首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于混合流水作业组织的集装箱码头装卸作业集成调度优化
引用本文:邢曦文,毛钧,张睿,靳志宏.基于混合流水作业组织的集装箱码头装卸作业集成调度优化[J].中国管理科学,2014,22(10):97-105.
作者姓名:邢曦文  毛钧  张睿  靳志宏
作者单位:1. 大连海事大学 交通运输管理学院, 辽宁 大连 116026; 2. 大连中铁联合国际集装箱有限公司, 辽宁 大连 116004
基金项目:国家自然科学基金项目(71172108);教育部高等学校博士学科点专项科研基金(博导类)(20122125110009);大连市科技计划项目(2012A17GX125);中央高校基本科研业务费专项资金资助(3132013320)
摘    要:集装箱码头集疏运资源调度的对象是由岸桥、集卡、场桥所构成的多阶段一体化的集装箱装、卸、运操作系统,将该系统的调度优化基于多阶段混合流水线调度问题建立混合整数规划模型,同时考虑集装箱码头现实作业中预定义顺序、避免岸桥交叉作业、以及取决于作业顺序的切换时间等现实约束,针对问题自身的特点设计了两阶段启发式算法,得出各阶段设备的指派结果及作业顺序。通过与基于现行调度规则的调度方案以及与目标函数理论下界值的对比实验,显示了所提出的集成调度模型及求解算法能够有效降低船舶在港时间并实现集卡资源的共享,为集装箱码头集疏运资源的集成调度提供了新的思路。

关 键 词:集装箱码头  作业调度  混合流水线  约翰逊规则  动态指派  
收稿时间:2012-04-06
修稿时间:2013-05-12

Optimization of Container Loading/unloading Integrated Scheduling in a Container Terminal Based on Hybrid Flowshop
XING Xi-wen,MAO Jun,ZHANG Rui,JIN Zhi-hong.Optimization of Container Loading/unloading Integrated Scheduling in a Container Terminal Based on Hybrid Flowshop[J].Chinese Journal of Management Science,2014,22(10):97-105.
Authors:XING Xi-wen  MAO Jun  ZHANG Rui  JIN Zhi-hong
Institution:1. Dalian Maritime University, Transportation management institute, Dalian 116026, China; 2. Dalian China Railway International Container limited company, Dalian 116004, China
Abstract:The research object of the container terminal collection and distribution resource scheduling is a multi-stage integrated operating system including loading, unloading and transporting containers, consisting of quay-cranes, container trucks and yard-cranes. The scheduling of the system is optimized based on the multi-stage hybrid flow shop scheduling to establish an integer programming model, taking into account the practical constraints of realistic jobs in the container terminal such as pre-defined sequence of operations, avoiding cross-operation and sequence-depended setup time and so on. A two-phase heuristic algorithm is designed for the problem according to the characteristics of itself, getting each equipment's assigning result and operating sequence in each stage. The comparative experiment, by comparing the optimal results with the scheduling scheme based on current scheduling rules and the theoretical lower bound of the objective function, shows the proposed integrated scheduling model and solution algorithm can effectively reduce the time of vessels in the harbor and realize the sharing of container trucks. This study provides a new method for integrated scheduling of container terminals.
Keywords:container terminal  scheduling  hybrid flow shop  Johnson rules  dynamic assignment  
点击此处可从《中国管理科学》浏览原始摘要信息
点击此处可从《中国管理科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号