首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Scheduling a single semi-continuous batching machine   总被引:3,自引:0,他引:3  
Lixin Tang  Yufang Zhao   《Omega》2008,36(6):992
This paper addresses a new problem, called semi-continuous batch scheduling, which arises in the heating-operation of tube-billets in the steel industry. Each heating furnace can be regarded as a semi-continuous batching machine, which can handle up to C jobs simultaneously. The jobs in the same batch enter and leave the machine semi-continuously, which differs from the traditional batching machine scheduling where the jobs in same batch have a starting time and a finishing time. In this paper the processing time of a batch depends on the capacity of the semi-continuous batching machine, the longest processing time of jobs in the batch and its size. The objectives are to schedule jobs on the machine so that the makespan and the total completion time are minimized. A schedule for a semi-continuous batching machine consists of a batching and sequencing for the batches. We propose the optimal properties of two different objective functions and present the different dynamic programming algorithms with a running time of O(n2), respectively.  相似文献   

2.
《Omega》2005,33(5):399-405
This paper presents a preliminary analysis of the typical scheduling environment in semiconductor manufacturing involving multiple job families, and where more than one objective such as cycle time, machine utilization and the due-date accuracy needs to be simultaneously considered. In this study, the NP-hard problem of scheduling N independent jobs on a single testing machine with due dates and sequence-dependent setup times is addressed, where the multiple objectives are to minimize average cycle time, to minimize average tardiness, and to maximize machine utilization. A Pareto optimal solution, which is not inferior to any other feasible solutions in terms of all objectives, is generated combining the analytically optimal and conjunctive simulated scheduling approach. First, the machine-scheduling problem is modeled using the discrete event simulation approach and the problem is divided into simulation clock based lot selection sub-problems. Then, a Pareto optimal lot is selected using the compromise programming technique for multiobjective optimization at each decision instant in simulated time. With the help of a broad experimental design, this developed solution is then compared with common heuristic-dispatching rules such as SPT and EDD, which show better results for all the objectives over a wide range of problems. The developed scheduling method shows approximately 16.7% reduction in average cycle time, 25.6% reduction in average tardiness, and 21.6% improvement in machine utilization over the common dispatching rules, SPT and EDD.  相似文献   

3.
一种差异工件单机批调度问题的蚁群优化算法   总被引:5,自引:0,他引:5  
由于在利用蚁群算法构建差异工件(即工件有尺寸差异)单机批调度问题的解时,批的加工时间是不确定的.从而不能类似于经典调度问题的蚁群算法把批加工时间的倒数作为蚁群算法中的启发式信息,引入批的利用率和批的负载均衡率作为蚁群算法中的启发式信息,提出了JACO(ant colony optimization based a job sequence)和BACO(ant colony optimization based a batch sequence)两种蚁群优化算法.在算法JACO中,解的编码为工件序列,它对应着用BF(best fit)分批规则生成的调度方案,信息素代表工件间的排列顺序;在算法BACO中,解的编码为批序列,信息素代表工件间的批相关性,由此信息素通过中间信息素量来构造相应的解,并引入特定的局部优化策略,提高了算法的搜索效率.实验表明,与以往文献中的SA(simula-ted annealing)、GA(genetic algorithm)算法以及FFLPT(first-fit longest processing time)、BFLPT (best-fit longest processing time)启发式规则相比,算法JACO和BACO明显优于它们,且BACO算法比JACO算法效果更好.  相似文献   

4.
Single machine scheduling problems have been extensively studied in the literature under the assumption that all jobs have to be processed. However, in many practical cases, one may wish to reject the processing of some jobs in the shop, which results in a rejection cost. A solution for a scheduling problem with rejection is given by partitioning the jobs into a set of accepted and a set of rejected jobs, and by scheduling the set of accepted jobs among the machines. The quality of a solution is measured by two criteria: a scheduling criterion, F1, which is dependent on the completion times of the accepted jobs, and the total rejection cost, F2. Problems of scheduling with rejection have been previously studied, but usually within a narrow framework—focusing on one scheduling criterion at a time. This paper provides a robust unified bicriteria analysis of a large set of single machine problems sharing a common property, namely, all problems can be represented by or reduced to a scheduling problem with a scheduling criterion which includes positional penalties. Among these problems are the minimization of the makespan, the sum of completion times, the sum and variation of completion times, and the total earliness plus tardiness costs where the due dates are assignable. Four different problem variations for dealing with the two criteria are studied. The variation of minimizing F1+F2 is shown to be solvable in polynomial time, while all other three variations are shown to be $\mathcal{NP}$ -hard. For those hard problems we provide a pseudo polynomial time algorithm. An FPTAS for obtaining an approximate efficient schedule is provided as well. In addition, we present some interesting special cases which are solvable in polynomial time.  相似文献   

