首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
《决策科学》2017,48(2):207-247
Advice seeking is often the most critical success factor in today's IT project teams. To understand how advice seekers are motivated, we integrate the antecedents of advice seeking—as defined by network theory (Granovetter, 1983)—into a cost/benefit model based on expectancy theory (Vroom, 1964). To contribute to the research on advice network formation, we integrate the role of task uncertainty—one of the defining characteristics of IT projects—into that research (Wallace & Keil, 2004). Based on a controlled quasi‐experiment, this study demonstrates that when task uncertainty is low, individuals with attractive personalities and similar demographics will be sought out for advice more frequently, regardless of their knowledge and resources (i.e., the benefits to the advice seekers). However, when task uncertainty is high, individuals with greater knowledge and access to resources are sought out more often in an advice network. These results provide clarity to prior research that has found mixed results concerning the effectiveness of the traditional antecedents to advice seeking (e.g., knowledge, power, and transactive memory) (e.g., Xu, Kim, & Kankanhalli, 2010a). In addition, project managers may choose to alter their team structure in order to optimize the advice network based on the anticipated level of IT project risk or task uncertainty.  相似文献   

2.
The rising trend of projects with high‐skilled and autonomous contributors increasingly exposes managers to the risk of idiosyncratic individual behaviors. In this article, we examine the effects of an important behavioral factor, an individual's cost salience. Cost salience leads individuals to perceive the cost of immediate effort to be larger than the cost of future effort. This leads to procrastination in early stages and back‐loaded effort over the course of the project. We model the problem confronting the manager of a project whose quality is adversely impacted by such distortion of individual effort over time. Complementary to prior works focused on the planning and scheduling tasks of project management in the absence of human behavior, we find that managers should reward contributions made in earlier stages of a project. Our analysis also yields interesting insights on the project team performance: teams with diverse levels of cost salience will perform better than homogeneous teams. We also address another important facet of team composition, namely, the choice between stable and fluid teams, and find that the practice of creating fluid teams might have previously unrecognized benefits when behavioral aspects of projects are considered. We conclude with insights and organizational implications for project managers.  相似文献   

3.
We examine the role of flexibility in project team effectiveness. Specifically, we hypothesize that (1) it will mediate the relationship between staffing quality and effectiveness and (2) its relationship with team effectiveness will be moderated by project complexity, where more flexibility will be required when projects are complex. Hypotheses are tested using data collected from 60 cross-functional project teams. The results indicated that flexibility mediates the relationship between staffing quality and team performance (goal achievement and cohesion, but not project efficiency). Additionally, we find that two-dimensions of project complexity moderate the flexibility–performance relationship. Specifically, the more alternatives a team must consider, the stronger the negative relationship between flexibility and project efficiency is. The flexibility–cohesion relationship also was moderated, such that the relationship is more positive when the project is more ambiguous and more negative when the project team faces many alternatives. Implications for research and practice are discussed.  相似文献   

4.
High technology organizations need to develop new products or processes that address the dual goals of exploration and exploitation. The competing viewpoints and the asymmetric nature of market returns associated with these goals in R&D projects can heighten stress levels among project team members and reduce their psychological safety. While current research calls for greater focus on task design for improving psychological safety, we know little about how team contextual factors affect this relationship. This study develops and tests a conceptual framework that examines the moderating role of R&D team contextual factors, namely, relative exploration and project‐organization metric alignment on the relationship between a key task design variable, namely, team autonomy, and psychological safety. Relative exploration captures the extent to which exploration goals are emphasized over exploitation goals in an R&D project, while project‐organization metric alignment measures the extent to which project metrics are aligned with broader organizational metrics. Furthermore, we examine the performance consequences of psychological safety in R&D projects. The empirical analysis is conducted using primary data collected from multiple informants across 110 R&D projects in 34 high technology business units. Our results indicate that relative exploration and project‐organization metric alignment have contrasting moderating effects. Furthermore, the effect of psychological safety on project performance is found to be indirect and mediated through team turnover. Implications of the study findings, limitations, and directions for future research are discussed.  相似文献   

