首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Faced with demand uncertainty across multiple product lines, many companies have recourse to flexible capacities which can process different products in order to better balance the trade‐off between capacity utilization and cost efficiency. Many studies demonstrated the potential benefit of using flexible capacity at the aggregate level by treating a whole plant or a whole process as a single stage. This paper extends these analyses by studying the benefits of flexible capacity while considering the multi‐stage structure of processes and consequently determining which stages should be flexible, which should be dedicated, and how much capacity to assign to each stage. We consider a two‐product firm which operates in a process‐to‐order environment and faces uncertain demand. Each stage of the process can be designed as dedicated or flexible. Dedicated resources are highly cost efficient but limited to the single product they are exclusively designed for, whereas flexible resources are versatile to handle several products but are more expensive. Using a general mathematical formulation our analysis shows that the optimal design may have some dedicated and some flexible stages along the process. Interestingly, this decision should be decoupled from the chronological order of the stages along the process.  相似文献   

2.
This paper investigates the performance impact of lot‐sizing rule (LSR) selection and freezing of the master production schedule (MPS) in multi‐item single‐level systems with a single resource constraint under deterministic demand. The results of the study show that the selection of LSRS and the parameters for freezing the MPS have a significant impact on total cost, schedule instability, and the service level of the system. However, the selection of LSRS does not significantly influence the selection of the MPS freezing parameters. The basic conclusions concerning the performance of the freezing parameters under a capacity constraint agreed with previous research findings without consideration of capacity constraints.  相似文献   

3.
We study a multi‐product firm with limited capacity where the products are vertically (quality) differentiated and the customer base is heterogeneous in their valuation of quality. While the demand structure creates opportunities through proliferation, the firm should avoid cannibalization between its own products. Moreover, the oligopolistic market structure puts competitive pressure and limits the firm's market share. On the other hand, the firm has limited resources that cause a supply‐side fight for adequate and profitable production. We explicitly characterize the conditions where each force dominates. Our focus is on understanding how capacity constraints and competition affect a firm's product‐mix decisions. We find that considering capacity constraints could significantly change traditional insights (that ignore capacity) related to product‐line design and the role of competition therein. In particular, we show that when the resources are limited, the firm should offer only the product that has the highest margin per unit capacity. We find that this product could be the diametrically opposite product suggested by the existing literature. In addition, we show that for intermediate capacity levels, whereas the margin per unit capacity effect dominates in a less competitive market, proliferation and cannibalization effects dominate in a more competitive market.  相似文献   

4.
Since Eli Goldratt first appeared on the scene in the late 1970s, his ideas concerning production management have generated a huge amount of interest, controversy, and misunderstanding. These ideas have been proliferated under several names such as optimized production technology (OPT), drum-buffer-rope (DBR), synchronized manufacturing (SM), and theory of constraints (TOC). Although there seems to be general agreement on the importance of how capacity-constrained resources are scheduled, research aimed at advancing the state of the art for the specific problem addressed by DBR continues to be limited by prior misunderstandings and the lack of a rigorous examination by the academic community. This paper seeks “to advance the state of research on constraint scheduling in several ways. First, it presents a concise history of the evolution of DBR. It then explains the use of rods in constraint scheduling. Next, it presents in detail the solution algorithm incorporated by the Goldratt Institute in their production software and, finally, relates that algorithm to alternative methods. In the process of these activities, several lingering misconceptions are resolved.  相似文献   

5.
Purpose: This paper investigates the selection, design and implementation of a Drum-Buffer-Rope (DBR) type of production pull-system in a panel fabrication plant characterised by extensive shared, batch resource resources within a low volume UK manufacturer of large vehicles. This was the second of a series of two related research projects conducted under the aegis of a Lean initiative at this case firm.

Design/methodology/approach: A purposively selected longitudinal case study conducted over 24?months and organised around a two phase research design. The initial body of evidence included a detailed map constructed by a project team of eight managers and accountants during a two day structured workshop; numerous unstructured interviews and observation of shop floor practices; document and archival analysis, and 140 photographs of the focal operation. Supplemented by extensive financial and operational data extracted from the firm’s accounting and MRP systems, including all data necessary to construct and implement bespoke capacity planning, work in progress (WIP) monitoring and simulation modelling tools. The case firm is anonymised.

