首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   234篇
  免费   8篇
管理学   66篇
人口学   20篇
理论方法论   6篇
综合类   5篇
社会学   89篇
统计学   56篇
  2023年   3篇
  2022年   7篇
  2021年   1篇
  2020年   3篇
  2019年   11篇
  2018年   15篇
  2017年   24篇
  2016年   16篇
  2015年   6篇
  2014年   10篇
  2013年   26篇
  2012年   16篇
  2011年   11篇
  2010年   13篇
  2009年   8篇
  2008年   13篇
  2007年   12篇
  2006年   13篇
  2005年   5篇
  2004年   7篇
  2003年   7篇
  2002年   6篇
  2001年   6篇
  2000年   1篇
  1998年   1篇
  1996年   1篇
排序方式: 共有242条查询结果,搜索用时 15 毫秒
241.
Every production planning concept that incorporates controlled order release will initially withhold jobs from the shop floor and create a pre‐shop pool. Order release is a key component of the Workload Control concept that aims to maintain work‐in‐process within limits while ensuring due dates are met. Order release includes two decisions: (i) a sequencing decision that establishes the order in which jobs are considered for release; and, (ii) a selection decision that determines the criteria for choosing jobs for release. While selection has received much research attention, sequencing has been largely neglected. Using simulation, this study uncovers the potential for performance improvement in the sequencing decision and improves our understanding of how order release methods should be designed. Although most prior studies apply time‐oriented sequencing rules and load‐oriented selection rules, analysis reveals that load balancing considerations should also be incorporated in the sequencing decision. But an exclusive focus on load balancing is shown to increase mean tardiness and, paradoxically, require high workloads. A new sequencing rule is developed that only balances loads when multiple orders become urgent. It avoids high mean tardiness and allows the shop to operate at a low workload level. At the same time, the percentage tardy is reduced by up to 50% compared to a purely time‐oriented rule. The findings have implications not only for Workload Control but for any concept that features order release control, such as ConWIP and Drum‐Buffer‐Rope.  相似文献   
242.
A lead time that is short, predictable, and reliable is an increasingly important criterion in supplier selection. Although many companies may achieve this through lean implementation, high‐variety manufacturers, for example, small and medium‐sized make‐to‐order companies, have found that lean's planning and control techniques do not apply. This article outlines a planning and control concept known as workload control (WLC) that integrates customer enquiry management, including a due‐date setting rule, with order release control. Simulation is then used to assess its impact on shop performance. Results demonstrate that an integrated WLC concept can reduce the percentage of tardy jobs—so short lead times can be realistically quoted—while also reducing and stabilizing workloads. WLC can level demand and production over time when work is not standardized and it is not possible to synchronize flows on the shop floor. Results are shown to be robust to changes in routing characteristics, the mix of orders with due dates specified by the customer and proposed internally, and the strike rate (or order‐winning probability). Hence, an integrated approach to WLC represents an important step toward achieving lean in make‐to‐order companies.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号