5.
Using surveys and interview data this research examines teams’ engagement in creative processes. Results of cluster analysis indicated that the more creative teams were those that perceived that their tasks required high levels of creativity, were working on jobs with high task interdependence, were high on shared goals, valued participative problem-solving, and had a climate supportive of creativity. In addition, members of the more creative teams spent more time socializing with each other and had moderate amounts of organizational tenure. Implications for management are discussed.  相似文献   

6.
The impact of information technology (IT) on the performance of distributed projects is not well understood. Although prior research has documented that dispersion among project teams has an adverse effect on project performance, the role of IT as an enabler of communication to bridge the spatial distance among team members in distributed networks has not been empirically studied. We focus on the role of IT as a moderator of the relationship between team dispersion and project performance using projects as the unit of analysis. We find that IT mitigates the negative effect of team dispersion on project performance, especially in high information volume projects. Our central contribution is the development of an empirically tested model to improve the understanding of the operational impact of IT as a vehicle to bridge spatial dispersion among distributed teams that are engaged in knowledge‐intensive work.  相似文献   

7.
We extend the knowledge‐based view by providing an explanation of how firms develop the capability to create knowledge. We take the view that firms are distributed knowledge systems composed of individuals who embody knowledge, and theoretically identify and empirically test the existence and effectiveness of two strategies – organization and project team – that promote their interactions to develop this capability. On the one hand, building on what we call the organization‐level innovation literature, we identify the organization strategy, which suggests investment in organization‐level integrative management practices to facilitate interactions to create knowledge among individuals situated in different parts of the system, independently of when a knowledge‐creation task is established and individuals are organized to create knowledge. On the other hand, building on what we call the team‐level innovation literature, we identify the project team strategy, which suggests investment in project team‐level integrative management practices to facilitate interactions to create knowledge among individuals once a knowledge‐creation task is defined and individuals are placed into teams to create knowledge. The two strategies are substitute approaches for the development of the capability, although the organization strategy appears to better predict outcomes of the capability. However, this approach might be more costly, so not all managers will choose to follow it.  相似文献   

8.
Research using empirical methods has established a curvilinear relationship between team communication and performance. We conduct virtual experiments to examine team communication and performance when teams work under varying types and levels of project complexity. Data samples, generated using Monte Carlo simulation, are based on the statistical characteristics of empirical data collected from 60 cross-functional project teams that communicated over multiple media (email, phone, and face-to-face) and were completing projects of varying complexity. Regression analysis indicates that project complexity influences the communication-performance relationship. Optimization shows that the communication frequencies at which teams maximize or minimize their performance are dependent upon media used.  相似文献   

9.
The construction of a software system requires not only individual coding effort from team members to realize the various functionalities, but also adequate team coordination to integrate the developed code into a consistent, efficient, and bug‐free system. On the one hand, continuous coding without adequate coordination can cause serious system inconsistencies and faults that may subsequently require significant corrective effort. On the other hand, frequent integrations can be disruptive to the team and delay development progress. This tradeoff motivates the need for a good coordination policy. Both the complexity and the importance of coordination is accentuated in distributed software development (DSD), where a software project is developed by multiple, geographically‐distributed sub‐teams. The need for coordination in DSD exists both within one sub‐team and across different sub‐teams. The latter type of coordination involves communication across spatial boundaries (different locations) and possibly temporal boundaries (different time zones), and is a major challenge that DSD faces. In this study, we model both inter‐ and intra‐sub‐team coordination in DSD based on the characteristics of the systems being developed by the sub‐teams, the deadline for completion, and the nature of division adopted by the sub‐teams with respect to development and integration activities. Our analysis of optimal coordination policies in DSD shows that integration activities by one sub‐team not only benefit that sub‐team (as is the case in co‐located development) but can also help the other sub‐teams by providing greater visibility, thereby resulting in a higher integration frequency relative to co‐located development. Analytical results are presented to demonstrate how the characteristics of the projects and the sub‐teams, and the efficiency of communication across the sub‐teams, affect coordination and productivity. We also investigate the pros and cons of using specialized integration sub‐teams and find that their advantage decreases as the project schedule becomes tighter. Decentralized decisions and asymmetric subsystems are also discussed.  相似文献   