Findings: The Lean manufacturing literature ignores the real-world issue of shared resources, and this gap is attributable to the concept of ‘rightsizing’ tools and equipment that is widely promoted within the Lean community. The case panel plant is characterised by extensive shared resources; many of which are also batch processes. The most appropriate pull-system method for this production environment is DBR. The detailed design of the DBR mechanism required a controlled transfer buffer of overhead conveyance capacity after the Drum because the extent of downstream process variability risked it being unable to offload panels, hence compromising throughput.

Research limitations/implications: The study is based upon a single case. This consequently has implications for the ability to generalise from the results.

Practical Implications: When the DBR pull-system design was implemented it reduced the number of panels in WIP by 60%. This equated to a 56% (18?days worth) reduction of manufacturing lead time and more than doubled the plant’s inventory turns (from 9.1 to 21.2). It also significantly improved delivery schedule adherence, with downstream jig stoppages in the Final Assembly falling from an average of six to less than one per week. The financial benefit was independently audited to equate to an annualised value of $850?K. Consequently, this project was awarded the first prize at its parent enterprise’s annual worldwide process improvement competition.

Originality/value: This paper details a novel technique that permits the routings of multiple value streams to be mapped and is useful for highlighting the identity and location of shared resources. It also contributes significantly to the literature that is available on the relationship between the Lean paradigm and the management of shared production resources, and adds to the literature on the detailed design and implementation of a DBR pull-system in a jobbing-type of environment.  相似文献   

6.
In consulting, finance, and other service industries, customers represent a revenue stream, and must be acquired and retained over time. In this paper, we study the resource allocation problem of a profit maximizing service firm that dynamically allocates its resources toward acquiring new clients and retaining unsatisfied existing ones. The interaction between acquisition and retention in our model is reflected in the cash constraint on total expected spending on acquisition and retention in each period. We formulate this problem as a dynamic program in which the firm makes decisions in both acquisition and retention after observing the current size of its customer base and receiving information about customers in danger of attrition, and we characterize the structure of the optimal acquisition and retention strategy. We show that when the firm's customer base size is relatively low, the firm should spend heavily on acquisition and try to retain every unhappy customer. However, as its customer base grows, the firm should gradually shift its emphasis from acquisition to retention, and it should also aim to strike a balance between acquisition and retention while spending its available resources. Finally, when the customer base is large enough, it may be optimal for the firm to begin spending less in both acquisition and retention. We also extend our analysis to situations where acquisition or retention success rate, as a function of resources allocation, is uncertain and show that the optimal acquisition and retention policy can be surprisingly complex. However, we develop an effective heuristic for that case. This paper aims to provide service managers some analytical principles and effective guidelines on resource allocation between these two significant activities based on their firm's customer base size.  相似文献   

7.
The available‐to‐promise (atp) function is becoming increasingly important in supply chain management since it directly links production resources with customer orders. In this paper, a mixed integer programming (mip) ATP model is presented. This model can provide an order‐promising and ‐fulfillment solution for a batch of orders that arrive within a predefined batching interval. A variety of constraints, such as raw material availability, production capacity, material compatibility, and customer preferences, are considered. Simulation experiments using the model investigate the sensitivity of supply chain performance to changes in certain parameters, such as batching interval size and customer order flexibility.  相似文献   

8.
Managers seeking to improve lead‐time performance are challenged by how to balance resources and investments between process improvement achieved through lean/just‐in‐time (JIT) practices and information technology (IT) deployment. However, extant literature provides little guidance on this question. Motivated by both practical importance and lack of academic research, this article examines empirically the relationships among interfirm IT integration, intrafirm IT integration, lean/JIT practices, and lead‐time performance using data from IndustryWeek's Census of Manufacturers ( IndustryWeek, 2006 ). The results provide several new insights on the relationship between IT integration and lean/JIT practices. First, the study confirms that implementing lean/JIT practices significantly reduces lead time. Second, lean/JIT practices mediate the influence of IT integration on lead‐time performance. This suggests that process improvements that result from lean/JIT practices are important contributors to the success of IT integration. Even companies that have experienced success in reducing lead time through lean/JIT practices may benefit from IT integration practices such as those embodied in enterprise resource planning systems. The findings provide managers with empirical evidence and a theoretical framework on the balance between lean/JIT and IT for effecting improvement in lead‐time performance, thus offering practical guidance on this important question. Future research is needed to extend the lean/JIT practices in this study to supply chain practices and explore the relationship between supply chain practices and IT integration.  相似文献   

