首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 556 毫秒
1.

This paper addresses the problem of aggregate production planning (APP) for a multinational lingerie company in Hong Kong. The multi-site production planning problem considers the production loading plans among manufacturing factories subject to certain restrictions, such as production import/export quotas imposed by regulatory requirements of different nations, the use of manufacturing factories/locations with regard to customers' preferences, as well as production capacity, workforce level, storage space and resource conditions of the factories. In this paper, a multi-objective model is developed to solve the production planning problems, in which the profit is maximized but production penalties resulting from going over/under quotas and the change in workforce level are minimized. To enhance the practical implications of the proposed model, different managerial production loading plans are evaluated according to changes in future policy and situation. Numerical results demonstrate the robustness and effectiveness of the developed model.  相似文献   

2.

Period Batch Control was developed and first applied during the Second World War. The historic roots are discussed and the principles of this classic production planning approach explained, PBC compared to other production control concepts, and it is demonstrated that it may still be fruitfully applied, especially in combination with cellular manufacturing. It is therefore considered as a classic, but not outdated production planning concept.  相似文献   

3.

The growing importance of providing service to customers, e.g. post-sale assistance, supplying of spare parts, upgrading and integration of new elements in installed systems, enhances the importance of planning and management of upgrading parts in most manufacturing industries. These parts are generally characterized by high technical heterogeneity and have a highly variable and difficult to forecast demand. In some areas (especially the most dynamic, e.g. high-tech products), these kinds of components are quite common, and represent a very strong relation between the manufacturing firm and the market. These parts are generally too many to be efectively supported on a planning database system with individual records and too heterogeneous ( and sometimes with a too high value) to be supported all together in a single record. In this paper, we want to study the application of adaptive techniques for the clustering of these components in classes based on the similarities in their market behaviour in order to build an optimal database for planning production and supplying of these components.  相似文献   

4.

The paper presents a hierarchical framework for production control of hospitals which deals with the balance between service and efficiency, at all levels of planning and control. The framework is based on an analysis of the design requirements for hospital production control systems. These design requirements are translated into the control functions at different levels of planning required for hospital production control. The framework consists of five levels of planning and control: patient planning and control, patient group planning and control, resources planning and control, patient volumes planning and control and strategic planning, though this last level does not make part of production control as such. Each of the levels of the framework is further elaborated in terms of the decisions made regarding patient flows and resources, and the co-ordination of the different planning levels. Implications of the framework are discussed by describing some points where current practice deviates from assumptions made in our approach. Recommendations for future research and development of the planning framework are formulated.  相似文献   

5.

There are numerous tools available to be used for production planning and control purposes. The number of tools is ever increasing, and so are the levels of sophistication as well as complexity. For the specific manufacturing firm, the task of selecting the most appropriate set of tools is not trivial. However, in recent years, the understanding of the relationship between tools and manufacturing environments for which they are suitable has increased. The purpose of this paper is to provide an overview of production planning and control tools available today, as well as new trends, issues and ideas.  相似文献   

6.
Flexibility in manufacturing has been identified as one of the key factors to success in the marketplace. Many types of flexibility have been identified in the literature among which volume flexibility is one of the most important. Volume flexibility of a manufacturing system is defined as its ability to be operated profitably at different overall output levels. Volume flexibility permits a manufacturing system to adjust production upwards or downwards within wide limits. In this paper, we develop an aggregate production planning model for volumeflexible production systems. The model can be used with a Monte Carlo simulation to evaluate the optimal level of investment in volume flexibility for a firm operating under a given set of market conditions. In addition, the model can be used to develop some conclusions about the relationship between the value of volume flexibility and the cost of holding inventory, the cost of shortage, forecast accuracy, and the length of the planning horizon.  相似文献   

7.

Amongst factors such as quick changeovers and workforce flexibility, managers in 533 UK manufacturing plants ranked a responsive planning and control system as the most important facilitator of good delivery performance on products made-to-order or assembled-to-order. The rankings indicate greater importance to companies in the Household and Engineering sectors than in Process and Electronics, where other factors are dominant. These results are combined with data such as customer lead times and item variety, to characterize and explain differences between the plants in these four sectors. Collectively the results indicate considerable differences in the production planning and control tasks. This implies that general statements on the importance of planning and control systems are inadequate. Practitioners need contextual information in order to ascertain when research is applicable to their circumstances.  相似文献   

8.