10.
We propose that theories of project team development and of creativity can be integrated into a new conceptual framework. The framework proposes two structural barriers that bear on team performance, and modifies the well-established team development model of Tuckman. Creative leadership is suggested as an important means of breaching the barriers. Its differentiating feature seems to be its effectiveness in establishing protocols that sustain the creative efforts of team members. We have designated the protocols 'benign structures'. Empirical evidence is provided from a range of studies of project teams in industrial settings.  相似文献   

11.
This article focuses on conditions that make cross-functional cooperation in new product development projects more or less productive. We investigate 40 NPD projects in the consumer electronics and pharmaceuticals industries in which R&D and marketing played key roles. We find that the contributions of cross-functional cooperation to NPD success are contingent on the type of market and technology opportunities being pursued. More specifically, our results suggest that when a project team pursues an opportunity characterized by high levels of technological and market risks, investments in high levels of cross-functional cooperation are warranted to increase NPD success. We do not find evidence that cross-functional cooperation moderates the relationship between the openness of an NPD project towards external information and knowledge and its performance. This suggests that less integrated project teams could achieve similar results as more integrated teams in terms of processing large quantities of information and knowledge without incurring the costs that may stem from high levels of cross-functional cooperation.  相似文献   

12.
In light of the workforce's increasing nationality diversity, our study explores the antecedents for the successful management of nationality diversity as visualized in a favourable diversity climate and enhanced team performance. We propose a double‐contingency model in which we argue that the effects of nationality diversity will be dependent upon task interdependence and leaders’ cultural intelligence. We propose that nationality diversity will be more consequential in more interdependent teams, in which team interactions and processes are more salient. Moreover, team leaders with higher cultural intelligence will possess the skills to foster adequate team processes and thereby enhance diversity climate and performance of nationally diverse, more interdependent teams. We collected multi‐source data from 63 work teams (N = 410) and their supervisors at a German facility management company. Moderated regression analyses supported the hypothesized three‐way interaction between nationality diversity, task interdependence and leaders’ cultural intelligence. Additional simple slope analysis showed that nationality diversity is positively related to diversity climate and performance only when both team leaders’ cultural intelligence and task interdependence are high. Our study not only provides recommendations for successful nationality diversity management but also yields theoretical implications for diversity and cultural intelligence research.  相似文献   

13.
In the fast moving software industry, projects have been increasingly developed by distributed teams, which are located in geographically remote offices and collaborate using information communication technologies. In such environments, project distribution presents specific challenges, as work in distributed teams increases project technical complexity, communication lines multiply and stakeholders’ interests may be divergent. Despite the importance and complexity of this type of problem, it seems that there is a lack of reports, in the literature, of systems that could support these decisions. This paper presents a real-world case study, where we developed a multi-criteria model for supporting the distributed team work allocation decision for a major global software company. It was developed with a group of software development project managers, using decision conferencing and multi-attribute value analysis. The model deals not only with software engineering attributes, but also “soft” and strategic issues, like team satisfaction and training opportunities. We also discuss some issues and challenges faced during this modelling process.  相似文献   

14.
常涛  李雅馨  刘智强 《管理学报》2022,19(1):46-55,84
基于互动过程视角,构建地位冲突不对称对团队创造力的倒U形影响模型,并通过103个团队484份有效调查问卷进行实证检验。研究结果表明:地位冲突不对称对团队创造力呈现“过犹不及”的倒U形曲线效应,并且任务复杂性和任务互依性显著调节了上述关系,其中,当任务复杂性越高时,主效应倒U形曲线的拐点处于团队中拥有更多高地位冲突感知成员的结构下,且拐点位置更高;当任务互依性越高时,主效应倒U形曲线的拐点处于团队中拥有更少高地位冲突感知成员的结构下,且拐点位置更高。  相似文献   

15.
信任与建设性争辩对科研团队创造力影响的实证研究   总被引:3,自引:0,他引:3  
如何提高科研团队创造力是科研管理的一个重要课题。本文目的在于探寻科研团队内信任与建设性争辩的相互作用机制及其对团队创造力的影响,在回顾国内外相关研究文献的基础上,利用问卷调查,对中国科学院6所科研院所的163名科研团队成员进行施测。研究结果显示:在科研团队内,信任与建设性争辩和团队创造力都呈正相关关系;建设性争辩与团队创造力呈正相关关系;信任通过建设性争辩的中介作用来促进团队创造力。本文的研究结论对科研管理具有一定的理论和实践指导意义。  相似文献   

