首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   3篇
  免费   0篇
管理学   3篇
  1977年   1篇
  1976年   1篇
  1975年   1篇
排序方式: 共有3条查询结果,搜索用时 15 毫秒
1
1.
A chance constrained programming model is developed to arrive at an optimal long-range design for a manufacturing facility. The determination of process capacities, the amounts of the various types of equipment, and the time-phasing of the acquisition constitutes facility design in the study. The expected cost is minimised, subject to probabilistic constraints which express the risk associated with demand forecasts. The model is solved by decomposing the deterministic equivalent. The structure of the model enables the solution to be obtained with one iteration. The algorithm is incorporated into a computer code which is applied to the design of a tire plant. The methodology has the potential of extendability to nonmanufacturing systems.  相似文献   
2.
3.
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号