Capturing and Integrating Knowledge for Managing Risks in Tunnel Works
Authors:Ibsen Chivatá Cárdenas  Saad SH Al‐jibouri  Johannes IM Halman  Frits A van Tol
Institution:1. Department of Construction Management and Engineering, University of Twente, Enschede, The Netherlands;2. Section Geoengineering, Delft University of Technology, 2600 GA, Delft, The Netherlands
Abstract:Risk‐related knowledge gained from past construction projects is regarded as potentially extremely useful in risk management. This article describes a proposed approach to capture and integrate risk‐related knowledge to support decision making in construction projects. To ameliorate the problem related to the scarcity of risks information often encountered in construction projects, Bayesian Belief Networks are used and expert judgment is elicited to augment available information. Particularly, the article provides an overview of judgment‐based biases that can appear in the elicitation of judgments for constructing Bayesian Networks and the provisos that can be made in this respect to minimize these types of bias. The proposed approach is successfully applied to develop six models for top risks in tunnel works. More than 30 tunneling experts in the Netherlands and Germany were involved in the investigation to provide information on identifying relevant scenarios than can lead to failure events associated with tunneling risks. The article has provided an illustration of the applicability of the developed approach for the case of “face instability in soft soils using slurry shields.”
Keywords:Bayesian Belief Networks  epistemic uncertainty  expert judgment elicitation  reliability modeling  risk‐related knowledge integration  risk modeling
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号