Abstract: | The first three steps of a new design method for decision support systems in production scheduling tasks are applied to a large bulk terminal. The operational characteristics of the company largely correspond with those of typical semiprocess industries. The design model used consists of five steps: production analysis, task analysis, task redesign, decision support design and decision support implementation. The results of the application of the design model up to the task redesign step are described. |