障地震灾区群众重归正常生产生活的重要工作,那么如何测量灾后重建绩效,哪些因素会影响灾后重建绩效?文章回顾了灾后重建绩效相关研究文献,在此基础上认为效果和效率是灾后重建绩效的两大方面,以"消除灾害影响并恢复到灾前水平所用的时间"作为衡量灾后重建绩效的标准,能够反映灾后重建的效果和效率,具有可行性。以此为基础建立了灾后重建绩效的分析框架和测量方法,并选择汶川地震、玉树地震和芦山地震作为案例,对三次地震灾区的重建绩效进行了对比分析并简要分析了绩效差异原因。结果表明,三次地震灾后重建基本如期完成了灾后重建目标任务,但因存在灾害程度不同、对口支援质量不同等原因,三次地震灾后重建绩效存在一定差异。

关 键 词:地震灾害  灾后重建  灾后恢复  灾后重建绩效
修稿时间:2018/6/19 0:00:00

Performance measurement of post disaster reconstruction: Taking Wenchuan, Yushu, Lushan Earthquake as examples
CHEN Sheng and TANG Yuanjie.Performance measurement of post disaster reconstruction: Taking Wenchuan, Yushu, Lushan Earthquake as examples[J].Journal of Chongqing University(Social Sciences Edition),2018,24(6):22-32.
Authors:CHEN Sheng and TANG Yuanjie
Institution:School of Public Affairs, Chongqing University, Chongqing 400044, P. R. China;School of Public Policy & Management, Tsinghua University, Beijing 100084, P. R. China and School of Public Affairs, Chongqing University, Chongqing 400044, P. R. China
Abstract:Post disaster reconstruction is an important job to ensure the return to normal production and life of the people in the earthquake stricken areas. So, how to measure the performance of post disaster reconstruction? Which factors will affect the performance of post disaster reconstruction? This paper reviews the related literature on performance of post disaster reconstruction. On this basis, this paper argues that the effect and efficiency are two major aspects of the performance of post disaster reconstruction. So, using the time spent in eliminating the impact of disasters and returning to the pre disaster level as standard of measuring the reconstruction performance can reflect the reconstruction effect and efficiency. It has feasibility. Based on this, this paper establishes an analytical framework and measurement method for post disaster reconstruction performance. Taking the Wenchuan earthquake, the Yushu earthquake and the Lushan earthquake as the cases, the paper compares and analyzes the reconstruction performance of the three earthquake stricken areas, and briefly analyzes the reasons for the performance differences. The results show that the three earthquake reconstruction basically completed the goal of post disaster reconstruction on schedule, but because of the different degree of disaster, different quality of reconstruction after disaster, there are some differences in the performance of the three post-earthquake reconstruction.
Keywords:earthquake disaster  post-disaster reconstruction  post-disaster recovery  post-disaster reconstruction performance
点击此处可从《重庆大学学报(社会科学版)》浏览原始摘要信息
点击此处可从《重庆大学学报(社会科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号