单塔无背索斜拉桥索塔施工技术 |
| |
引用本文: | 冯军武.单塔无背索斜拉桥索塔施工技术[J].石家庄铁道学院学报(社会科学版),2010(1):102. |
| |
作者姓名: | 冯军武 |
| |
作者单位: | 中铁二十局集团 第三工程有限公司 |
| |
摘 要: | 结合代家湾单塔无背索斜拉桥主塔施工实践经验,重点介绍索塔施工工艺、索塔整体提升模板体系以及索塔线形控制等,总结单塔无背索斜拉桥索塔施工控制技术,为同类桥梁施工提供借鉴。
|
关 键 词: | 单塔无背索斜拉桥 索塔 施工 |
收稿时间: | 2009/11/23 0:00:00 |
Pylon Construction for Single Tower Cable stayed Bridge Without Back Stays |
| |
Authors: | Feng Junwu |
| |
Institution: | The 3rd Engineering Company, Ltd., the 20th China Railway Construction Bureau Group |
| |
Abstract: | Based on the construction experience of Daijiawan single tower cable stayed bridge without back stays, the pylon construction technology, the hoisting formwork system for pylon construction and the configuration control of the pylon are introduced in details, which can be used as reference in similar bridge projects. |
| |
Keywords: | single tower cable stayed bridge without back stays skew pylon construction |
|
| 点击此处可从《石家庄铁道学院学报(社会科学版)》浏览原始摘要信息 |
| 点击此处可从《石家庄铁道学院学报(社会科学版)》下载免费的PDF全文 |