This paper presents the aggregate production planning for multiple product types where the worker resource can be transferred among the production lines. A mathematical model was formulated in spreadsheet format. Then the spreadsheet-solver technique was used as a tool to solve the model. A real situation of a manufacturing company was selected as a case study. The actual data was used to test and validate the proposed model. The optimal aggregate production plan provides the information on managing the available production capacity together with the useful workforce transferring plan. The obtained solutions were compared to those of another approach where the workers cannot be transferred among the production lines. The total cost is significantly reduced when the workers are allowed to transfer among the production lines.  相似文献   

9.
In this paper, a hierarchical planning system is proposed which integrates aggregate capacity planning with MRP. This system is to be implemented in a metal box manufacturing company which multi-user MRP system covering manufacturing activities as well as procurement sales order processing and accounting systems. The hierarchical planning system includes a medium-range aggregate planning model adapted to the firm's requirements and strategies. The model consists of a mathematical formulation which covers labour capacity has already installed a constraints and includes certain cost estimations in the objective function. The planning horizon of the medium range planning is taken as twelve months in order to cover sales seasonality. The aggregate production quantities resulting from the optimized medium-range planning model are disaggregated according to procedures already found in the literature. Furthermore, the theoretical infeasibilities pertaining to the disaggregation procedures are also resolved in an heuristic manner. Using the latter modified disaggregation procedure, a feasible disaggregated plan is generated for the whole planning horizon. The proposed plan is compared with the current production policy of the firm and it is observed that the proposed plan leads to backorder reduction.  相似文献   

10.

Fundamental and extended multi-objective (MO) models are designed to address earliness/tardiness production scheduling planning (ETPSP) problems with multi-process capacity balance, multi-product production and lot-size consideration. A canonical genetic algorithm (GA) approach and a prospective multi-objective GA (MOGA) approach are proposed as solutions for different practical problems. Simulation results as well as comparisons with other techniques demonstrate the effectiveness of the MOGA approach, which is a noted improvement to any of the existing techniques, and also in practice provides a new trend of integrating manufacturing resource planning (MRPII) with just-in-time (JIT) in the production planning procedure.  相似文献   

11.
12.

We consider the production process of a manufacturing workcell. Production items obtained from an outside supplier are not processed adequately as far as their quality is concerned. Production items meeting the required quality depend on the workcell state, which degrades according to the number of produced items. The workcell is completely restored by some restoring operations leading to its as-new condition. The method of deriving the restoration period, which leads to the maximum probability that produced items meet the required quality, is introduced. It is based on the nontraditional approach, i.e. on the simplest strategies method for the formulation of the problem presented here. The implementation of this optimization approach is illustrated with an example.  相似文献   

13.

An enterprise resource planning system (ERP) is the information backbone of many manufacturing companies. At the core of ERP is a conventional material requirements planning (MRP) production planning system or a variation of MRP when just-in-time (JIT) principles are used in manufacturing. MRP and JIT both organize production planning into a hierarchy of long-, medium- and short-range problems. In all there are eight different problems. Some are common to MRP and JIT, others are specialized for a particular system. This paper analyses the computational requirements of these problems. This is important for ERP because it plans for large numbers of products (e.g. 50 000 products at 3M Company and 44 000 products at States Industries in Oregon) at large numbers of locations (e.g. 82 locations in 21 countries for Visteon Automotive Systems of Michigan and 19 locations at Boeing). We show that adequate algorithms exist for some problems, but better algorithms are needed for other problems if ERP is to provide useful production plans.  相似文献   

14.
Aggregate planning (AP) is a necessary activity for manufacturing and services alike. A shift toward high-volume batch and continuous flow processes within American manufacturing has given rise to increasing numbers of crew-loaded facilities. A majority of AP approaches incorporate continuous decision variables and require frequent adjustments to both production and work-force settings. Despite the availability and diversity of these approaches, few significant applications have been reported. This paper presents the detailed development of a discrete AP switching rule that can be applied to a variety of cost environments. Inventory costs are estimated using an interval approach rather than traditional point estimates. The model allows incorporation of overtime options and is interactive in nature. Decision variables from the model can be disaggregated and linked directly to lower-level planning activities. Actual results of model implementation are reported. An overview of the model's incorporation into the larger context of hierarchical production planning is found in [21].  相似文献   

15.

