首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   30篇
  免费   1篇
管理学   4篇
社会学   7篇
统计学   20篇
  2023年   2篇
  2022年   1篇
  2021年   2篇
  2019年   5篇
  2018年   2篇
  2017年   3篇
  2016年   1篇
  2015年   4篇
  2014年   1篇
  2013年   7篇
  2011年   1篇
  2007年   1篇
  1990年   1篇
排序方式: 共有31条查询结果,搜索用时 31 毫秒
31.
The audit staff planning problem, a specific type of manpower planning problem, has been modeled using goal programming and, more recently, multiple objective linear programming. Prior studies developed single-period models and did not go beyond the model building stage. This study develops a multiperiod audit staff planning model and evaluates the model using a test application involving actual decision makers (partners in public accounting firms). The multiperiod model includes seven objectives to be optimized: profit (to be maximized), late completion of work, work declined, staff augmentation, staff reduction, underutilization of the work force, and shortfall in meeting professional development targets (all to be minimized). Over a four-quarter planning horizon with one “busy season,” the model is subject to constraints with respect to the projected audit work load, ability to substitute personnel and to perform interim audit work, available staff hours (including overtime limitations), supervisory requirements, and professional development targets. Results of the test application showed that the model was capable of producing a range of values for each objective. The participants were exposed to much of that range when making their decisions. The results also showed that all objectives were important and that participants were consistent in choosing their preferred level of each objective over several runs of the model. These results and the reactions of the participants demonstrate that the model is usable by actual decision makers and has potential for a number of specific applications.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号