基于个体—环境匹配的施工项目经理能力不足风险量测方法
引用本文:李晶晶,张飞涟,刘建军,王靖.基于个体—环境匹配的施工项目经理能力不足风险量测方法[J].吉首大学学报(社会科学版),2018,39(2):139-144.
作者姓名:李晶晶  张飞涟  刘建军  王靖
作者单位:(1.中南大学 土木工程学院,湖南 长沙 410083;2.长沙理工大学 交通运输工程学院,湖南 长沙 410114;3.湖南广播电视大学 湖南,长沙,410004)
基金项目:湖南省哲学社会科学基金项目(2010YBA003);湖南省教育厅科学研究优秀青年项目(14B030)
摘    要:基于匹配性理论,采用施工项目经理个体能力与施工环境能力需求之间的不匹配程度量测能力不足风险,构建了施工项目经理能力不足风险质量屋。建立施工项目经理能力、施工环境评价指标体系,以及二元语义转换的标准化复合标度值的综合评价模型,通过项目经理能力对不利环境的支持程度分析,确定能力需求。在此基础上,分析人—职、人—组织、人—职业环境三个层次的不匹配程度,依据木桶理论量测施工项目经理能力不足风险。以某轨道施工项目为例开展方法实证验证。

关 键 词:能力不足风险  个体—环境匹配  施工项目经理  

Measurement of the Risk of Insufficient Capacity of the Construction Project Manager Based on Individual-Environment Fit
LI Jingjing,ZHANG Feilian,LIU Jianjun,WANG Jing.Measurement of the Risk of Insufficient Capacity of the Construction Project Manager Based on Individual-Environment Fit[J].Journal of Jishou University(Social Science),2018,39(2):139-144.
Authors:LI Jingjing  ZHANG Feilian  LIU Jianjun  WANG Jing
Institution:(1.School of Engineering,Central South University,Changsha 410083,China;2.College of Traffic and Transportation Engineering,Changsha University of Science and Technology,Changsha 410114,China;3.Hunan Radio and TV University,Changsha 410004,China)
Abstract:Based on the fit theory,a risk quality house is built through adopting the unfit degree to measure the risk of insufficient capacity of the construction project manager in the individual capacity and the capacity of the construction environment requirement.A comprehensive evaluation model of the capacity of construction project manager,index system of construction environment evaluation,and standardized composite scale value of binary semantic conversion is established.The capacity of the construction environment requirement is determined by the support degree of the capacity attribute to the unfriendly project environment.Three levels of the unfit degree are analyzed,including the individual-job unfit,the individual-organization unfit and the individual-vocation unfit.The risk of insufficient capacity is measured according to the barrel theory,a track construction project being the example of the verification of measurement.
Keywords:risk of insufficient capacity                                                                                                                        individual-environment fit                                                                                                                        construction project manager
点击此处可从《吉首大学学报(社会科学版)》浏览原始摘要信息