首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Recent studies have shown that using variable sampling size and control limits (VSSC) schemes result in charts with more statistical power than variable sampling size (VSS) when detecting small to moderate shifts in the process mean vector. This paper presents an economic-statistical design (ESD) of the VSSC T2 control chart using the general model of Lorenzen and Vance [22]. The genetic algorithm approach is then employed to search for the optimal values of the six test parameters of the chart. We then compare the expected cost per unit of time of the optimally designed VSSC chart with optimally designed VSS and FRS (fixed ratio sampling) T2 charts as well as MEWMA charts.  相似文献   

2.
This study investigates the statistical properties of the adaptive Hotelling's T 2 charts with run rules in which the sample size and sampling interval are allowed to vary according on the current and past sampling points. The adaptive charts include variable sample size (VSS), variable sampling interval (VSI), and variable sample size and sampling interval (VSSI) charts. The adaptive Hotelling's T 2 charts with run rules are compared with the fixed sampling rate Hotelling's T 2 chart with run rules. The numerical results show that the VSS, VSI, and VSSI features improve the performance of the Hotelling's T 2 chart with run rules.  相似文献   

3.
An economic statistical design model for a T2 chart which uses a variable sample size (VSS) feature is developed in this article. This study mainly differs from the others conducted in the field. In that a new approach is offered to achieve closed form of some statistical criteria. In other words, the proposed formulas can be considered as a better alternative approach in designing the VSS control charts in terms of simplicity and yet providing the users with better optimal solutions.  相似文献   

4.
Hotelling’s T2 control chart with double warning lines   总被引:1,自引:1,他引:0  
Recent studies have shown that the T 2 control chart with variable sampling intervals (VSI) and/or variable sample sizes (VSS) detects process shifts faster than the traditional T 2 chart. This article extends these studies for processes that are monitored with VSI and VSS using double warning lines (T 2 —DWL). It is assumed that the length of time the process remains in control has exponential distribution. The properties of T 2 —DWL chart are obtained using Markov chains. The results show that the T 2 —DWL chart is quicker than VSI and/or VSS charts in detecting almost all shifts in the process mean.  相似文献   

5.
The design parameters of the economic and economic statistical designs of control charts depend on the distribution of process failure mechanism or shock model. So far, only a small number of failure distributions, such as exponential, gamma, and Weibull with fixed or increasing hazard rates, have been used as a shock model in the economic and economic statistical designs of the Hotelling T2 control charts. Due to both theoretical and practical aspects, the lifetime of the process under study may not follow a distribution with fixed or increasing hazard rate. A proper alternative for this situation may be the Burr distribution, in which the hazard rate can be fixed, increasing, decreasing, single mode, or even U-shaped. In this research article, economic and economic statistical designs of the Hotelling T2 control charts under the Burr XII shock models under two uniform and non uniform sampling schemes were proposed, constructed, and compared. The obtained design models were implemented by a numerical example, and a sensitivity analysis was conducted to evaluate the effect of changing parameters of shock model distribution on the optimum values of the proposed design models. The results showed that first the proposed designs under non uniform sampling scheme perform better and second the optimum values of the designs are not significantly sensitive to changing of the Burr XII distribution parameters. We showed that the obtained design models are also true for the beta Burr XII shock model.  相似文献   

6.
Recent studies have shown that the adaptive T2 chart with two different sampling interval and three sample sizes (SVSSI) shows a good performance in detecting small to large shifts in the process mean. This paper investigates the economic and economic statistical designs of the SVSSI T2 charts. We use the Markov chain approach to developing the cost model proposed by Costa and Rahim (Journal of applied statistics 2001; 28: 875–885). A genetic algorithm approach is used to find the optimal solutions. Using numerical examples, we illustrate the performance of the proposed model and compare the statistical, economic, and economic statistical designs of the SVSSI T2 chart with respect to the economic and statistical criteria. Furthermore, we compare the performance of the SVSSI T2 chart with the other T2 control schemes.  相似文献   

7.
Abstract

An economic-statistical design of the synthetic double sampling (synDS) T2 chart is presented in this study. The cost function is minimized to obtain the optimal design parameters of the synDS T2 chart by incorporating the statistical constraints or the constraints on the average number of samples. An example is provided and a sensitivity analysis is conducted to study the effect of model parameters on the optimal solution of the design. The numerical comparison shows that the synDS T2 chart performs better than the synthetic T2 chart and the multivariate exponentially weighted moving average chart, in terms of the cost.  相似文献   

