首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   3篇
  免费   0篇
管理学   3篇
  2021年   1篇
  2013年   1篇
  2011年   1篇
排序方式: 共有3条查询结果,搜索用时 93 毫秒
1
1.
We consider a generalization of the proportionate flow shop problem with the makespan objective. Each job has a processing requirement and each machine has a characteristic value. In our case, we assume that the time a job occupies a machine is equal to the processing requirement of the job plus a setup time that is equal to the characteristic value of that machine. In this paper, we consider permutation schedules and show that the problem is solvable in polynomial time when the number of machines is fixed.  相似文献   
2.
We consider a two-stage flexible flow shop problem with a single machine at one stage and m identical machines at the other stage, where the processing times of each job at both stages are identical. The objective is to minimize the makespan. We describe some optimality conditions and show that the problem is NP-hard when m is fixed. Finally, we present an approximation algorithm that has a worst-case performance ratio of $\frac{5}{4}$ for m=2 and $\frac{\sqrt{1+m^{2}}+1+m}{2m}$ for m≥3.  相似文献   
3.

We consider a single-machine scheduling problem such that the due dates are assigned to each job depending on its order, and the lengths of the intervals between consecutive due dates are identical. The objective is to minimize the total penalty for the earliness and tardiness of each job. The early penalty proportionally increases according to the earliness amount, while the tardy penalty increases according to the step function. We show that the problem is strongly NP-hard, and furthermore, polynomially solvable if the two types of processing times exist.

  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号