首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 125 毫秒
1.
A Master Production Scheduling Decision Support System within a multi-product medical supplies market has the dual task of providing good customer service levels while maintaining minimum reasonable levels of finished goods stock in the face of considerable internal manufacturing lead time and customer demand uncertainty. This paper examines the critical design parameters within an adaptive model highlighting how the total system orders in the internal pipeline are utilized in the decision-making process for assessing how much to load the internal manufacturing pipeline. Two different methods for tracking manufacturing lead times within the adaptive loop are also considered. Classical control concepts are applied within the Decision Support System (DSS) to avoid any long-term drift in finished stocks. Finally scenario analysis is performed via simulation for a set of design parameters and a range of stimuli typical of company operating situations. An effective decision support system design in terms of architecture and parameter settings is recommended based upon the ability of the model to maintain high customer service levels. The DSS readily interfaces between marketing and production functions to enhance company competitive advantage across a wide range of products.  相似文献   

2.
Tadeusz Sawik 《Omega》2010,38(3-4):203-212
The problem of allocation of orders for custom parts among suppliers in make to order manufacturing is formulated as a single- or multi-objective mixed integer program. Given a set of customer orders for products, the decision maker needs to decide from which supplier to purchase custom parts required for each customer order. The selection of suppliers is based on price and quality of purchased parts and reliability of on time delivery. The risk of defective or unreliable supplies is controlled by the maximum number of delivery patterns (combinations of suppliers delivery dates) for which the average defect rate or late delivery rate can be unacceptable. Furthermore, the quantity or business volume discounts offered by the suppliers are considered. Numerical examples are presented and some computational results are reported.  相似文献   

3.
Most manufacturing process maintain separate fabrication and assembly centres. Based on this observation, the author coincides a manufacturing process that contains two stages of production with multiple machines. The manufacturer produces a variety of products to satisfy customer demands, operates under a 'push' mode and in a ‘ make-to-order’ environment. Each customer order consists of known quantities of different products which must be delivered as a whole shipment. Periodically, the manufacturer schedules all the accumulated unscheduled customer orders. The scheduling objective is to minimize the sum of weighted customer order lead times. Such manufacturing systems are formulated as a mathematical programming problem. It is then shown that this problem is unary NP-hard and remains unary NP-hard even when all the weights are equal. Some insights about the structure of the optimal schedule(s) are provided and some special cases solved in polynomial time. Several polynomial time heuristics are proposed, and worst-case analysis of some of the heuristics are provided. Tight lower bounds are developed in order to measure the performance of the proposed heuristics. Numerical examples are presented and possible extensions are discussed.  相似文献   

4.
针对由一个制造工厂和多个区域服务中心组成的服务型制造企业,研究了考虑生产时间和服务时间均具有随机性且工期可指派的产品服务系统(PSS)订单调度问题。首先以最小化订单提前、误工和工期指派费用的期望总额为目标构建问题的优化模型,然后分析目标函数近似值的最优性条件,据此提出加权最短平均生产时间排序规则,并结合该规则与插入邻域局部搜索设计了启发式算法对问题进行求解,最后通过数值仿真验证算法的可行性和有效性。研究表明,提前费用偏差对PSS订单调度与工期指派决策的影响很小,因此企业管理者无需准确估计库存费用也能制定出比较有效的PSS订单调度策略;而工期指派费用偏差对决策结果的影响非常大,因此企业管理者在决策时必须谨慎估计该项费用。  相似文献   

5.
Delivery guarantees are an important element in a customer satisfaction program. When setting delivery guarantees, a firm must consider customer expectations as well as operational constraints. We develop a profit‐maximization model in which a firm's sales organization, with incomplete information on operations' status, solicits orders and quotes delivery dates. If obtained, orders are processed in a make‐to‐order facility, after which revenue is received, minus tardiness penalty if the delivery was later than quoted. We specify conditions for an optimal log‐linear decision rule and provide exact expressions for its effect on arrival rate, mean processing time, and mean cycle time.  相似文献   

6.
Uniform product deliveries are required in the ceramic, horticulture and leather sectors because customers require product homogeneity to use, present or consume them together. Some industries cannot prevent the lack of homogeneity in products in their manufacturing processes; hence, they cannot avoid non-uniform finished products arriving at their warehouses and, consequently, fragmentation of their stocks. Therefore, final uniform product amounts do not match planned production ones, which frequently makes serving previous committed orders with homogeneous quantities impossible. This paper proposes a model-driven decision support system (DSS) to help the person in charge of delivery management to reallocate the available real inventory to orders to satisfy homogenous customer requirements in a collaborative supply chain (SC). The DSS has been validated in a ceramic tile collaborative SC.  相似文献   

