首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
This paper addresses a complex set of decisions that surround the growth over time of reverse supply chain networks that collect used products for reuse, refurbishment, and/or recycling by processors. The collection network growth problem is decomposed into strategic, tactical and operational problems. This paper focuses on the strategic problem which is to determine how to allocate capital budget resource effectively to grow the network to meet long term collection targets and collection cost constraints. We model the strategic problem as a Markov decision process which can also be posed as multi-time scale Markov decision problem. The recruitment problem in a tactical level appears as a sub-problem for the strategic model. Using dynamic programming, linear programming and Q-Learning approaches, an heuristic is implemented to solve realistically sized problems. A numerical study demonstrates that the heuristic can obtain a good solution for the large-scale problem in reasonable time which is not possible when trying to obtain the optimal solution with the exact DP approach.  相似文献   

2.
多品种集约生产计划问题的模糊方法   总被引:13,自引:0,他引:13  
提出具有模糊需求量和模糊能力约束以及资本水平约束的多品种类集约生产计划问题 的模糊优化模型及模糊解方法. 通过对模糊需求量和模糊等式的描述,提出了模糊需求环境下 生产- 库存平衡方程的两种等价的描述方法, 并给出了模糊等式的实用解释. 建立了具有模 糊需求量和模糊能力约束集约生产计划问题的优化模型FMAPP ,并给出了求解模型的参数规 划方法.  相似文献   

3.
分布式供应链中基于准时制的原油采购计划方法   总被引:10,自引:3,他引:7  
本文研究了分布式供应链多供应商/多炼油厂的原油采购计划问题,建立了在有限资源约束下的准时制多目标采购优化数学模型,以实现总采购费用和供应链循环时间最小。然后,本文将非线性规划模型转化为线性规划模型,并利用层次分析法(Analytic Hierarchy Process,AHP)与多目标规划相结合的方法求解模型得到采购计划方案。数值仿真结果表明本文所提出的原油采购方法的有效性和实用性。  相似文献   

4.
In this survey we review methods to analyze open queueing network models for discrete manufacturing systems. We focus on design and planning models for job shops. The survey is divided in two parts: in the first we review exact and approximate decomposition methods for performance evaluation models for single and multiple product class networks. The second part reviews optimization models of three categories of problems: the first minimizes capital investment subject to attaining a performance measure (WIP or lead time), the second seeks to optimize the performance measure subject to resource constraints, and the third explores recent research developments in complexity reduction through shop redesign and products partitioning.  相似文献   

5.
Multi-commodity production and distribution scheduling is one of the most complex and crucial problems facing many manufacturing companies. For a major European manufacturer specialising in bottling juices and drinks, we have designed and developed a hierarchical decomposition approach to the solution of the multi-commodity production planning problem. In this paper we focus our attention on the coarsest decomposition level, called multi-commodity aggregate production planning (MCAP). It concerns the choice of the best feasible production plan for a set of products (commodities) over an extended time horizon so as to meet forecast aggregate demands throughout the horizon. At this level, the problem constraints include hard constraints (such as production lines having a maximum capacity and products having short life-times), and soft constraints (budgetary concerns.) The objective is to determine the production plan that covers each period's demands as best as possible, while minimizing all relevant costs. Our method for solving MCAP produces optimal plans in negligible times in commodity PC workstations.  相似文献   

6.
Group decision making in the presence of multiple conflicting objectives is complex and difficult. This paper describes and evaluates an iterative technique to facilitate multiple objective decision making by multiple decision makers. The proposed method augments an interactive multiobjective optimization procedure with a preference ranking tool and a consensus ranking heuristic. Two multiple objective linear programming (MOLP) solution approaches, the SIMOLP method of Reeves and Franz [39] and the interactive weighted Tchebycheff procedure of Steuer and Choo [49], are recommended optimization strategies to be used independently or in concert. Computational experience suggests that the proposed framework is an effective decision-making tool. The procedure quickly located excellent compromise solutions in a series of test problems with hypothetical decision makers. In addition, human decision makers gave positive evaluations of the procedure and the production plans the procedure provided for a resource allocation case problem.  相似文献   

7.
In this paper we present a general model and solution methodology for planning resource requirements (i.e., capacity) in health care organizations. To illustrate the general model, we consider two specific applications: a blood bank and a health maintenance organization (HMO). The blood bank capacity planning problem involves determining the number of donor beds required and determining the size of the nursing and support staff necessary. Capacity must be sufficient to handle the expected number of blood donors without causing excessive donor waiting times. Similar staff, equipment, and service level decisions arise in the HMO capacity planning problem. To determine resource requirements, we develop an optimization/queueing network model that minimizes capacity costs while controlling customer service by enforcing a set of performance constraints, such as setting an upper limit on the expected time a patient spends in the system. The queueing network model allows us to capture the stochastic behavior of health care systems and to measure customer service levels within the optimization framework.  相似文献   