5.
This paper considers a variation of the classical single machine scheduling problem with tool changes. In the variation, two sets of jobs, namely special jobs and normal jobs, are considered. By special jobs, we mean that each special job must be processed within the first prefixed time units of a tool life. To solve the scheduling problem with small size and moderate size, we propose two mathematical programming models. To solve the scheduling problem with large size, we propose three sets of algorithms and focus on the performance of six algorithms based on the studies of a new bin packing problem. Worst-case analysis is conducted. Numerical experiment shows that each of the six algorithms can solve instances with up to 5000 jobs in about 0.5 s with an average relative error less than 4%.  相似文献   

6.
7.
In this paper we consider the scheduling problem with machine cost and rejection penalties. For this problem, we are given a sequence of independent jobs, each being characterized by its processing time (size) and its penalty. No machine is initially provided, and when a job is revealed the algorithm has the option to purchase new machines. Right when a new job arrives, we have the following choices: (i) reject it, in which case we pay its penalty; (ii) non-preemptively process it on an existing machine, which contributes to the machine load; (iii) purchase a new machine, and assign it to this machine. The objective is to minimize the sum of the makespan, the cost for purchasing machines, and the total penalty of all rejected jobs. For the small job case, (where all jobs have sizes no greater than the cost for purchasing one machine, and which is the generalization of the Ski-Rental Problem) we present an optimal online algorithm with a competitive ratio of 2.  相似文献   

8.
从聚类角度研究差异工件批调度这一组合优化问题.论证了差异工件的分批问题实质为一种广义聚类问题,为求解批调度问题提供了一个全新的途径.提出了批的空间浪费比的概念,将最小化批的总加工时间目标变换为最小化批的加权空间浪费比,从而可以更容易地寻找启发式信息指导分批过程,两者的等价性也在文中给出了证明.此外,以批的空间浪费比为基...  相似文献   

9.

We consider the problem of scheduling a set of jobs with different processing times and sizes on a single bounded parallel-batch machine with periodic maintenance. Because the machine is in batch-processing model and the capacity is fixed, several jobs can be processed simultaneously in a batch provided that the total size of the jobs in the batch doesn’t exceed the machine capacity. And the processing time of a batch is the largest processing time of the jobs contained in the batch. Meanwhile, the production of each batch is non-resumable, that is, if a batch cannot be completed processing before some maintenance, that batch needs to be processed anew once the machine returns available. Our goal is to minimize the makespan. We first consider two special cases where the jobs have the same sizes or the same processing times, both of which are strongly NP-hard. We present two different approximation algorithms for them and show that these two algorithms have the same tight worst-case ratio of 2. We then consider the general case where the jobs have the arbitrary processing times and arbitrary sizes, for which we propose a 17/5-approximation algorithm.

  相似文献   

10.
We study the multi-agent scheduling on a single machine with a fixed number of competing agents, in which, the objective function of each agent is either the number of tardy jobs or the makespan, and the goal of the problem is to minimize the weighted sum of agents’ objective functions. In the literature, the computational complexity of this problem was posed as open. By using enumerating, dynamic programming, and schedule-configuration, we show in this paper that the problem is solvable in polynomial time.  相似文献   

11.