7.
This study investigates the impact of planned lead times on performance in multistage manufacturing where material requirements planning is used in a make-to-stock environment. We simulate a variety of different operating environments and find: (1) planned lead times are important to customer service levels under all operating environments examined, but have a smaller impact on inventory investment; (2) tight due dates introduced by short planned lead times hurt customer service without saving much inventory; (3) small increases to tight planned lead times improve customer service substantially with small inventory increases; (4) co-component inventories change with planned lead times, and disparity between such inventories is a sign of poor timing coordination; (5) the fixed order quantity rule performs better than the periodic order quantity rule; and (6) tall product structure and large lot sizes require particular attention to planned lead times. The findings also extend the current understanding of planned lead times by including uncertainties such as forecast error, yield loss, and equipment reliability. The study concludes with a way to diagnose and improve poorly set planned lead times.  相似文献   

8.
We consider an integrated production–distribution scheduling model in a make‐to‐order supply chain consisting of one supplier and one customer. The supplier receives a set of orders from the customer at the beginning of a planning horizon. The supplier needs to process all the orders at a single production line, pack the completed orders to form delivery batches, and deliver the batches to the customer. Each order has a weight, and the total weight of the orders packed in a batch must not exceed the capacity of the delivery batch. Each delivery batch incurs a fixed distribution cost. The problem is to find jointly a schedule for order processing and a way of packing completed orders to form delivery batches such that the total distribution cost (or equivalently, the number of delivery batches) is minimized subject to the constraint that a given customer service level is guaranteed. We consider two customer service constraints—meeting the given deadlines of the orders; or requiring the average delivery lead time of the orders to be within a given threshold. Several problems of the model with each of those constraints are considered. We clarify the complexity of each problem and develop fast heuristics for the NP‐hard problems and analyze their worst‐case performance bounds. Our computational results indicate that all the heuristics are capable of generating near optimal solutions quickly for the respective problems.  相似文献   

9.
无缝钢管的市场需求具有多品种、小批量的特点,为了在满足客户需求的同时保证高效连续化生产,文章在满足生产工艺特征的基础上将配送地址和交货期等合同因素引入热轧无缝钢管订单排程问题中,建立了以适期交货、订单集中生产配送和最小化机器设备调整为优化目标的订单排程优化模型,并设计了两阶段求解算法:首先,以订单交货期与配送地址差异最小为目标,基于凝聚策略设计了订单聚类算法,将具有相同工艺约束、相似合同要求的订单进行聚类,并形成初始轧制计划;然后,以设备调整和提前/拖期最小为目标,设计混合变邻域搜索算法,对初始轧制批次进行排程优化。基于实际订单数据的实验结果表明,模型和算法对问题的描述和求解是可行有效的。  相似文献   

10.
We study a hybrid push–pull production system with a two‐stage manufacturing process, which builds and stocks tested components for just‐in‐time configuration of the final product when a specific customer order is received. The first production stage (fabrication) is a push process where parts are replenished, tested, and assembled into components according to product‐level build plans. The component inventory is kept in stock ready for the final assembly of the end products. The second production stage (fulfillment) is a pull‐based assemble‐to‐order process where the final assembly process is initiated when a customer order is received and no finished goods inventory is kept for end products. One important planning issue is to find the right trade‐off between capacity utilization and inventory cost reduction that strives to meet the quarter‐end peak demand. We present a nonlinear optimization model to minimize the total inventory cost subject to the service level constraints and the production capacity constraints. This results in a convex program with linear constraints. An efficient algorithm using decomposition is developed for solving the nonlinear optimization problem. Numerical results are presented to show the performance improvements achieved by the optimized solutions along with managerial insights provided.  相似文献   