8.
W Thomas Lin 《Omega》1980,8(3):375-382
An important problem confronting decision makers in modern organizations is how to plan and control in a multiple goal decision setting. The usual approach for attacking this problem is to assume one dominant goal and treat others as constraints for the budget planning purpose. The traditional accounting control system is a variance analysis which makes a comparison between an ex ante planning budget, a budget adjusted to the actual activity level, and actual results. The present paper describes how to set up multiple goal planning models by using goal programming and multiple objective linear programming techniques. And an opportunity cost concept of ex post accounting variance analysis (which a comparison is made between an ex ante budget, ex post optimum budget, and actual results) is used as a control device. This ex post analysis will signal a deviation in any data input parameter in the planning models.  相似文献   

9.
多项目人力资源调度实证研究   总被引:2,自引:0,他引:2  
针对某公寓大修项目,建立有关人力资源约束下的多项目进度管理问题混合整数规划模型。其中考虑了多种约束,如项目对人员能力、水平的不同要求,而人员又具有多种能力及水平;目标为满足约束的条件下总成本最小化,其中包含按时间计费的工资,和福利等的固定费用。为了简化计算,采用列生成法把复杂的多项目模型分解为一个主问题和多个子问题并协调主问题和子问题求解。同时由于子问题的复杂性难以精确求解,采用启发式算法求解:首先由基于优先原则的启发式方法给出问题的初始解,再由遗传算法寻优。最后通过该实际案例的应用,表明此方法能够快速有效的解决实际问题,给决策者提供信息,帮助指导实践。  相似文献   

10.
Traditional production control systems based on the manufacturing resource planning concept do not sufficiently support the planner in solving capacity problems, ignore capacity constraints and assume that lead times are fixed. This leads to problems on the shop floor, that cannot be resolved in the short term. This paper focuses on solving these capacity problems by improving capacity planning at the material requirements planning MRP level through integration of MRP and finite capacity planning. This results in a planning method for simultaneous capacity and material planning. The planning method is based on a new and more accurate primary process model, giving the planning algorithm more flexibility in solving capacity problems. The algorithm is based on advanced scheduling techniques and uses aggregated information, thus combining speed and accuracy. The algorithm is designed to use the available flexibility: alternative routeings, safety stock, and replanning of production orders and requirements. This paper also discusses such related issues as robustness, memory and the role of the human planner.  相似文献   

11.
In this paper, a mathematical programming methodology is applied to a production planning problem involving a soybean processing plant which can purchase its raw materials from multiple origins and must ship its finished products to multiple destinations. A time horizon production planning model is developed, with the objective of maximizing the net income produced by this plant. This model is tested for a five origin, three destination, processing network, over a thirteen month time horizon. Test results, in terms of a production plan and associated purchasing-allocation decisions, are presented and discussed.  相似文献   

12.
Co‐creation offers firms and their network of actors significant opportunities for innovation, as each actor offers access to new resources through a process of resource integration. However, despite the significant advantages that co‐creation can offer, there is surprisingly little research providing a strategic approach for identifying the most advantageous co‐creation opportunities, especially when many possible options are available. Recently, scholars have called for research that develops tools and processes related to co‐creation. This study addresses these priorities, making two contributions. First, in contrast to previous work considering co‐creation more generally, or focusing on one specific form only, e.g. co‐production, this paper offers a detailed and granular approach to co‐creation design. A co‐creation design framework is developed, which incorporates multiple design dimensions and categories that can reveal new co‐creation opportunities. Second, the research extends the application of a design approach, specifically within the context of co‐creative activities. The authors use field‐based research with senior executives to develop a framework that includes key co‐creation design elements. A morphological approach is used to explore how a lead firm can identify attractive co‐creation opportunities. An innovation solution in one organization provides an illustration of how the co‐creation design framework can be applied.  相似文献   

13.
The audit staff planning problem, a specific type of manpower planning problem, has been modeled using goal programming and, more recently, multiple objective linear programming. Prior studies developed single-period models and did not go beyond the model building stage. This study develops a multiperiod audit staff planning model and evaluates the model using a test application involving actual decision makers (partners in public accounting firms). The multiperiod model includes seven objectives to be optimized: profit (to be maximized), late completion of work, work declined, staff augmentation, staff reduction, underutilization of the work force, and shortfall in meeting professional development targets (all to be minimized). Over a four-quarter planning horizon with one “busy season,” the model is subject to constraints with respect to the projected audit work load, ability to substitute personnel and to perform interim audit work, available staff hours (including overtime limitations), supervisory requirements, and professional development targets. Results of the test application showed that the model was capable of producing a range of values for each objective. The participants were exposed to much of that range when making their decisions. The results also showed that all objectives were important and that participants were consistent in choosing their preferred level of each objective over several runs of the model. These results and the reactions of the participants demonstrate that the model is usable by actual decision makers and has potential for a number of specific applications.  相似文献   

