首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
2.
Traditional machine scheduling literature generally assumes that a machine is available at all times. Yet this assumption may not be accurate in real manufacturing systems. In many cases, a machine's tool must be changed after it has continuously worked for a period of time. This paper deals with a single machine scheduling problem subject to tool wear, given the allowed maximum continuous working time of the machine is TLTL (tool life) and the tool change time is TCTC. Job processing and tool changes are scheduled simultaneously. In this paper, we examine this problem to minimize the total tardiness of jobs. Two mixed binary integer programming models are developed to optimally solve this problem. Computational experiments are performed to evaluate the models’ efficiency.  相似文献   

3.
Despite their diverse applications in many domains, the variable precision rough sets (VPRS) model lacks a feasible method to determine a precision parameter (β)(β) value to control the choice of ββ-reducts. In this study we propose an effective method to find the ββ-reducts. First, we calculate a precision parameter value to find the subsets of information system that are based on the least upper bound of the data misclassification error. Next, we measure the quality of classification and remove redundant attributes from each subset. We use a simple example to explain this method and even a real-world example is analyzed. Comparing the implementation results from the proposed method with the neural network approach, our proposed method demonstrates a better performance.  相似文献   

4.
This paper deals with the dynamic multi-item capacitated lot-sizing problem under random period demands (SCLSP). Unfilled demands are backordered and a fill rate constraint is in effect. It is assumed that, according to the static-uncertainty strategy of Bookbinder and Tan [1], all decisions concerning the time and the production quantities are made in advance for the entire planning horizon regardless of the realization of the demands. The problem is approximated with the set partitioning model and a heuristic solution procedure that combines column generation and the recently developed ABCβABCβ heuristic is proposed.  相似文献   

5.
This paper deals with the optimal selection of m out of n facilities to first perform m   given primary jobs in Stage-I followed by the remaining (n-m)(n-m) facilities performing optimally the (n-m)(n-m) secondary jobs in Stage-II. It is assumed that in both the stages facilities perform in parallel. The aim of the proposed study is to find that set of m   facilities performing the primary jobs in Stage-I for which the sum of the overall completion times of jobs in Stage-I and the corresponding optimal completion time of the secondary jobs in Stage-II by the remaining (n-m)(n-m) facilities is the minimum. The developed solution methodology involves solving the standard time minimizing and cost minimizing assignment problems alternately after forbidding some facility-job pairings and suggests a polynomially bound algorithm. This proposed algorithm has been implemented and tested on a variety of test problems and its performance is found to be quite satisfactory.  相似文献   

6.
In this paper, permutation flow shops with total flowtime minimization are considered. General flowtime computing (GFC) is presented to accelerate flowtime computation. A newly generated schedule is divided into an unchanged subsequence and a changed part. GFC computes total flowtime of a schedule by inheriting temporal parameters from its parent in the unchanged part and computes only those of the changed part. Iterative methods and LR (developed by Liu J, Reeves, CR. Constructive and composite heuristic solutions to theP∥ΣCiPΣCi scheduling problem, European Journal of Operational Research 2001; 132:439–52) are evaluated and compared as solution improvement phase and index development phase. Three composite heuristics are proposed in this paper by integrating forward pair-wise exchange-restart (FPE-R) and FPE with an effective iterative method. Computational results show that the proposed three outperform the best existing three composite heuristics in effectiveness and two of them are much faster than the existing ones.  相似文献   

7.
The flowshop scheduling problem (FSP) has been widely studied in the literature and many techniques for its solution have been proposed. Some authors have concluded that genetic algorithms are not suitable for this hard, combinatorial problem unless hybridization is used. This work proposes new genetic algorithms for solving the permutation FSP that prove to be competitive when compared to many other well known algorithms. The optimization criterion considered is the minimization of the total completion time or makespan (CmaxCmax). We show a robust genetic algorithm and a fast hybrid implementation. These algorithms use new genetic operators, advanced techniques like hybridization with local search and an efficient population initialization as well as a new generational scheme. A complete evaluation of the different parameters and operators of the algorithms by means of a Design of Experiments approach is also given. The algorithm's effectiveness is compared against 11 other methods, including genetic algorithms, tabu search, simulated annealing and other advanced and recent techniques. For the evaluations we use Taillard's well known standard benchmark. The results show that the proposed algorithms are very effective and at the same time are easy to implement.  相似文献   

8.
This paper investigates cyclical inventory replenishment for a company's regional distribution center that supplies, distributes, and manages inventory of carbon dioxide (CO2)(CO2) at over 900 separate customer sites in Indiana. The company previously experienced high labor costs with excessive overtime and maintained a regular back-log of customers experiencing stockouts. To address these issues we implemented a three-phase heuristic for the cyclical inventory routing problem encountered at one of the company's distribution centers. This heuristic determines regular routes for each of three available delivery vehicles over a 12-day delivery horizon while improving four primary performance measures: delivery labor cost, stockouts, delivery regularity, and driver–customer familiarity. It does so by first determining three sets of cities (one for each delivery vehicle) that must be delivered to each day based on customer requirements. Second, the heuristic assigns the remaining customers in other cities to one of the three “backbone routes” determined in phase 1. And third, it balances customer deliveries on each daily route over the schedule horizon. Through our methodology, we were able to significantly reduce overtime, driving time, and labor costs while improving customer service.  相似文献   