8.
Research has shown that applying the T2 control chart by using a variable parameters (VP) scheme yields rapid detection of out-of-control states. In this paper, the problem of economic statistical design of the VP T2control chart is considered as a double-objective minimization problem with the statistical objective being the adjusted average time to signal and the economic objective being expected cost per hour. We then find the Pareto-optimal designs in which the two objectives are met simultaneously by using a multi-objective genetic algorithm. Through an illustrative example, we show that relatively large benefits can be achieved by applying the VP scheme when compared with usual schemes, and in addition, the multi-objective approach provides the user with designs that are flexible and adaptive.  相似文献   

9.
In this article, a multivariate synthetic control chart is developed for monitoring the mean vector of a normally distributed process. The proposed chart is a combination of the Hotelling's T 2 chart and Conforming Run Length chart. The operation, design, and performance of the chart are described. Average run length comparisons between some other existing control charts and the synthetic T 2 chart are presented. They indicate that the synthetic T 2 chart outperforms Hotelling's T 2 chart and T 2 chart with supplementary runs rules.  相似文献   

10.
One of the objectives of research in statistical process control is to obtain control charts that show few false alarms but, at the same time, are able to detect quickly the shifts in the distribution of the quality variables employed to monitor a productive process. In this article, the synthetic-T 2 control chart is developed, which consists of the simultaneous use of a CRL chart and a Hotelling's T 2 control chart. The ARL is calculated employing Markov chains for steady and zero-state scenarios. A procedure of optimization has been developed to obtain the optimum parameters of the synthetic-T 2, for zero and steady cases, given the values of in-control ARL and magnitude of shift which needs to be detected rapidly. A comparison between (standard T 2, MEWMA, T 2 with variable sample size, and T 2 with double sampling) charts reveals that the synthetic-T 2 chart always performs better than the standard T 2 chart. The comparison with the remaining charts demonstrate in which cases the performance of this new chart makes it interesting to employ in real applications.  相似文献   

11.
ABSTRACT

Recently, researchers have tried to design the T2 chart economically to achieve the minimum possible quality cost; however, when T2 chart is designed, it is important to consider multiple scenarios. This research presents the robust economic designs of the T2 chart where there is more than one scenario. An illustrative example is used to demonstrate the effect of the model parameters on the optimal designs. The genetic algorithm optimization method is employed to obtain the optimal designs. Simulation studies show that the robust economic designs of T2 chart are more effective than traditional economic design in practice.  相似文献   

12.
Control charts have been used effectively for years to monitor processes and detect abnormal behaviors. However, most control charts require a specific distribution to establish their control limits. The bootstrap method is a nonparametric technique that does not rely on the assumption of a parametric distribution of the observed data. Although the bootstrap technique has been used to develop univariate control charts to monitor a single process, no effort has been made to integrate the effectiveness of the bootstrap technique with multivariate control charts. In the present study, we propose a bootstrap-based multivariate T 2 control chart that can efficiently monitor a process when the distribution of observed data is nonnormal or unknown. A simulation study was conducted to evaluate the performance of the proposed control chart and compare it with a traditional Hotelling's T 2 control chart and the kernel density estimation (KDE)-based T 2 control chart. The results showed that the proposed chart performed better than the traditional T 2 control chart and performed comparably with the KDE-based T 2 control chart. Furthermore, we present a case study to demonstrate the applicability of the proposed control chart to real situations.  相似文献   

13.
In this paper, a multivariate Bayesian variable sampling interval (VSI) control chart for the economic design and optimization of statistical parameters is designed. Based on the VSI sampling strategy of a multivariate Bayesian control chart with dual control limits, the optimal expected cost function is constructed. The proposed model allows the determination of the scheme parameters that minimize the expected cost per time of the process. The effectiveness of the Bayesian VSI chart is estimated through economic comparisons with the Bayesian fixed sampling interval and the Hotelling's T2 chart. This study is an in-depth study on a Bayesian multivariate control chart with variable parameter. Furthermore, it is shown that significant cost improvement may be realized through the new model.  相似文献   