This paper studies the single machine scheduling problem with availability constraints and optional job rejection. We consider the non-resumable and resumable variants, and show that the problems remain ordinary NP-hard, even with the rejection possibility extension, by presenting pseudo-polynomial dynamic-programming (DP) solutions. We also present an enhanced running time implementation of the algorithm of Kellerer and Strusevich (Algorithmica 57(4):769–795, 2010) for the resumable scenario without job rejection. This solution is adapted to efficiently solve the machine non-availability problem with a floating interval and the problem of two competing agents on a single machine, with and without optional job rejection. Numerical experiments support the efficiency of our DP implementation.

  相似文献   

12.
We consider a scheduling problem on two identical parallel machines, in which the jobs are moved between the machines by an uncapacitated transporter. In the processing preemption is allowed. The objective is to minimize the time by which all completed jobs are collected together on board the transporter. We identify the structural patterns of an optimal schedule and design an algorithm that either solves the problem to optimality or in the worst case behaves as a fully polynomial-time approximation scheme.  相似文献   

13.
The single machine scheduling with resource constraint is a nonlinear combinatorial optimization problem in cloud computing applications. Given a set of jobs and certain resource, the problem is to find a permutation of jobs and a distribution of resource to optimize certain objective function. The processing time of each job is a nonlinear function with respect to the resource assigned to it. In this paper, we propose a naive algorithm and study a subproblem in the algorithm that suppose the permutation of jobs is also given, how to find a resource distribution to minimize the total weighted flow time. We found a polynomial-time optimal solution for a special case and an approximation solution in general case.  相似文献   

14.
In this paper we study scheduling with release times and job rejection on two parallel machines. In our scheduling model each job is either accepted and then processed by one of the two machines at or after its release time, or it is rejected and then a rejection penalty is paid. The objective is to minimize the makespan of the accepted job plus the total penalty of all rejected jobs. The scheduling problem is NP-hard in the ordinary sense. In this paper, we develop a \(1.5+\epsilon \)-approximation algorithm for the problem, where \(\epsilon \) is any given small positive constant.  相似文献   

15.
In this paper, we investigate the semi-online scheduling problem with known maximum job size on two uniform machines with the speed ratio s≥1. The objective is to minimize the makespan. Two algorithms are presented, where the first is optimal for \(1\leq s\leq\sqrt{2}\), and the second is optimal for 1.559≤s≤2 and \(s\ge \frac{3+\sqrt{17}}{2}\). In addition, the improvement on lower bounds is made for \(2.  相似文献   

16.
Chai  Xing  Li  Wenhua  Yuan  Hang  Wang  Libo 《Journal of Combinatorial Optimization》2022,44(3):1900-1912
Journal of Combinatorial Optimization - This paper considers a class of problems with linear deteriorating jobs. Jobs are released over time and become known to the online scheduler until their...  相似文献   

17.
In this article, we consider the non-resumable case of the single machine scheduling problem with a fixed non-availability interval. We aim to minimize the makespan when every job has a positive tail. We propose a polynomial approximation algorithm with a worst-case performance ratio of 3/2 for this problem. We show that this bound is tight. We present a dynamic programming algorithm and we show that the problem has an FPTAS (Fully Polynomial Time Approximation Algorithm) by exploiting the well-known approach of Ibarra and Kim (J. ACM 22:463–468, 1975). Such an FPTAS is strongly polynomial. The obtained results outperform the previous polynomial approximation algorithms for this problem.  相似文献   

18.

This paper presents a genetic algorithm for a single machine-scheduling problem with the objective of minimizing total tardiness. Each job has its own due date and the set-up times are sequence dependent. The parameters of the genetic algorithm are determined by a statistical method. For small problems, the solutions given by the proposed method are compared with solutions provided by a commercial package, and for larger problems, with those obtained by a heuristic proposed in the literature.  相似文献   

19.
20.
Samuel Eilon 《Omega》1985,13(5):453-468
When several products are processed one at a time on a single machine, the conventional approach of computing the economic batch quantity for each product cannot apply. An example for six products is considered, where the total production capacity on regular time is inadequate, so that overtime has to be used at an extra cost. A simple method is described for solving this problem when each product is produced once during a production cycle, the objective being to minimize the total set-up and holding costs per day. Schedules which involve batch splitting can reduce these costs further, and a guideline is proposed for the construction of sub-cycles. The results compare favourably with lower bounds computed for the purpose.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号