首页 | 本学科首页   官方微博 | 高级检索  
     


PLANNING AND SCHEDULING THE REPAIR SHOPS OF THE DEUTSCHE LUFTHANSA AG: A HIERARCHICAL APPROACH
Authors:CHRISTOPH A. SCHNEEWEISS,HELMUT SCHRÖ  DER
Abstract:To plan and schedule the repair shops for recoverable parts at Deutsche Lufthansa AC, we designed a hierarchical model consisting of two levels. The top level calculates the optimal number of parts in the system to guarantee a certain service level while minimizing the capital tied up in parts. Given this provision, the lower level schedules the repair of parts so that the service level is actually maintained. Using queuing theory, the solution gives special attention to the different hierarchical dependencies. Lufthansa has implemented the model for its repair shops of electronic parts. Their experience with the model is discussed briefly.
Keywords:PRODUCTION PLANNING  LOGISTICS  HIERARCHICAL PLANNING  QUEUING THEORY
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号