9.
We show simple yet optimal results to update the inventory/capacity levels, expected profit, fill rates, and service levels of substitutable resources in response to an updating of the mean demand forecasts for the resources. We find that a change in the mean demand of one resource does not affect the optimal inventory level of any other resource. The results are obtained for demands with location‐scale distribution, and for a revenue structure satisfying a triangle property such that the manager will always use the inventory of a resource to meet her own demand first before using it for substitution. The results for updating the performance measures also extend to managers who maintain non‐optimal inventory/capacity levels. Implications for procurement, sales and operational planning, and multi‐store operations are discussed.  相似文献   

10.
11.
The contract manufacturing industry has grown rapidly in recent years as firms have increasingly outsourced production to reduce costs. This growth has created powerful contract manufacturers (CMs) in several industries. Achieving a competitive cost position is often a primary motive for outsourcing. Outsourcing influences both the original equipment manufacturer's (OEM) and the CM's production levels, and, therefore, through learning‐by‐doing renders future costs dependent on past outsourcing decisions. As such, outsourcing should not be viewed as a static decision that, once made, is not revisited. We address these considerations by analyzing a two‐period game between an OEM and a powerful CM wherein both firms can reduce their production costs through learning‐by‐doing. We find that partial outsourcing, wherein the OEM simultaneously outsources and produces in‐house, can be an optimal strategy. Also, we find that the OEM's outsourcing strategy may be dynamic—i.e., change from period to period. In addition, we find both that the OEM may engage in production for leverage (i.e., produce internally when at a cost disadvantage) and that the CM may engage in low balling. These and other findings in this paper demonstrate the importance of considering learning, the power of the CM, and future periods when making outsourcing decisions.  相似文献   

12.
We consider a manufacturer without any frozen periods in production schedules so that it can dynamically update the schedules as the demand forecast evolves over time until the realization of actual demand. The manufacturer has a fixed production capacity in each production period, which impacts the time to start production as well as the production schedules. We develop a dynamic optimization model to analyze the optimal production schedules under capacity constraint and demand‐forecast updating. To model the evolution of demand forecasts, we use both additive and multiplicative versions of the martingale model of forecast evolution. We first derive expressions for the optimal base stock levels for a single‐product model. We find that manufacturers located near their market bases can realize most of their potential profits (i.e., profit made when the capacity is unlimited) by building a very limited amount of capacity. For moderate demand uncertainty, we also show that it is almost impossible for manufacturers to compensate for the increase in supply–demand mismatches resulting from long delivery lead times by increasing capacity, making lead‐time reduction a better alternative than capacity expansion. We then extend the model to a multi‐product case and derive expressions for the optimal production quantities for each product given a shared capacity constraint. Using a two‐product model, we show that the manufacturer should utilize its capacity more in earlier periods when the demand for both products is more positively correlated.  相似文献   

13.
The well‐known deterministic resource‐constrained project scheduling problem involves the determination of a predictive schedule (baseline schedule or pre‐schedule) of the project activities that satisfies the finish–start precedence relations and the renewable resource constraints under the objective of minimizing the project duration. This baseline schedule serves as a baseline for the execution of the project. During execution, however, the project can be subject to several types of disruptions that may disturb the baseline schedule. Management must then rely on a reactive scheduling procedure for revising or reoptimizing the baseline schedule. The objective of our research is to develop procedures for allocating resources to the activities of a given baseline schedule in order to maximize its stability in the presence of activity duration variability. We propose three integer programming–based heuristics and one constructive procedure for resource allocation. We derive lower bounds for schedule stability and report on computational results obtained on a set of benchmark problems.  相似文献   

14.
Call centers are an increasingly important part of today's business world, employing millions of agents across the globe and serving as a primary customer‐facing channel for firms in many different industries. Call centers have been a fertile area for operations management researchers in several domains, including forecasting, capacity planning, queueing, and personnel scheduling. In addition, as telecommunications and information technology have advanced over the past several years, the operational challenges faced by call center managers have become more complicated. Issues associated with human resources management, sales, and marketing have also become increasingly relevant to call center operations and associated academic research. In this paper, we provide a survey of the recent literature on call center operations management. Along with traditional research areas, we pay special attention to new management challenges that have been caused by emerging technologies, to behavioral issues associated with both call center agents and customers, and to the interface between call center operations and sales and marketing. We identify a handful of broad themes for future investigation while also pointing out several very specific research opportunities.  相似文献   

