首页 | 本学科首页   官方微博 | 高级检索  
     


Inventory Control when the Lead‐time Changes
Authors:Sven Axsä  ter
Abstract:A single‐echelon inventory system with continuous review and Poisson demand is considered. There are standard linear holding and backorder costs but no ordering or set‐up costs. We study a change in the lead‐time, which is rather typical in connection with application of a Just‐In‐Time philosophy. Our main focus is a lead‐time decrease but we also consider a lead‐time increase. Due to the lead‐time change, the optimal steady state solution will also, in general, change. We consider the transient problem of minimizing the costs when bringing the system from its original steady state to the new steady state.
Keywords:inventory management  stochastic  JIT  transient
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号