首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   69篇
  免费   0篇
管理学   45篇
人口学   2篇
丛书文集   3篇
理论方法论   4篇
综合类   15篇
  2014年   1篇
  2013年   5篇
  2012年   1篇
  2011年   3篇
  2010年   2篇
  2009年   1篇
  2008年   1篇
  2007年   3篇
  2006年   3篇
  2005年   3篇
  2004年   3篇
  2003年   1篇
  2002年   4篇
  2000年   1篇
  1999年   1篇
  1998年   2篇
  1993年   1篇
  1992年   3篇
  1991年   2篇
  1990年   4篇
  1989年   4篇
  1988年   5篇
  1986年   1篇
  1985年   5篇
  1984年   3篇
  1983年   2篇
  1982年   1篇
  1981年   2篇
  1980年   1篇
排序方式: 共有69条查询结果,搜索用时 31 毫秒
1.
Reuven Karni 《决策科学》1985,16(3):284-298
Conventional production planning methods assume the existence of a medium- or longrange demand horizon. However, demand usually is known over a much shorter range; scheduling decisions must be made within this “decision window,” which rolls forward in time. This paper presents a new lower bound for lot-sizing heuristics in a rolling-horizon framework and compares it to the well-known Wagner-Whitin bound. The new bound indicates heuristic schedules that have costs close to the optimum. Rolling-horizon schedule costs are compared to corresponding static-horizon schedule costs (assuming the whole horizon is known in advance), using the ratio of decision-window size to the natural order cycle as a parameter. For values below unity, the rolling-horizon policy is significantly more costly. For values above one, the two policies have similar costs and actually converge as the parameter value increases.  相似文献   
2.
This paper analyzes the cost increases due to demand uncertainty in single-level MRP lot sizing on a rolling horizon. It is shown that forecast errors have a tremendous effect on the cost effectiveness of lot-sizing techniques even when these forecast errors are small. Moreover, the cost differences between different techniques become rather insignificant in the presence of forecast errors. Since most industrial firms face demand uncertainty to some extent, our findings may have important managerial implications. Various simulation experiments give insight into both the nature and the magnitude of the cost increases for different heuristics. Analytical results are developed for the constant-demand case with random noise and forecasting by exponential smoothing. It is also shown how optimal buffers can be obtained by use of a simple model. Although the analysis in this paper is restricted to simplified cases, the results merit further consideration and study. This paper is one of the first to inject forecast errors into MRP lot-sizing research. As such it attempts to deal with one of the major objections against the practical relevance of previous research in this area.  相似文献   
3.
We believe there are some serious deficiencies in the Morecroft article on MRP problems which appeared in a recent issue of this journal. The article, at the most, shows that MRP, inappropriately imposed on an existing production system, can result in undesirable system performance. This does not represent a new or startling conclusion. Four problem areas in the article are discussed, and suggested alternative approaches are offered.  相似文献   
4.
This paper is concerned with planning work-center capacity levels in manufacturing firms that employ a material requirements planning (MRP) system. It presents four procedures for developing work-center capacity plans designed to insure the production of components and assemblies as specified by the MRP plan and the master production schedule (MPS). These procedures (capacity planning using overall factors, capacity bills, resource profiles, and capacity requirements planning) are compared using simulation analysis. The results indicate that the performance of a procedure when measured against the MPS depends on the operating conditions of the manufacturing system. The results also indicate that the choice of a particular procedure often represents a compromise among the benefits of improved MPS performance, the costs of preparing and processing data, and the premium expenses required for more frequent adjustments in work-center capacity levels.  相似文献   
5.
6.
We test the situational impact of two types of resource flexibility, machine flexibility and labor flexibility, in a material requirements planning (MRP)-driven production system. Machine flexibility has not been treated in prior multistage research, only labor flexibility. Machine flexibility is closely related to a plant's positioning strategy. A process-focused plant opts for considerable machine flexibility by choosing general-purpose equipment. Resource flexibility, if effective, can be an attractive alternative to two other types of buffers, inflated inventories and costly capacity cushions. Our simulation results, using factor settings established earlier by a panel of managers, show that resource flexibility is indeed an effective buffer against uncertainties such as end-item demand variability, capacity bottlenecks, equipment failures, and yield losses. Machine flexibility is especially helpful in environments characterized by high uncertainties, tight capacities, and large lot sizes. Worker flexibility has a similar, but less dramatic, impact. Benefits are most striking with customer service, rather than with inventory or labor productivity. Finally, we show that simultaneous introduction of both machine and labor flexibility yields only marginal improvements over either kind of flexibility alone.  相似文献   
7.
Two heuristics based on branch and bound (B&B) are developed to solve closed-loop material requirements planning (MRP) lot-sizing problems that have general product structures and variable costs. A “look ahead method'’(LAM) heuristic allows for variable production/purchasing costs and uses a single-level B&B procedure to rapidly improve lower bound values; thus, LAM efficiently uses computer-storage capacity and allows solution of larger problems. The “total average modification'’(TAM) heuristic uses B&B, applied level by level, and modified setup and carrying costs to solve the variable production/purchasing costs MRP lot-sizing problem. LAM and TAM are tested on problems and compared to heuristics in the literature. TAM may be used to solve large MRP lot-sizing problems encountered in practice.  相似文献   
8.
Previous research on material requirements planning (MRP) systems has rarely considered the impact of the master production scheduling method used to promise customer orders and to allocate production capacity. Based on a simulation study of an MRP environment, we show that the correct selection of a master production schedule (MPS) method depends on the variance of end-item demand. In addition, we find evidence that the effectiveness of a particular MPS method can be enhanced by holding buffer inventory at the same level in the product structure as in the MPS.  相似文献   
9.
田香兰 《社会工作》2011,(16):59-61,65
人口老龄化究竟是挑战还是机遇,关键在于如何充分利用老年人力资源,推动老有所为,实现积极老龄化。参与社会,扩大交流是中日韩三国老年人的共同要求。要充分认识到当前中日韩民间交流中的老年人的作用,切实推进老年人的文化交流与民间往来。中日韩三国积极老龄化的成功经验和有效做法具有相互学习和借鉴的价值,三国在应对人口老龄化领域有着广阔的合作空间和前景。中日韩三国应长期、积极地开展交流与合作。  相似文献   
10.
In this paper, a hierarchical planning system is proposed which integrates aggregate capacity planning with MRP. This system is to be implemented in a metal box manufacturing company which multi-user MRP system covering manufacturing activities as well as procurement sales order processing and accounting systems. The hierarchical planning system includes a medium-range aggregate planning model adapted to the firm's requirements and strategies. The model consists of a mathematical formulation which covers labour capacity has already installed a constraints and includes certain cost estimations in the objective function. The planning horizon of the medium range planning is taken as twelve months in order to cover sales seasonality. The aggregate production quantities resulting from the optimized medium-range planning model are disaggregated according to procedures already found in the literature. Furthermore, the theoretical infeasibilities pertaining to the disaggregation procedures are also resolved in an heuristic manner. Using the latter modified disaggregation procedure, a feasible disaggregated plan is generated for the whole planning horizon. The proposed plan is compared with the current production policy of the firm and it is observed that the proposed plan leads to backorder reduction.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号