15.
An increasing barrier to productivity in knowledge‐intensive work environments is interruptions. Interruptions stop the current job and can induce forgetting in the worker. The induced forgetting can cause re‐work; to complete the interrupted job, additional effort and time is required to return to the same level of job‐specific knowledge the worker had attained prior to the interruption. This research employs primary observational and process data gathered from a hospital radiology department as inputs into a discrete‐event simulation model to estimate the effect of interruptions, forgetting, and re‐work. To help mitigate the effects of interruption‐induced re‐work, we introduce and test the operational policy of sequestering, where some service resources are protected from interruptions. We find that sequestering can improve the overall productivity and cost performance of the system under certain circumstances. We conclude that research examining knowledge‐intensive operations should explicitly consider interruptions and the forgetting rate of the system's human workers or models will overestimate the system's productivity and underestimate its costs.  相似文献   

16.
Duan Li 《Risk analysis》2012,32(11):1856-1872
Roy pioneers the concept and practice of risk management of disastrous events via his safety‐first principle for portfolio selection. More specifically, his safety‐first principle advocates an optimal portfolio strategy generated from minimizing the disaster probability, while subject to the budget constraint and the mean constraint that the expected final wealth is not less than a preselected disaster level. This article studies the dynamic safety‐first principle in continuous time and its application in asset and liability management. We reveal that the distortion resulting from dropping the mean constraint, as a common practice to approximate the original Roy’s setting, either leads to a trivial case or changes the problem nature completely to a target‐reaching problem, which produces a highly leveraged trading strategy. Recognizing the ill‐posed nature of the corresponding Lagrangian method when retaining the mean constraint, we invoke a wisdom observed from a limited funding‐level regulation of pension funds and modify the original safety‐first formulation accordingly by imposing an upper bound on the funding level. This model revision enables us to solve completely the safety‐first asset‐liability problem by a martingale approach and to derive an optimal policy that follows faithfully the spirit of the safety‐first principle and demonstrates a prominent nature of fighting for the best and preventing disaster from happening.  相似文献   

17.
This paper provides a comprehensive survey of research on appointment scheduling in outpatient services. Effective scheduling systems have the goal of matching demand with capacity so that resources are better utilized and patient waiting times are minimized. Our goal is to present general problem formulation and modeling considerations, and to provide taxonomy of methodologies used in previous literature. Current literature fails to develop generally applicable guidelines to design appointment systems, as most studies have suggested highly situation‐specific solutions. We identify future research directions that provide opportunities to expand existing knowledge and close the gap between theory and practice.  相似文献   

18.
Dispensing of mass prophylaxis can be critical to public health during emergency situations and involves complex decisions that must be made in a short period of time. This study presents a model and solution approach for optimizing point‐of‐dispensing (POD) location and capacity decisions. This approach is part of a decision support system designed to help officials prepare for and respond to public health emergencies. The model selects PODs from a candidate set and suggests how to staff each POD so that average travel and waiting times are minimized. A genetic algorithm (GA) quickly solves the problem based on travel and queuing approximations (QAs) and it has the ability to relax soft constraints when the dispensing goals cannot be met. We show that the proposed approach returns solutions comparable with other systems and it is able to evaluate alternative courses of action when the resources are not sufficient to meet the performance targets.  相似文献   

19.
The resource‐based view has provided valuable insights into sources of competitive advantage, but little attention has been paid to the processes of resource creation. To address this shortcoming, this paper reviews the strategy process literature, explaining the theoretical positions and assumptions that underpin different types of process. It then examines the mechanisms by which resources have been found to be created; luck, resource picking, internal development and alliances. Next, a series of resource‐creation pathways that illustrate the different routes firm inputs might take on the way to becoming unique and valuable resources is developed. These pathways are also discussed in terms of the strategy processes through which they are developed, and the appropriate resource‐creation processes. The review is then extended with the introduction of two contingent variables ? task complexity and environmental stability – and the resource‐creation processes that are congruent with different combinations of these variables are explored. From this review, one is able to identify the combination of complex task and stable environment likely to be the most conducive to resource creation. Finally, the paper explores opportunities that firms might have to engineer stability and complexity in some parts of their operations with the aim of developing a resource‐based advantage.  相似文献   

20.
This research considers a multi‐item newsvendor problem with a single capacity constraint. While this problem has been addressed in the literature, the focus here is on developing simple, closed‐form expressions for the order quantities. The benefit of such an approach is that the solutions are straightforward to calculate and have managerial appeal. Additionally, we show these expressions to be optimal under a variety of conditions. For more general cases when these optimality conditions do not hold, we use these expressions as heuristic solutions. Via computational studies, we demonstrate that these heuristics are extremely effective when the optimality conditions are not satisfied.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号