首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 172 毫秒
1.
Assessing the quality of decisions while selecting project portfolios becomes an inherent part of the decision-making process when the project parameters are inaccurate or uncertain. Small adjustments to the initial parameters can lead to situations where the preferred portfolio no longer reflects the investor’s requirements. The paper studies the post-optimal analysis of the Pareto optimal portfolios chosen by Savage’s risk criteria. Stability characteristic, such as the stability function, is considered. Using the stability function, we evaluate the quality of feasible portfolios. This function indicates the robustness of portfolios to any changes in the initial data. Using the stability function the formula for calculating the optimality threshold is obtained, which determines the level of risk reduction when the selected Pareto optimal portfolio can obtain optimal properties. The performances of the stability function and the optimality threshold are shown in the case study using global risk assessments for projects participating in the Belt and Road Initiative. The computation results demonstrate the ability through the stability function to evaluate the quality and optimal properties of feasible project portfolios.  相似文献   

2.
首先,本文在已有可打断项目组合选择模型的基础上,引入了消耗性资源和可更新资源约束,构建了一个更符合实际的新模型;其次,为了达到模型简化的目的,本文给出了资金约束的现值表示,并给出了理论证明;最后,利用GAMS对模型进行了算例分析。数值实验结果表明:1)资源约束下的项目打断有时可以给企业带来积极效益,这有别于已有的研究;2)在考虑资源约束的情况下,资源消耗少且同时收益高的项目应优先执行;3)当资源的供给量较少时,资源约束是决定项目选择的关键因素。此外,通过企业实际的案例对数值实验结果进行了验证。  相似文献   

3.
对于以项目方式进行管理或生产的企业来说,共享资源在多项目、特别是项目组合(project portfolio,PP)中的合理配置是企业运营所需要解决的重要问题,对企业实现可持续发展起着关键的支撑作用。本文将突变理论引入项目组合管理问题中,在类比交通系统中车辆对交通资源竞争的基础上,提出了项目组合系统共享资源竞争拥挤概念,并对其基础变量进行了详细分析;其次,本文分析了项目组合共享资源竞争拥挤势函数和竞争稳定性,构建了以系统效率最大化为决策目标的项目组合共享资源竞争拥挤模型;最后,通过HD集团的案例分析对项目组合共享资源竞争拥挤模型的可实践性进行了验证,并以此为基础,针对项目组合管理提出了共享资源的改进管理方案。  相似文献   

4.
Product development occurs in multiproject environments where preemption is often allowed so that critical projects can be addressed immediately. Because product development is characterized by time-based competition, there is pressure to make decisions quickly using heuristics methods that yield fast project completion. Preemption heuristics are needed both to choose activities for preemption and then to determine which resources to use to restart preempted activities. Past research involving preemption has ignored any completion time penalty due to the forgetting experienced by project personnel during preemption and the resulting relearning time required to regain lost proficiency. The purpose of this research is to determine the impact of learning, forgetting, and relearning (LFR) on project completion time when preemption is allowed. We present a model for the LFR cycle in multiproject development environments. We test a number of priority rules for activity scheduling, activity preemption, and resource assignment subsequent to preemption, subject to the existence of the LFR cycle, for which a single type of knowledge worker resource is assigned among multiple projects. The results of the simulation experiments clearly demonstrate that LFR effects are significant. The tests of different scheduling, preemption, and resource reassignment rules show that the choice of rule is crucial in mitigating the completion time penalty effects of the LFR cycle, while maintaining high levels of resource utilization. Specifically, the worst performing rules tested for each performance measure are those that attempt to maintain high resource utilization. The best performing rules are based on activity criticality and resource learning.  相似文献   

5.
Making R&D portfolio decision is difficult, because long lead times of R&D and market and technology dynamics lead to unavailable and unreliable collected data for portfolio management. The objective of this research is to develop a fuzzy R&D portfolio selection model to hedge against the R&D uncertainty. Fuzzy set theory is applied to model uncertain and flexible project information. Since traditional project valuation methods often underestimate the risky project, a fuzzy compound-options model is used to evaluate the value of each R&D project. The R&D portfolio selection problem is formulated as a fuzzy zero–one integer programming model that can handle both uncertain and flexible parameters to determine the optimal project portfolio. A new transformation method based on qualitative possibility theory is developed to convert the fuzzy portfolio selection model into a crisp mathematical model from the risk-averse perspective. The transformed model can be solved by an optimization technique. An example is used to illustrate the proposed approach. We conclude that the proposed approach can assist decision makers in selecting suitable R&D portfolios, while there is a lack of reliable project information.  相似文献   

