A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule |
| |
Institution: | 1. Department of Industrial Engineering, Işık University, Şile, İstanbul, Türkiye;2. H. Milton Stewart School of Industrial and Systems Engineering, Georgia Institute of Technology, 755 Ferst Drive NW, Atlanta, GA 30332-0205, USA;3. Indian Institute of Management Bangalore, Bangalore, India;4. Econometric Institute, Erasmus School of Economics, Erasmus University Rotterdam, Rotterdam, The Netherlands;1. LGIPM, Lorraine University, Metz, France;2. Credit Agricole S.A., Paris, Ile de France, France |
| |
Abstract: | Due to unreliable production facility and stochastic preventive maintenance, deriving an optimal production inventory decision in practice is very complicated. In this paper, we develop a production model for deteriorating items with stochastic preventive maintenance time and rework using the first in first out (FIFO) rule. From our literature search, no study has been done on the above problem. The problem is solved using a simple search procedure; this makes it more practical for use by industries. Two case examples using uniform and exponential distribution preventive maintenance time are applied. Examples and sensitivity analysis are conducted for each case. The results show that rework and preventive maintenance time have significant affected the total cost and the optimal production time. This provides helpful managerial insights to help management in making smart decisions. |
| |
Keywords: | |
本文献已被 ScienceDirect 等数据库收录! |
|