首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Combined demand and lead time uncertainty with back-ordering in a multi-level product structure environment
Authors:LOUIS BRENNAN  SURENDRA M GUPTA
Institution:Department of Industrial Engineering and Information Systems , Northeastern University , Boston, MA, 02115, USA
Abstract:The performance of two lot-sizing algorithms incorporating back-orders is evaluated and compared with several traditional lot-sizing rules. This comparison is undertaken for a multi-level product structure environment operating under a rolling horizon in the presence of both demand and lead time uncertainties. By means of simulation and statistical analysis of the simulation output, the impact on system performance of a variety of demand and lead time scenarios, product structures, cost parameters and lot-sizing, is evaluated. The conclusions drawn emphasize important differences in the influence of the factors on system performance given the presence or absence of uncertainty.
Keywords:material requirements planning (MRP)  uncertainty  lot-sizing  back-ordering
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号