Setups and effective capacity: the impact of lot sizing techniques in an MRP environment
Authors:STANLEY C GARDINER  J H BLACKSTONE JR
Institution:1. Department of Management , College of Business, Auburn University , AL, 36849, USA;2. Department of Management , Terry College of Business, University of Georgia , Athens, GA, USA
Abstract:This study investigates how lot sizing techniques influence the profit performance, inventory level, and order lardiness of an assembly job shop controlled by MRP. Four single-level lot sizing techniques are compared by simulation analysis under two levels of master schedule instability and two levels of end item demand. A second analysis investigates the influence of a multilevel lot sizing technique, the generalized constrained-K (GCK) cost modification, on the four single-level techniques at low demand and low nervousness. The analyses reveal a previously unreported phenomenon. Given the same inventory costs, the single-level lot sizing techniques generate substantially different average batch sizes. The lot sizing techniques maintain the following order of increasing average batch size (and decreasing total setup time):

economic order quantity (EOQ)

period order quantity (POQ)

least total cost (LTC)

Silver-Meal heuristic (SML)

The causes for different average batch sizes among the lot sizing techniques are analysed and explained. Demand lumpiness, inherent in multilevel manufacturing systems controlled by MRP, is found to be a major factor. The number of setups each lot sizing technique generates is the primary determinant of profit performance, inventory level, and order tardiness. EOQ, a fixed order quantity technique, is less sensitive to nervousness than the discrete lot sizing techniques. EOQ_, however, generates the smallest average batch size, and, therefore, the most setups. Since setups consume capacity, EOQ, is more sensitive to higher demand. SML generates the largest average batch sizes, and is, therefore, less sensitive to increased demand. At low demand, the other lot sizing techniques perform better on all criteria. They generate smaller batches and, therefore, shorter actual lead times. The GCK cost modification increases the average batch size generated by each lot sizing technique. GCK improves the profit and customer service level of EOQ the lot sizing technique with the smallest batches. GCK causes the other lot sizing techniques to generate excessively large batches and, therefore, excessively long actual lead times.
Keywords:capacity  lot sizing  setup  material requirements planning