14.
在传统的网络计划模型中,当所有的紧前工序结束后,当前工序就能够马上开始。但在实践过程中,由于许多工序会受到开始时间的约束,因此工序很少能在满足优先关系约束后的任意时刻开始,而具有时间转换约束的网络则能很好地描述此类问题。本文主要研究在时间转换约束下,不同类型的工序在网络中的时间特性变化情况,并在现有研究基础上,将网络中工序的时间参数由传统的算法转换成具有时间转换约束的时间参数,提出新的机动时间计算公式。最后以案例的形式分析比较传统网络与具有时间转换约束网络的区别,从而体现时间转换约束网络模型的实践价值。  相似文献   

15.
针对产品开发项目管理的实际情况,对策略层计划优化方法进行研究。以工作包的工作量估算为基础,以资源投入水平和工期最小化为目标,考虑各种约束条件,提出一种策略层项目计划问题的混合整数规划问题模型。以非支配遗传算法NSGA-II为基础框架,设计了一种改进的双目标遗传算法。该算法针对问题的特点,提出了基于资源平滑的解码算法。参考NSGA-III的关键特征,对拥挤密度计算方法进行改进。通过企业实际项目案例,验证了算法的性能和所提出的策略层项目计划方法的有效性。  相似文献   

16.
Aggregate production planning (APP) has been studied extensively for the past two decades. The APP problem, also called production and workforce scheduling, is to determine the optimal workforce and production level in each period of the planning horizon in order to satisfy demand forecasts for these periods. The advantages of the APP are low cost of data collection and computational cost of the running model; the accuracy of data; and, effective managerial understanding of the results. If the product of concern takes longer than one period, it is called a long-cycle product. Examples of long-cycle products are aircraft, ships, buildings and special machines. A detailed model incorporating dynamic productivity and long-cycle products considerations is presented to solve the problem of production and workforce planning. Using a multistage production system approach, a search technique is developed to solve this class of problems where the objective function is linear and some of the constraint coefficients are dynamically nonlinear. The model provides a better solution than an aggregate production planning model, often used to solve these problems.  相似文献   

17.
RG Borley  SH Taylor  CR West 《Omega》1981,9(5):493-499
Planning for care of the Elderly has to face the problems of an increasing elderly population; a wide range of alternative ways of caring for them (at widely differing costs); the fact that services are provided by several different organisations all facing difficult financial constraints; a range of professional opinion about the desirability or otherwise of alternative patterns of care and use of resources; a lack of data on how care is at present distributed; the lack of a structure for organising such data as are available; and the lack of an appropriate computer-based model for manipulating the large number of data elements necessary to describe and help to evaluate alternative plans for the future. The Balance of Care approach to the Joint Strategic Planning of Health and Social Services provision for the Elderly, is being used in pilot applications in two Areas in the UK. Its contribution to the solution of the problems outlined above is described by authors from the two Areas. The approach and the underlying model can be extended to strategic planning for other client groups requiring non-acute care.  相似文献   

18.
From the viewpoint of integration, the production objective of flexible manufacturing systems (FMS) should follow results of MRP/CRP. Thus, the planning goal of short-term production planning (STPP) is to satisfy quantity and due date requirements determined by MRP/CRP. The STPP of FMS should cover part type selection, production ratio, process selection, process ratio, resource allocation, machine grouping, routing mix and loading problems.

A STPP system is built to solve the STPP problem of an FMS having multiple machine types, each with multiple m.'ichinc units. This system adopts a variable-period flexible planning approach, using part mix and process selection flexibilities to solve STPP problems. It also provides flexibilities in its operations sequence and in the machine routing to the dynamic operation planning system.  相似文献   

19.
An interactive decision aid is introduced for the deployment of two sales resources: salespeople and sales support staff. The aid consists of a normative sales resource allocation model with five objectives and an interactive multiple objective programming solution procedure. The specific decision problem addressed involves the assignment of salespeople and sales support people to customer accounts and the allocation of the time they spend on these accounts. The authors contribute to the existing sales resource modeling literature by dealing with the deployment of two sales resources and interactively solving this problem with respect to five short-run and long-run objectives of the firm. This approach differs from existing sales force modeling efforts in which the solution is found noninteractively by optimizing a single sales resource model with respect to a single objective, often short-run sales. An application of the decision aid to the deployment problem of an industrial sales force manager is presented. Furthermore, useful extensions of the basic sales resource allocation model are discussed.  相似文献   

20.
The choice of a suitable decision criterion is a difficult decision for many decision makers. In general, each criterion selects a different optimal act, each having its own appealing features. This paper proposes an approach allowing the decision maker to incorporate multiple criteria into an easily solved mathematical programming model whose solution is the optimal act. Optimality is defined by the objective function used in the model. The constraints embody the decision maker's anxieties and minimal desires.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号