6.
Large firms face a conflict in managing a portfolio of high-risk projects. When an ongoing project is thought to have a low likelihood of success, project team members take risks to improve its chances of success. However, upper-level managers who allocate resources tend to withhold resources from a project with a low likelihood of success in favor of others in the portfolio that look more promising. Because this paucity of resources influences project team members to avoid risk, the total effect of success likelihood on risk taking is conflicted. The influence on risk taking of a project's terminal value—defined as the value that remains in the firm in the event of project failure—is unequivocally positive, because both senior management resource allocation and project team risk-taking propensity are encouraged by terminal value. Thus, firms can override the ambivalent effect of likelihood of success on project decision making by focusing attention on a project's terminal value.  相似文献   

7.
This research focuses on the project structure used by coopetitors to achieve common innovation projects. Scholars have recently identified an original but complex project structure that they call the Coopetitive Project Team (CPT). However, other project structures can also be implemented by coopetitors to achieve innovation. Therefore, we address the following question: for which types of innovation projects is CPT appropriate? We argue that coopetitors need to use CPT for high-risk and high-cost projects when the aim is to develop radical innovation. CPT allows coopetitors not only to develop innovation capabilities through close resource and knowledge sharing but also to manage the risk of opportunism. Conversely, coopetitors should use another project structure, Separated Project Teams (SPTs), for low-cost and low-risk projects when the aim is to develop incremental innovation. The SPT design allows coopetitors both to achieve the goal of the project and to minimize the risk of opportunism. To confirm our assumptions, we studied the project portfolios of Airbus and Thales, two firms in the space satellite industry. Our findings confirm that coopetitors should implement CPTs to handle innovation projects that are costly, risky and highly innovative. CPTs permit the sharing of knowledge and the management of high opportunism risk, both of which are necessary to achieve radical innovation. Conversely, coopetitors rely on SPTs for low-cost projects that require a low degree of knowledge sharing, thus avoiding the risk of opportunism in achieving their incremental innovation objectives.  相似文献   

8.
许多现有的项目组合模型都认为项目集合可以在固定的计划期完成,但是在实际的项目执行过程中,决策者为了使得高收益的项目纳入项目集合中或者放弃风险高的项目来释放更多的资金,会选择对项目组合固定的计划期进行灵活性调整。同时,考虑到项目未来价值的不确定性,本文利用实物期权的二叉树模型给出了价值波动的公式,进而建立了同时受弹性时间段和价值波动影响的项目组合选择的新模型,对传统的计算项目价值的净现值法进行补充。通过GAMS/BARON对算例进行求解,验证了模型的合理性和有效性。结果表明:考虑弹性时间段和价值波动的影响会给更符合企业长期的发展战略,给企业带来更大的收益,该模型也为处理不确定情况下的项目组合问题提供了新思路和新方法。  相似文献   

9.
We propose a systematic approach that incorporates fuzzy set theory in conjunction with portfolio matrices to assist managers in reaching a better understanding of the overall competitiveness of their business portfolios. Integer linear programming is also accommodated in the proposed integrated approach to help select strategic plans by using the results derived from the previous portfolio analysis and other financial data. The proposed integrated approach is designed from a strategy‐oriented perspective for portfolio management at the corporate level. It has the advantage of dealing with the uncertainty problem of decision makers in doing evaluation, providing a technique that presents the diversity of confidence and optimism levels of decision makers. Furthermore, integer linear programming is used because it offers an effective quantitative method for managers to allocate constrained resources optimally among proposed strategies. An illustration from a real‐world situation demonstrates the integrated approach. Although a particular portfolio matrix model has been adopted in our research, the procedure proposed here can be modified to incorporate other portfolio matrices.  相似文献   