11.
Delivery time differentiation is a supply chain concept that has been implemented in various industries, but not yet in the automotive industry. One reason is that the effects of delivery time differentiation on the supply chain are not well understood. The BMW Group, for instance, has considered offering an express order option, where express orders bypass standard orders in the supply chain processes to achieve short delivery times. Express orders distort planning processes, increase operations cost, and increase the delivery times of standard orders, however the effects have not been quantified yet. This study analyzes the impact of express orders on the supply chain, when express orders are built‐to‐order. To understand the supply chain consequences of express orders better, we analyzed the relevant supply chain processes at BMW Group. We determine the effect that built‐to‐order express orders have on delivery times and on component demand. To analyze the effect of introducing express orders on expected delivery times and expected cost, we use queuing theory and derive expressions for the transient behavior of a discrete time batch queue. Our analyses indicate that many supply chain processes are only marginally affected. However, the orders to the suppliers become considerably more uncertain, which must be compensated by additional safety stock. Our results indicate that express orders can be an attractive option for BMW and other automotive companies. If the fraction of express orders stays at a reasonable level, express orders can be delivered within about two weeks.  相似文献   

12.
This paper studies a real-world problem arising in the context of parcel delivery. Given a heterogeneous set of resources, i.e., different drivers and different vehicles, the problem for each day consists of assigning a driver and a vehicle to each customer requiring service. Two conflicting aspects must be taken into account. On the one hand, service consistency is desirable, meaning that a customer should always be served by the same driver. On the other hand, daily demand fluctuations and tight resource constraints prohibit fixed resource assignments. With the aim of finding a reasonable compromise between these aspects, we propose a novel two-stage districting approach, which establishes delivery districts in the first stage and adapts them to the daily demand realizations in the second stage. For the first stage problem we propose three models that differ in the level of detail of their input data, their expected compliance with service consistency and the driver’s contractual working times, and their computational effort. Our two-stage approach merges the two dominant approaches in the literature, which either determine a priori routes and then adapt them on a daily basis, or derive fixed service regions for drivers. We present a case study based on a real-world data set. The results highlight the differences between the three first stage models and show that only few adaptations of the districts are necessary in the second stage to achieve feasible daily delivery tours along with a very good workload balance for drivers. We also analyze the effects of a homogeneous vs a heterogeneous fleet, of full time drivers vs full and part time drivers, and of the location of the depot and the length of the planning horizon.  相似文献   

13.
We consider a single‐period assemble‐to‐order system that produces two types of end products to satisfy two independent and stochastic customer orders. Each type of product is used to fulfill a particular customer order and these two products share a common component. Furthermore, one customer may confirm her order before the other one, and the manufacturer needs to make a commitment immediately upon the receipt of each customer order on how many products to be delivered. We propose a model for optimizing the inventory and production decisions under the above ATO environment. We also extend our model to the situation where the manufacturer can fulfill the unsatisfied low‐priority demand using the left‐over inventories after fulfilling the high‐priority demand, in case the low‐priority customer arrives first. Numerical experiments are conducted, which provide some interesting insights on the impact of uncertain demand pattern.  相似文献   

14.
We consider a dynamic problem of joint pricing and production decisions for a profit-maximizing firm that produces multiple products. We model the problem as a mixed integer nonlinear program, incorporating capacity constraints, setup costs, and dynamic demand. We assume demand functions to be convex, continuous, differentiable, and strictly decreasing in price. We present a solution approach which is more general than previous approaches that require the assumption of a specific demand function. Using real-world data from a manufacturer, we study problem instances for different demand scenarios and capacities and solve for optimal prices and production plans. We present analytical results that provide managerial insights on how the optimal prices change for different production plans and capacities. We extend some of the earlier works that consider single product problems to the case of multiple products and time variant production capacities. We also benchmark performance of proposed algorithm with a commercial solver and show that it outperforms the solver both in terms of solution quality and computational times.  相似文献   

15.
In this article, we study the newsvendor problem with endogenous setting of price and quoted lead‐time. This problem can be observed in situations where a firm orders semi‐finished product prior to the selling season and customizes the product in response to customer orders during the selling season. The total demand during the selling season and the lead‐time required for customization are uncertain. The demand for the product depends not only on the selling price but also on the quoted lead‐time. To set the quoted lead‐time, the firm has to carefully balance the benefit of increasing demand as the quoted lead‐time is reduced against the cost of increased tardiness. Our model enables the firm to determine the optimal selling price, quoted lead‐time, and order quantity simultaneously, and provides a new set of insights to managers.  相似文献   

