Scheduling a single semi-continuous batching machine |
| |
Authors: | Lixin Tang Yufang Zhao |
| |
Affiliation: | aThe Logistics Institute, Northeastern University, Shenyang 110004, China |
| |
Abstract: | This paper addresses a new problem, called semi-continuous batch scheduling, which arises in the heating-operation of tube-billets in the steel industry. Each heating furnace can be regarded as a semi-continuous batching machine, which can handle up to C jobs simultaneously. The jobs in the same batch enter and leave the machine semi-continuously, which differs from the traditional batching machine scheduling where the jobs in same batch have a starting time and a finishing time. In this paper the processing time of a batch depends on the capacity of the semi-continuous batching machine, the longest processing time of jobs in the batch and its size. The objectives are to schedule jobs on the machine so that the makespan and the total completion time are minimized. A schedule for a semi-continuous batching machine consists of a batching and sequencing for the batches. We propose the optimal properties of two different objective functions and present the different dynamic programming algorithms with a running time of O(n2), respectively. |
| |
Keywords: | Scheduling Semi-continuous batching machine Dynamic programming algorithm |
本文献已被 ScienceDirect 等数据库收录! |
|