10.
实践中,企业并行实施地域上分散的多个项目时,资源在各子项目之间的转移时间是影响多项目整体进度的关键因素,同时在动态多项目环境下,新项目不断到达且到达时间不可预知使得制定多项目调度计划遭遇更大困难。本文在动态环境下对资源转移时间型分布式多项目调度问题进行建模和求解,基于多代理系统建立分布式多项目调度问题的动态模型,并将拍卖理论引入其中,设计一种基于时间窗拍卖机制的分布式多代理系统(DMAS/ATW),在动态环境和资源转移时间约束下为多项目配置全局资源。通过一个具体的分布式多项目示例详细分析DMAS/ATW算法的动态调度过程,并基于MPSPLIB中的分布式多项目算例开展数值实验。实验结果表明:无资源转移时间约束时,DMAS/ATW算法求得的平均项目延迟同比相关文献中的DMAS/RIA算法最多减少42%,平均减少26%;有资源转移时间约束时,DMAS/ATW算法对1/3算例集的求解结果优于DMAS/RIA算法在无资源转移时间约束时的结果,验证了本文DMAS/ATW算法求解效果的优异性。对算例规模和全局资源利用系数的实验分析还表明,DMAS/ATW算法对不同规模和资源约束紧张程度的算例都具有良好的适应性。  相似文献   

11.
项目组合包含多项目且项目间存在相互作用和依赖关系,针对传统项目组合评价方法忽略了各项目间依赖关系的不足,本文采用复杂网络理论和PageRank算法,提出一种新的项目优先级排序方法(PPRM)。首先,本文建立研发项目多属性评价准则,分析了项目间的支配关系以及技术和经验在项目间的扩散关系。然后,以项目为节点、以支配和扩散关系为边,分别构建了项目支配和扩散网络,进一步,采用设计结构矩阵(DSM)和K-shell方法建立了基于支配网络的项目影响力模型,并建立了考虑项目之间多次扩散传播的综合扩散概率模型。综合项目节点影响力和扩散关系,本文构建了基于PageRank算法的研发项目优先级排序模型。最后,以某研发项目组合选择为例,验证了本文所建立的模型和算法可有效分析项目组合中的排序问题。  相似文献   

12.
We develop a dynamic prioritization policy to optimally allocate a scarce resource among K projects, only one of which can be worked on at a time. When the projects' delay costs differ, the problem (a “restless bandit”) has not been solved in general. We consider the policy of working on the project with the highest expected delay loss as if the other project was completely finished first (although recourse is allowed). This policy is optimal if: (1) the delay cost increases with the delay regardless of the performance state, (2) costs are not discounted (or, discounting is dominated by delay costs), (3) projects are not abandoned based on their performance state during processing at the scarce resource, and (4) there are no stochastic delays. These assumptions are often fulfilled for processing at specialized resources, such as tests or one‐off analyses.  相似文献   

13.
In this paper, we consider the basic problem of portfolio construction in financial engineering, and analyze how market-based and analytical approaches can be combined to obtain efficient portfolios. As a first step in our analysis, we model the asset returns as a random variable distributed according to a mixture of normal random variables. We then discuss how to construct portfolios that minimize the Conditional Value-at-Risk (CVaR) under this probabilistic model via a convex program. We also construct a second-order cone representable approximation of the CVaR under the mixture model, and demonstrate its theoretical and empirical accuracy. Furthermore, we incorporate the market equilibrium information into this procedure through the well-known Black-Litterman approach via an inverse optimization framework by utilizing the proposed approximation. Our computational experiments on a real dataset show that this approach with an emphasis on the market equilibrium typically yields less risky portfolios than a purely market-based portfolio while producing similar returns on average.  相似文献   

14.
The expected geometric mean has been shown to be a valuable criterion in ranking portfolios of assets. For example, under certain conditions the maximum expected geometric-mean portfolio minimizes the expected time to amass a fixed level of wealth as wealth becomes “large.” This paper develops a simple algorithm for obtaining such portfolios when portfolio returns are assumed to be lognormally distributed. The risk-return characteristics of portfolios are derived and illustrated using data from a subset of stocks found on the New York Stock Exchange.  相似文献   

