排序方式: 共有2条查询结果,搜索用时 0 毫秒
1
1.
2.
Mathematical and simulation models studying work-rest schedules in a production process are developed to arrive at an optimal rest policy to maximize work output per unit time. A CSMP simulation study is used to test the sensitivity of the results for different specific cases. 相似文献
1