首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A multi-objective particle swarm for a flow shop scheduling problem
Authors:A R Rahimi-Vahed  S M Mirghorbani
Institution:(1) Department of Industrial Engineering, Faculty of Engineering, University of Tehran, Tehran, Iran
Abstract:Flow shop problems as a typical manufacturing challenge have gained wide attention in academic fields. In this paper, we consider a bi-criteria permutation flow shop scheduling problem, where weighted mean completion time and weighted mean tardiness are to be minimized simultaneously. Since a flow shop scheduling problem has been proved to be NP-hard in strong sense, an effective multi-objective particle swarm (MOPS), exploiting a new concept of the Ideal Point and a new approach to specify the superior particle's position vector in the swarm, is designed and used for finding locally Pareto-optimal frontier of the problem. To prove the efficiency of the proposed algorithm, various test problems are solved and the reliability of the proposed algorithm, based on some comparison metrics, is compared with a distinguished multi-objective genetic algorithm, i.e. SPEA-II. The computational results show that the proposed MOPS performs better than the genetic algorithm, especially for the large-sized problems.
Keywords:Bi-criteria flow shop scheduling problem  Permutation flow shop  Multi-objective particle swarm  Multi-objective genetic algorithm
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号