首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   87篇
  免费   0篇
管理学   83篇
理论方法论   1篇
社会学   3篇
  2018年   1篇
  2017年   1篇
  2013年   1篇
  2007年   1篇
  1989年   1篇
  1988年   1篇
  1987年   1篇
  1985年   5篇
  1984年   4篇
  1983年   3篇
  1982年   6篇
  1981年   3篇
  1980年   4篇
  1979年   7篇
  1978年   6篇
  1977年   8篇
  1976年   7篇
  1975年   10篇
  1974年   9篇
  1973年   8篇
排序方式: 共有87条查询结果,搜索用时 31 毫秒
1.
Samuel Eilon  Judith Teague 《Omega》1973,1(5):565-576
The welfare of an individual enterprise, as well as that of the national economy, very much depends on productivity. But it appears that methods for determining measures of productivity are lamentably unsophisticated and lead to many ambiguities and inconsistencies. It is generally suggested that productivity represents some ratio of output to input, but existing measures of inputs and outputs are unsatisfactory, largely because they gloss over the difficulties of reducing multi-inputs and multi-outputs to single denominators. This paper examines certain approaches that may be developed to handle some of the measurement problems involved in this area.  相似文献   
2.
Samuel Eilon 《Omega》1978,6(2):103-108
  相似文献   
3.
Equal pay     
Samuel Eilon 《Omega》1976,4(3):245-250
  相似文献   
4.
5.
S Eilon  Bela Gold  Judith Soesan 《Omega》1975,3(3):329-343
This paper describes a case study in the application of a productivity analysis model in a plant producing industrial gases. Although the process is a relatively simple one, several inputs (labour, electricity, capital and some materials) and several outputs (liquid and gaseous oxygen, gaseous nitrogen, argon and a hydrogen-nitrogen mixture) are involved. The case study demonstrates how measures of total input and total output can be applied and analyses the performance of the plant over a 15-month period in terms of a variety of managerial control ratios.  相似文献   
6.
7.
Samuel Eilon 《Omega》1985,13(5):453-468
When several products are processed one at a time on a single machine, the conventional approach of computing the economic batch quantity for each product cannot apply. An example for six products is considered, where the total production capacity on regular time is inadequate, so that overtime has to be used at an extra cost. A simple method is described for solving this problem when each product is produced once during a production cycle, the objective being to minimize the total set-up and holding costs per day. Schedules which involve batch splitting can reduce these costs further, and a guideline is proposed for the construction of sub-cycles. The results compare favourably with lower bounds computed for the purpose.  相似文献   
8.
9.
10.
Samuel Eilon 《Omega》1979,7(3):173-177
  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号