首页 | 本学科首页   官方微博 | 高级检索  
     


Cost minimization of large-scale infrastructure for electricity generation and transmission
Affiliation:1. Chair for Information Systems Research, University of Freiburg, Platz der Alten Synagoge, Freiburg 79098, Germany;2. ETH Zurich, Weinbergstr. 56/58, Zurich 8092, Switzerland
Abstract:Electricity infrastructure confronts societies with immense costs as it must ensure the generation of power and its transmission to locations with consumption requirements. We minimize these costs by formulating an electricity generation and transmission problem that facilitates the design of electricity infrastructure on a macro level. Our problem specifies the capacity, type, and location of power plants and, at the same time, determines the appropriate arrangement of high-voltage transmission lines in order to fulfill the demand of individual cities. We specifically incorporate the non-linear nature of cost functions for power generation that are common in practice. This results in a mixed integer non-linear problem, for which the branch-and-reduce solver from GAMS exceeds runtime constraints, even for small instances with 25 locations. As a remedy, we develop heuristics based on the reduced variable neighborhood search and the greedy randomized adaptive search procedure (GRASP). Their performance enables us to address large-scale problems that arise in real-world applications. We demonstrate this with an actual, nationwide example that spans all 4537 municipalities in Germany.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号