首页 | 本学科首页   官方微博 | 高级检索  
     

合同能源管理模式下节能项目经营期计算模型
引用本文:王付海,周奇琛. 合同能源管理模式下节能项目经营期计算模型[J]. 集美大学学报(哲学社会科学版), 2011, 14(4): 59-64
作者姓名:王付海  周奇琛
作者单位:1. 华侨大学财务处,福建厦门,361021
2. 华侨大学土木学院,福建厦门,361021
摘    要:当前,建筑节能服务公司在实施基于合同能源管理的建筑节能项目过程中存在一个主要障碍,就是建筑节能服务公司和客户在如何确定项目的节能效益分享期限上很难达成共识。合同能源管理模式下的建筑节能项目运行期的确定既要考虑节能服务公司的利益,还要考虑项目移交给客户后的节能收益。从风险和收益角度出发,针对节能项目经营期(即合同期)和项目移交给客户后的经营期两个阶段,分别采用了不同的贴现率,对节能服务公司的净现值计算采用了基于CAPM模型确定的风险校正贴现率,而对客户的净现值分析则采用考虑银行贷款利率和通货膨胀率的贴现率。在此基础上,构建了建筑节能服务公司的项目经营期决策模型,为科学合理地确定节能项目的经营期提供了理论基础。

关 键 词:节能项目  合同能源管理  项目经营期  CAPM

Calculating Model for Energy-saving Project Operation Period under the Energy Performance Contracting
WANG Fu-hai,ZHOU Qi-chen. Calculating Model for Energy-saving Project Operation Period under the Energy Performance Contracting[J]. Journal of Jimei University (Philosophy and Social Sciences), 2011, 14(4): 59-64
Authors:WANG Fu-hai  ZHOU Qi-chen
Affiliation:WANG Fu-hai1,ZHOU Qi-chen2(1.Financial Department,Huaqiao University,Xiamen 361021,China,2.College of Civil Engineering,China)
Abstract:At present, Building Energy Management Corporation and its customers, the two sides find it hard to agree on the period of sharing the energy-saving benefit under the energy performance contracting. To determine the operation period of energy - saving projects involves considering both the BEMCo's operating income and the consumer's energy-efficient benefits under the energy performance contracting. Both from risks and benefits, this paper proposes employing two different discount rates respectively for the two stages before and after the transfer of energy-saving projects. BEMCo's NPV is calculated by referring to risk-adjusted discount rate which is based on CAPM, and consumer's NPV is calculated on discount rate which is estimated by taking account of loan interest rate and rate of inflation. On this basis, a calculating model for energy-saving project operation period is established. The research results can be used to help Building Energy Management Corporation to determine a reasonable energy - saving project operation period.
Keywords:energy-saving projects  energy performance contracting  project operation period  Capital Asset Pricing Model (CAPM)
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号