478.
An experiment is discussed in which three computer-aided, interactive job shop scheduling approaches are compared using an interactive job shop scheduling simulator (JOB) developed for the project. All three approaches use a combination of computer and human capabilities to develop job shop schedules, but differ in terms of the timing and degree of human involvement required. The three scheduling approaches are (1) the successive approach, (2) the interactive approach, and (3) the semi-interactive approach. The successive approach is characterized by the computer scheduling all work orders without any human intervention. The interactive approach is distinguished by the human scheduling one work order at a time until all work orders are scheduled. The schedule is developed interactively by the person who must simultaneously consider work-order scheduling needs and machine group load capacities. The semi-interactive approach may be viewed as a combination of the successive and interactive approaches. Work orders are automatically scheduled one at a time using the successive approach criteria, but with prespecified machine-group load thresholds. As long as the load threshold is not exceeded, the successive approach is used to schedule work orders. When a threshold is exceeded, the algorithm (successive approach) pauses and human rescheduling (interactive approach) is required to rectify the overload situation. A second (reallocation) phase, identical for all three approaches, is used to overcome any scheduling problems generated in phase one. Experimental results based on nine different performance criteria (including scheduling time, makespan, machine group utilization, and work-in-process inventory) and 45 experimental runs indicate that there are differences between the results produced by the three scheduling approaches. The interactive approach yields the best overall scheduling results, but the other two approaches are clearly better than the interactive approach in some situations. The success of the interactive approach indicates that it is usually best for the human scheduler to become involved early in the computer-based job shop scheduling process.
相似文献