首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Single-machine scheduling with production and rejection costs to minimize the maximum earliness
Authors:Lingfa Lu  Liqi Zhang
Institution:1.School of Mathematics and Statistics,Zhengzhou University,Zhengzhou,People’s Republic of China;2.College of Information and Management Science,Henan Agricultural University,Zhengzhou,People’s Republic of China
Abstract:In this paper, we consider the single-machine scheduling problem with production and rejection costs to minimize the maximum earliness. If a job is accepted, then this job must be processed on the machine and a corresponding production cost needs be paid. If the job is rejected, then a corresponding rejection cost has to be paid. The objective is to minimize the sum of the maximum earliness of the accepted jobs, the total production cost of the accepted jobs and the total rejection cost of the rejected jobs. We show that this problem is equivalent to a single-machine scheduling problem to minimize the maximum earliness with two distinct rejection modes. In the latter problem, rejection cost might be negative in the rejection-award mode which is different from the traditional rejection-penalty mode in the previous literatures. We show that both of two problems are NP-hard in the ordinary sense and then provide two pseudo-polynomial-time algorithms to solve them. Finally, we also show that three special cases can be solved in polynomial time.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号