There are many computer-aided production planning and control (PPC) systems available on the market which can provide a solution to the complex task of production planning and control. However, the question remains, how can a company find an optimal system from the vast amount of available systems? This article proposes that a company, having decided to buy one of the available systems, starts a project for selection and implementation of the PPC system.  相似文献   

16.
In uncertain environments, the master production schedule (MPS) is usually developed using a rolling schedule. When utilizing a rolling schedule, the MPS is replanned periodically and a portion of the MPS is frozen in each planning cycle. The cost performance of a rolling schedule depends on three decisions: the choice of the replanning interval (R), which determines how often the MPS should be replanned; the choice of the frozen interval (F), which determines how many periods the MPS should be frozen in each planning cycle; and the choice of the forecast window (T), which is the time interval over which the MPS is determined using newly updated forecast data. This paper uses an analytical approach to study the master production scheduling process in uncertain environments without capacity constraints, where the MPS is developed using a rolling schedule. It focuses on the choices of F, R, and T for the MPS. A conceptual framework that includes all important MPS time intervals is described. The effects of F, R, and T on system costs, which include the forecast error, MPS change, setup, and inventory holding costs, are also explored. Finally, a mathematical model for the MPS is presented. This model approximates the average system cost as a function of F, R, T, and several environmental factors. It can be used to estimate the associated system costs for any combination of F, R, and T.  相似文献   

17.

In a discrete parts manufacturing environment, material requirement planning (MRP) is carried out without considering the manufacturing resource capacity. As a result, during implementation, adjustments in planned orders may become necessary. This paper presents a finite capacity material requirements planning algorithm (FCMRP) to obtain capacity-based production plans. These plans need no costly adjustments to satisfy the capacity constraints. Performance of the FCMRP system, when studied through a set of test examples, has been found to be superior to the existing MRP system.  相似文献   

18.

Future production concepts where workshop employees responsibly carry through planning and scheduling tasks call for new principles ofcomputer-aided production management (CAPM). With the aid of a critical analysis ofdifferent planning and scheduling mechanisms it will first be laid down why the field of computer-aided production management is suited for a dialogue-oriented planning support based on simple models rather than for the objective of automation with the aid of refined optimization algorithms. Consequently, an alternative design is proposed. This is a prototypically realized concept aiming at computer-aided support of production management of production teams.  相似文献   

19.
Batch manufacturing firms are experiencing significant changes because of technological developments in work center design, such as flexible manufacturing systems (FMS) and planning/control tools like computer-aided process planning (CAPP). These new developments provide production managers with some solutions to a number of complex problems. For example, numerical-controlled (NC) machine center installations are effective in providing quality parts because of tight tolerance specifications built into the equipment. However, these highly efficient centers create bottlenecks that constrain shop throughput, since production planners tend to rely too much on them. To help improve manufacturing planning, we introduce an important element to the batch production scheduling component of CAPP's mission—evaluating possible alternate routes. Production scheduling encompasses job route selection as well as machine center assignment (loading), job releasing, and setting due dates. In this paper, three routing strategies requiring different levels of shop floor information are tested and evaluated using computer simulation. Shop performance is measured by total cost and traditional measures of job flow time, lateness, and tardiness.  相似文献   

20.

The paper presents the main routines of production and inventory control at ABB Motors, Västerås and Volvo Wheel Loaders, Eskilstuna. The primary interest is to present how Material Requirements Planning (MRP) is used in these two companies. If the number of end items is large, the company assembles-to-order or makes-to-order then additions to pure MRP seem to be necessary. ABB Motors and Volvo Wheel Loader use: planning bills, a normal bill of materials with 'adding bills of materials', a master production schedule planning system with an available-to-promise function and a home-made 'system' for modules available-to-promise. One important measure for the both companies is the accumulative lead-time. An increase of the Master Production Schedule in a shorter time than the accumulative lead-time is avoided, because it will lead to suggestions of purchase in past time periods and therefore most probably to future material shortages.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号