16.
A lead time that is short, predictable, and reliable is an increasingly important criterion in supplier selection. Although many companies may achieve this through lean implementation, high‐variety manufacturers, for example, small and medium‐sized make‐to‐order companies, have found that lean's planning and control techniques do not apply. This article outlines a planning and control concept known as workload control (WLC) that integrates customer enquiry management, including a due‐date setting rule, with order release control. Simulation is then used to assess its impact on shop performance. Results demonstrate that an integrated WLC concept can reduce the percentage of tardy jobs—so short lead times can be realistically quoted—while also reducing and stabilizing workloads. WLC can level demand and production over time when work is not standardized and it is not possible to synchronize flows on the shop floor. Results are shown to be robust to changes in routing characteristics, the mix of orders with due dates specified by the customer and proposed internally, and the strike rate (or order‐winning probability). Hence, an integrated approach to WLC represents an important step toward achieving lean in make‐to‐order companies.  相似文献   

17.
Customer satisfaction can be achieved by providing rapid delivery of a wide variety of products. High levels of product variety require correspondingly high levels of inventory of each item to quickly respond to customer demand. Delayed product differentiation has been identified as a strategy to reduce final product inventories while providing the required customer service levels. However, it is done so at the cost of devoting large production capacities to the differentiation stage. We study the impact of this postponement capacity on the ability to achieve the benefits of delayed product differentiation. We examine a single‐period capacitated inventory model and consider a manufacturing system that produces a single item that is finished into multiple products. After assembly, some amount of the common generic item is completed as non‐postponed products, whereas some of the common item is kept as in‐process inventory, thereby postponing the commitment to a specific product. The non‐postponed finished‐goods inventory is used first to meet demand. Demand in excess of this inventory is met, if possible, through the completion of the common items. Our results indicate that a relatively small amount of postponement capacity is needed to achieve all of the benefits of completely delaying product differentiation for all customer demand. This important result will permit many firms to adopt this delaying strategy who previously thought it to be either technologically impossible or prohibitively expensive to do so.  相似文献   

18.
We consider an environment where a production facility modeled as a single machine needs to assign delivery dates to several orders and find a feasible sequence. Tardy jobs are not allowed. The delivery dates are to be at prespecified fixed intervals. The objective is to minimize the due date penalty and the cost of earliness. We provide a dynamic programming-based solution procedure that runs in polynomial time. We develop several dominance results that reduced the computational requirement by an order of magnitude in our computational study.  相似文献   

19.
This article examines demand, manufacturing, and supply factors proposed to inhibit manufacturer delivery execution. Extant research proposes many factors expected to harm delivery performance. Prior cross‐sectional empirical research examines such factors at the plant level, generally finding factors arising from dynamic complexity to be significant, but factors arising from detail complexity to be insignificant. Little empirical research examines the factors using product‐level operating data, which arguably makes more sense for analyzing how supply chain complexity factors inhibit delivery. For purposes of research triangulation, we use longitudinal product‐level data from MRP systems to examine whether the factors inhibit internal manufacturing on time job rates and three customer‐oriented measures of delivery performance: product line item fill rates, average delivery lead times, and average tardiness. Our econometric models pool product line item data across division plants and within distinct product families, using a proprietary monthly dataset on over 100 product line items from the environmental controls manufacturing division of a Fortune 100 conglomerate. The data summarize customer ordering events of over 900 customers and supply chain activities of over 80 suppliers. The study contributes academically by finding significant detail complexity inhibitors of delivery that prior studies found insignificant. The findings demonstrate the need for empirical research using data disaggregated below the plant‐level unit of analysis, as they illustrate how some factors previously found insignificant indeed are significant when considered at the product‐level unit of analysis. Managers can use the findings to understand better which drivers and inhibitors of delivery performance are important.  相似文献   

20.
《Omega》2005,33(1):33-45
Electronic commerce (EC) is increasingly popular in today's businesses. The business-to-consumer EC environment has voluminous, unpredictable, and dynamically changing customer orders. A major part of the delivery system of this environment is the dynamic vehicle routing (DVR) system. This study investigates several algorithms suitable for solving the DVR problem in business-to-consumer (B2C) EC environment. It designs the solution process into three phases: initial-routes formation, inter-routes improvement, and intra-route improvement. A computer program is created to demonstrate a system simulating vehicle routing process under the online B2C environment. The simulated system collects data for system performance indexes such as simulation time, travel distance, delivery time, and delay time. The results show that when orders are placed through the Internet in an online B2C environment, the Nearest algorithms can be used to find satisfactory routes during the first phase of a DVR delivery system. The three-phase solution process is proven to be significantly better in travel distance and delivery time than the conventional single-phase solution process.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号