16.
We examine the drivers of project performance and customer satisfaction in outsourced software projects using a proprietary panel dataset. The data cover 822 customer observations related to 182 unique projects executed by an India‐based software services vendor. Adopting a multidisciplinary perspective, we investigate how project planning, team stability, and communication effectiveness impact project performance and customer satisfaction. We delineate the direct and interactive influences of the antecedent variables. We also examine how these influences are moderated by two important project contexts: (a) the nature of software work (maintenance and development vs. testing projects) and (b) project maturity (new vs. mature projects). Among other results, we demonstrate that, when project planning capabilities are high, the positive impact of team stability and communication effectiveness on project performance is even higher. In addition, our results suggest that the impact of communication on project performance is muted when team stability is high. Finally, we also demonstrate that the impact of the antecedent variables on project performance varies with the nature of software work. Our findings offer specific and actionable insights to managers that can help them manage outsourced projects better, and open up new research perspectives in the context of outsourced project management.  相似文献   

17.
Integrating evolutionary signaling theory with a social attention approach, we argue that individuals possess a fast, automated mechanism for detecting leadership signals in fellow humans that is reflected in higher visual attention toward emergent leaders compared to non-leaders. To test this notion, we first videotaped meetings of project teams and collected leadership ratings for the team members from three rating sources. Second, we provided 18 naïve observers with 42 brief, muted video clips of the team meetings and analyzed their eye gazing patterns. Observers gazed at emergent leaders more often, and for an average longer duration, than at non-leaders. Gender effects occurred such that male emergent leaders received a higher number of fixations than female emergent leaders. Non-verbal behavior analysis indicated that emergent leaders showed a higher amount of active gestures and less passive facial expressions than non-leaders. We discuss theoretical and methodological directions for emergent leadership research in teams.  相似文献   

18.
本文从学术团队核心能力建设的动态角度,利用广东省高校学术团队的数据,从产学研合作的广度和深度两个维度,研究探讨了产学研合作对学术团队核心能力影响的作用机理,深入剖析了学术团队的研究偏好、成员的互补性等团队特征的差异性特征对该影响作用的调节效应。研究结果表明,产学研合作对学术团队的建设具有积极的影响,产学研合作会对学术团队建设的正式化和学习能力产生正向的影响,而产学研合作的深度较广度相比,会对学术团队的学习能力影响更为突出。当进一步考虑到学术团队特征的异质性时,产学研合作对学术团队建设的影响效应也将随学术团队特征的异质性而体现出内在的差异性。其中,学术团队的研究偏好与产学研合作项目越匹配,产学研合作将有助于提升团队的学习能力。而学术团队人员的互补性越强,产学研合作广度的增加将有利于形成团队的互动与逐渐正式化,随着团队产学研合作深度的增加,其对学术团队文化氛围的影响也就越有利。  相似文献   

19.
《Long Range Planning》2022,55(2):102091
A central idea in organizational research and practice is that change efforts demand a sense of urgency. It is also commonly accepted that renewal beyond incremental improvements demand individuals and teams to have what earlier research has called a “promotion focus”—to think innovatively, see opportunities, and think long term. Urgency, however, leads to a “prevention focus,” with which teams and their members are more inclined to seek incremental improvements and error reduction. Hence, urgency seems to both support change and prevent it. Earlier research has not established the conditions under which urgency may lead to creative and productive outcomes. This paper aims to do so. In a study of seven change initiatives at a large media company undergoing a serious crisis, we found that urgency cues could be productively handled by managers and project team members when they addressed three core relationships: (a) the success-failure relationship, (b) the safety-accountability relationship, and (c) the operative-strategic relationship. We make three related theoretical propositions regarding the role of urgency in innovation-driven change and transformation.  相似文献   

20.
知识型团队是现代组织执行复杂创新任务的重要组织形式.本文从分析知识型团队与知识工作任务的匹配关系入手,在引入知识链及知识链网络等概念的基础上,探讨了基于知识链的知识型团队的动态能力构建机制,分析了围绕知识链网络的知识团队结构体系模型及创新运作机理.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号