首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
管理学   1篇
  1986年   1篇
排序方式: 共有1条查询结果,搜索用时 15 毫秒
1
1.
A risk assessment comparing the acute effects of mineral oil and PCB-askarel dielectric fluids in two transformer sites was performed. The first site has the installation characteristics for a PCB-askarel-filled transformer with sprinkler fire protection. A risk comparison is made between two types of transformers (PCB-askarel-filled and mineral oil-filled) for this site. The second site (a vault) has the installation characteristics for a mineral oil-filled transformer, and a risk comparison is made in a fashion similar to the first site. Risk is expressed in terms of frequencies of one or more acute injuries or fatalities per transformer year.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号