15.
In course of the recent turmoil in the financial markets, several open-end real estate funds froze redemption of their units, resulting in unanticipated and unprecedented liquidity and performance shocks for investors. Against this background, we analyze the long- and short-term risk and return profiles of open-end real estate funds and their role in efficient multi-asset retirement portfolios. To this end, we introduce the Retirement Efficient Frontier, describing those investment strategies that minimize the lifetime probability of ruin for specific levels of periodic withdrawals from a given retirement wealth. We find that for low to moderate periodic withdrawals, efficient portfolios consist of up to 85% real estate fund investments in case fund units are continuously redeemable. Moreover we show that even if there is a monthly probability of 2.5% that redemption of fund units is temporarily suspended, the allocation into real estate funds in risk-efficient portfolios is only slightly affected. Yet, if funds additionally face a high risk of having to depreciate their property portfolio during a liquidity crisis, their share in efficient retirement portfolios is reduced significantly.  相似文献   

16.
多项目环境下新产品研发项目资源分配问题研究   总被引:7,自引:0,他引:7  
在对国内外相关文献进行评述的基础上,针对多项目环境下新产品研发项目的资源分配问题,将新产品研发多项目资源分配转换为一个多队列排队问题,建立了一个仿真模型,并以三个并行新产品研发项目为例,通过GPSS系统仿真得出了新产品研发项目的完工时间和资源分布结果并进行了分析。  相似文献   

17.
《决策科学》2017,48(1):176-199
We consider the problem of balancing the penalties associated with budgetary slack (being underbudget) and cost overruns in the project portfolio selection problem by addressing randomness in project costs and making individual project budgets decision variables. Setting the budget for a single project is shown to be analogous to the newsvendor problem. For related versions of the project portfolio selection problem we provide optimal and heuristic procedures. Numerical experiments are used to test the procedures and provide managerial guidelines. We show project budgets should be set so that each project in the portfolio has the same probability of running over budget, it is better to have a larger number of projects with less than ideal funding compared to a smaller number of projects with ideal funding, and substantial opportunities to select more projects with a higher expected profit are available if an aggregate portfolio budget is used.  相似文献   

18.
The methods presented in this article are based on the qualitative and quantitative analysis of close-out data drawn from a portfolio of 38 modification projects. The primary premise is that modification projects are intrinsically subject to quantity and complexity growth during the course of detailed engineering as a consequence of the indeterminate interface with the existing facility. The normative project control routines need to be supplemented by material take-offs-based weight monitoring as a basis for re-estimation and re-calibration of the project baselines as detailed engineering proceeds in order to mitigate this uncertainty as early as possible. Similarly, estimating needs to be based on norms drawn from performance measurement of modification work rather than extrapolations from greenfield projects, particularly the work performed on the platforms. This article presents a portfolio of project control methods based on the performance measurement principle covering the short term of single projects as well as the longer term multi-project perspective.  相似文献   

19.
Alliance portfolios enable firms to access and integrate multiple resources from different, simultaneous partners. We assess the extent to which alliance portfolio coordination benefits focal firms along three alliance portfolio characteristics: alliance portfolio size, the complementarity of the resources available through the portfolio, and the degree to which relation-specific investments are made across the portfolio. Based on a questionnaire completed by 444 Dutch companies, we found that the three portfolio characteristics play an important role in creating benefits for focal firms through their portfolios. Additionally, our findings suggest that alliance portfolio coordination is an important element in dealing with the challenge of managing portfolios, in that it shapes the effect of the other portfolio characteristics.  相似文献   

20.
Speed is an increasingly important determinant of which suppliers will be given customers' business and is defined as the time between when an order is placed by the customer and when the product is delivered, or as the amount of time customers must wait before they receive their desired service. In either case, the speed a customer experiences can be enhanced by giving priority to that particular customer. Such a prioritization scheme will necessarily reduce the speed experienced by lower‐priority customers, but this can lead to a better outcome when different customers place different values on speed. We model a single resource (e.g., a manufacturer) that processes jobs from customers who have heterogeneous waiting costs. We analyze the price that maximizes priority revenue for the resource owner (i.e., supplier, manufacturer) under different assumptions regarding customer behavior. We discover that a revenue‐maximizing supplier facing self‐interested customers (i.e., those that independently minimize their own expected costs) charges a price that also minimizes the expected total delay costs across all customers and that this outcome does not result when customers coordinate to submit priority orders at a level that seeks to minimize their aggregate costs of priority fees and delays. Thus, the customers are better off collectively (as is the supplier) when the supplier and customers act independently in their own best interests. Finally, as the number of priority classes increases, both the priority revenues and the overall customer delay costs improve, but at a decreasing rate.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号