首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   13篇
  免费   0篇
管理学   4篇
社会学   9篇
  2019年   1篇
  2018年   1篇
  2013年   1篇
  2007年   1篇
  2006年   1篇
  2004年   1篇
  2003年   1篇
  2001年   2篇
  1988年   1篇
  1984年   1篇
  1975年   1篇
  1973年   1篇
排序方式: 共有13条查询结果,搜索用时 62 毫秒
11.
12.
13.
The problem of sequencing jobs on a machine in a job shop has been approached by a number of researchers and practitioners. One of the most popular methods is to apply a priority rule to the queue at each machine. The authors have previously published details of an approach which sets the priority of a job as a linear combination of the operation times and due date for that job. The coefficients in the linear combination are set by a simulation and search procedure so as to give good performance based on the performance measure specified. This paper extends this approach to include setup time factors. This extended approach is then applied to data from an actual manufacturing system. The extended approach is shown to improve the performance of the manufacturing system in relation to existing techniques.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号