9.
This paper addresses a batch delivery single-machine scheduling problem in which jobs have an assignable common due window. Each job will incur an early (tardy) penalty if it is early (tardy) with respect to the common due window under a given schedule. There is no capacity limit on each delivery batch, and the cost per batch delivery is fixed and independent of the number of jobs in the batch. The objective is to find the optimal size and location of the window, the optimal dispatch date for each job, as well as an optimal job sequence to minimize a cost function based on earliness, tardiness, holding time, window location, window size, and batch delivery. We show that the problem can be optimally solved in O(n8)O(n8) time by a dynamic programming algorithm under a reasonable assumption on the relationships among the cost parameters. A computational experiment is also conducted to evaluate the performance of the proposed algorithm. We also show that some special cases of the problem can be optimally solved by lower order algorithms.  相似文献   

10.
11.
This study uses an empirical survey of middle-line managers in the US and Taiwan to study the association of supply chain management components and organizational performance. Through structural equation modeling, critical components of supply chain management are found to have considerable effects on organizational performance. The findings of the study are summarized as follows:
Supply chain competencies have positive effects on organizational performance in both the US and Taiwan. Supply chain competencies are developed around quality and service, operations and distribution, and design effectiveness. The goal of supply chain competencies is to satisfy customer requirements.  相似文献   

12.
We address a multi-echelon inventory system with one-warehouse and N  -retailers. The demand at each retailer is assumed to be known and satisfied by the warehouse. Shortages are not allowed and lead times are negligible. Costs at each facility consist of a fixed charge per order and a holding cost. The goal is to determine single-cycle policies which minimize the average cost per unit time, that is, the sum of the average holding and setup costs per unit time at the retailers and at the warehouse. We propose a O(NlogN)O(NlogN) heuristic procedure to compute efficient single-cycle policies. This heuristic is compared with other approaches proposed by Schwarz, Graves and Schwarz and Muckstadt and Roundy. We carry out a computational study to test the effectiveness of the heuristic and to compare the performance of the different procedures. From the computational results, it is shown that the new heuristic provides, on average, better single-cycle policies than those given by the Muckstadt and Roundy method.  相似文献   

13.
Supplier selection is a multi-criteria problem which includes both tangible and intangible factors. In these problems if suppliers have capacity or other different constraints two problems will exist: which suppliers are the best and how much should be purchased from each selected supplier? In this paper an integrated approach of analytic network process (ANP) and multi-objective mixed integer linear programming (MOMILP) is proposed to consider both tangible and intangible factors in choosing the best suppliers and define the optimum quantities among selected suppliers to maximize the total value of purchasing and minimize the budget and defect rate. The priorities are calculated for each supplier by using ANP. Four different plastic molding firms working with a refrigerator plant are evaluated according to 14 criteria that are involved in the four clusters: benefits, opportunities, costs and risks (BOCR). Also the priorities of suppliers will be used as the parameters of the first objective function. This multi-objective real-life problem was solved by using εε-constraint method and a reservation level driven Tchebycheff procedure. Finally, the most preferred nondominated solutions were determined by considering decision maker's (DM) preferences and the results obtained by these techniques are compared.  相似文献   

14.
Partnership selection has been important to the formation of a virtual enterprise. Based on the fuzzy preference programming (FPP) method proposed by Mikhailov [Fuzzy analytical approach to partnership selection in formation of virtual enterprises. Omega 2002;30:393–401], this investigation presents a consistent fuzzy preference relations method to select partners. Human thoughts are full of uncertainty, so the decision-makers cannot make exact pairwise comparisons. The FPP method solves this problem using an interval value instead of Saaty's 1–9 scale. In this study, the FPP method is reviewed, and then the consistent fuzzy preference relations method is elucidated. Finally, the presented method is applied to the example addressed by Mikhailov [Fuzzy analytical approach to partnership selection in formation of virtual enterprises. Omega 2002;30:393–401]. This study reveals that the proposed method yields consistent decision rankings from only n-1n-1 pairwise comparisons—the same number as in Mikhailov's research. Briefly, the presented consistent fuzzy preference relations method is an easy and practical way to provide rankings of partnership in making decision.  相似文献   

15.
16.
17.
18.
This article models flood occurrence probabilistically and its risk assessment. It incorporates atmospheric parameters to forecast rainfall in an area. This measure of precipitation, together with river and ground parameters, serve as parameters in the model to predict runoff and subsequently inundation depth of an area. The inundation depth acts as a guide for predicting flood proneness and associated hazard. The vulnerability owing to flood has been analyzed as social vulnerability ( V S ) , vulnerability to property ( V P ) , and vulnerability to the location in terms of awareness ( V A ) . The associated risk has been estimated for each area. The distribution of risk values can be used to classify every area into one of the six risk zones—namely, very low risk, low risk, moderately low risk, medium risk, high risk, and very high risk. The prioritization regarding preparedness, evacuation planning, or distribution of relief items should be guided by the range on the risk scale within which the area under study falls. The flood risk assessment model framework has been tested on a real‐life case study. The flood risk indices for each of the municipalities in the area under study have been calculated. The risk indices and hence the flood risk zone under which a municipality is expected to lie would alter every day. The appropriate authorities can then plan ahead in terms of preparedness to combat the impending flood situation in the most critical and vulnerable areas.  相似文献   

19.
20.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号