14.
Since multi-attribute control charts have received little attention compared with multivariate variable control charts, this research is concerned with developing a new methodology to employ the multivariate exponentially weighted moving average (MEWMA) charts for m-attribute binomial processes; the attributes being the number of nonconforming items. Moreover, since the variable sample size and sampling interval (VSSI) MEWMA charts detect small process mean shifts faster than the traditional MEWMA, an economic design of the VSSI MEWMA chart is proposed to obtain the optimum design parameters of the chart. The sample size, the sampling interval, and the warning/action limit coefficients are obtained using a genetic algorithm such that the expected total cost per hour is minimized. At the end, a sensitivity analysis has been carried out to investigate the effects of the cost and the model parameters on the solution of the economic design of the VSSI MEWMA chart.  相似文献   

15.
This article performs a sensitivity analyses of the synthetic T2 chart using fractional factorial design, which integrates the interaction effects. We are interested in the effects of the input parameters on the optimal cost, chart's parameters, and average run lengths. We also look at the input parameters responsible for the increase in cost and improvement in statistical performance under statistical constraints, and investigate how the input parameters influence the binding effect of the statistical constraints. The sensitivity analyses of the synthetic T2 chart are compared with that of the Hotelling's T2 chart, and parameters responsible for the cost advantage of the synthetic T2 chart are identified.  相似文献   

16.
ABSTRACT

We present an alternative sampling scheme for the Hotelling's T2 control chart with variable parameters (VP T2) which allows the sampling interval h, the sample size n, and control limit k to vary between minimum and maximum values while keeping the warning line fixed over time. Our method uses only one measurement scale to overcome the difficulties of using two scales in practice. Later, we demonstrate the merits of the method in terms of its performance in detecting small-to-moderate shifts and its ease of application.  相似文献   

17.
In the past decade, different robust estimators have been proposed by several researchers to improve the ability to detect non-random patterns such as trend, process mean shift, and outliers in multivariate control charts. However, the use of the sample mean vector and the mean square successive difference matrix in the T 2 control chart is sensitive in detecting process mean shift or trend but less sensitive in detecting outliers. On the other hand, the minimum volume ellipsoid (MVE) estimators in the T 2 control chart are sensitive in detecting multiple outliers but less sensitive in detecting trend or process mean shift. Therefore, new robust estimators using both merits of the mean square successive difference matrix and the MVE estimators are developed to modify Hotelling's T 2 control chart. To compare the detection performance among various control charts, a simulation approach for establishing control limits and calculating signal probabilities is provided as well. Our simulation results show that a multivariate control chart using the new robust estimators can achieve a well-balanced sensitivity in detecting the above-mentioned non-random patterns. Finally, three numerical examples further demonstrate the usefulness of our new robust estimators.  相似文献   

18.
ABSTRACT

Economic statistical designs aim at minimizing the cost of process monitoring when a specific scenario or a set of estimated process and cost parameters is given. But, in practice the process may be affected by more than one scenario which may lead to severe cost penalties if the wrong design is used. Here, we investigate the robust economic statistical design (RESD) of the T2 chart in an attempt to reduce these cost penalties when there are multiple scenarios. Our method is to employ the genetic algorithm (GA) optimization method to minimize the total expected monitoring cost across all distinct scenarios. We illustrate the effectiveness of the method using two numerical examples. Simulation studies indicate that robust economic statistical designs should be encouraged in practice.  相似文献   

19.
We propose new multivariate control charts that can effectively deal with massive amounts of complex data through their integration with classification algorithms. We call the proposed control chart the ‘Probability of Class (PoC) chart’ because the values of PoC, obtained from classification algorithms, are used as monitoring statistics. The control limits of PoC charts are established and adjusted by the bootstrap method. Experimental results with simulated and real data showed that PoC charts outperform Hotelling's T 2 control charts. Further, a simulation study revealed that a small proportion of out-of-control observations are sufficient for PoC charts to achieve the desired performance.  相似文献   

20.
The T 2 control chart is widely adopted in multivariate statistical process control. However, when dealing with asymmetrical or multimodal distributions using the traditional T 2 control chart, some points with relatively high occurrence possibility might be excluded, while some points with relatively low occurrence possibility might be accepted. Motived by the thought of the highest posterior density credible region, we develop a control chart based on the highest possibility region to solve this problem. It is shown that the proposed multivariate control chart will not only meet the false alarm requirement, but also ensure that all the in-control points are with relatively high occurrence possibility. The advantages and effectiveness of the proposed control chart are demonstrated by some numerical examples in the end.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号