Abstract: | Capacity planning is a critical element of any successful production planning and control system. A method of rough-cut capacity planning is developed, based on the bill-of-resources approach, that can be used to plan for capacity required for firms in a remanufacturing including overhaul repair operations environment. The modified bill-of-resources approach developed takes into account two major stochastic elements inherent in this environment; probabilistic material replacement factors and probabilistic routing files. A detailed example from an actual repair overhaul operation is presented to illustrate the technique. |