首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Estimation and Confidence Intervals for Clock Offset in Networks with Bivariate Exponential Delays
Authors:Jeff Pettyjohn  Jun Li
Institution:Department of Statistics , University of California-Riverside , Riverside , California , USA
Abstract:There is a large and increasing literature on statistical modeling-based estimation of the offset between two clocks. Recent work has focused on the construction of confidence intervals for offset. However, in most of this work it has been assumed that the network delays that occur during the synchronization process are independent. The network delays are often modeled as independent exponential random variables. Thus, we introduce the use of a bivariate exponential distribution to capture the anticipated correlation between the network delays and derive a maximum likelihood estimator and a confidence interval procedure for the offset parameter. We then illustrate how use of the independent model for network delays can lead to improper inference about the offset parameter.
Keywords:Bivariate exponential distributions  Bootstrap calibration  Clock offset  Clock synchronization  Maximum likelihood estimation
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号